This inspection and test plan outlines the inspection requirements for orifice plates and restrictor orifices. Key activities include:
1. Reviewing component drawings and bore calculations to ensure specifications and standards are met.
2. Inspecting raw materials through visual examination and dimensional checks according to material certificates and standards.
3. Machining orifice plates and conducting in-process dimensional inspections using CMM machines to check dimensions, diameters, concentricity, thickness, angles and flatness according to drawings and standards.
4. Performing a final visual and dimensional inspection to verify all measurements.
5. Ensuring required documentation such as material certificates, drawings, reports and certificates of
This inspection and test plan outlines the inspection requirements for orifice plates and restrictor orifices. Key activities include:
1. Reviewing component drawings and bore calculations to ensure specifications and standards are met.
2. Inspecting raw materials through visual examination and dimensional checks according to material certificates and standards.
3. Machining orifice plates and conducting in-process dimensional inspections using CMM machines to check dimensions, diameters, concentricity, thickness, angles and flatness according to drawings and standards.
4. Performing a final visual and dimensional inspection to verify all measurements.
5. Ensuring required documentation such as material certificates, drawings, reports and certificates of
This inspection and test plan outlines the inspection requirements for orifice plates and restrictor orifices. Key activities include:
1. Reviewing component drawings and bore calculations to ensure specifications and standards are met.
2. Inspecting raw materials through visual examination and dimensional checks according to material certificates and standards.
3. Machining orifice plates and conducting in-process dimensional inspections using CMM machines to check dimensions, diameters, concentricity, thickness, angles and flatness according to drawings and standards.
4. Performing a final visual and dimensional inspection to verify all measurements.
5. Ensuring required documentation such as material certificates, drawings, reports and certificates of
Customer XXXX End User : H= Hold ; M= Monitor Daniel Document No. : Orifice Plates_RO-04-XXXXXX-10-1010-01 W= Witness Revision : 0 S= Document Submission A= Approve R Review P Document Preparation V= Verify I= Inspection Su=Surveillance NA- Not Applicable ITEM Applicable codes / Specifications/ Inspection / Review by NO. Description of Test and Inspection Activity Acceptance Criteria Verifying Documents Vendor / Daniel Customer Remarks Sub- Contractor Orifice Plates & RO's 1.00 DOCUMENTS
1.01 Component Drawings As per ISO 5167 XXXXXX-09-0930-01-101 - P,S R
1.02 Bore Calculations As per ISO 5167 XXXXXX-09-0910-01-402 - P,S R
2.00 Raw Material Inspection
As per ASTM a) Visual Inspection, b) Dimensional & 2.01 Plates review of Raw mataterial test certs Material Test Certficates R,V R,V -
3.00 Orifice Plate & RO-in Process Inspection
3.1 Machining of Orifice Plates 3.1.1 Dimensional Inspection using CMM Machines only ISO 5167 and Approved Drawings Dimensional Report I,V Su / R - 3.1.2 Outside Diameter, Bore, Concentricity of Bore to O/D, ISO 5167 and Approved Drawings Dimensional Report I,V Su / R - Thickness of Plate, Orifice Bore length, 45 Degree Angle, Flatness of the plate
4.00 Final Inspection
Complete Visual and Dimensional Inspection All dimensions checked in 3.1.1,3.1.2 Dimensional Report I,V H,W -
5.00 Documentation Requirements
All Material Test Certificates As per ASTM Standards Material Test Certificate I,V R All Approved Drawings and Certified Drawings As per Customer PO As per Customer PO I,V R - Bore calculations As per ISO 5167 Report I,V R - CMM Report As built document CMM Report I,V H,W - Micrometer Reading Approved Drawings Dimensional Report I,V H,W - Certificate of Compliance ISO 5167 As per Customer PO I,V H,W -