HISTORY

Founded in 1985 by ENGR. FERNANDO C. LARANANG, FCL Construction was a


company that engaged in architectural, engineering and construction,
maintenance and consultancy services.

Headed by Engr. Fernando C. Laranang and a few competent workers, FCL


Construction headed for a remarkable entry in the industry on March
1985 as an official service provider and facility developer for the
Voice of America, Baguio Receiver plant and Voice of America Poro
Point Transmitter Plant.

Three years later, FCL Construction invaded new markets, bagging


another US based corporation, the Texas Instruments Philippines Inc.,
together with the US Ambassador’s residence in Baguio City.

From the 90’s onward, FCL Construction flourished into business over
the construction industry.

In July 2007, FCL Construction became FCLARANANG CORPORATIONS, with


FCLARANANG GENERAL CONSTRUCTION CORPORATION AND FCLARANANG GENERAL
SERVICES CORPORATION as its two groups of companies.

As of June 2013, FCLaranang Corporations changed its name to


FCLARANANG GROUP OF COMPANIES as a way of diversifying into other
lines of business. Under FCLaranang Group of Companies are FCLARANANG
DEVELOPMENT CORPORATION, FCLARANANG MANAGEMENT AND SERVICES
CORPORATION and FCLARANANG GAS CORPORATION.
MISSION AND VISION
To be the leading and most reputable provider of development (general
building and construction), management and services in all semi-con,
industrial and commercial establishments, as well as to be one of the
most reliable Petron dealers in the country through a continuous
pursuit for improvement and fervent commitment to constantly deliver
quality and timely services.

OUR CORE VALUES


Client Satisfaction

Our goal is to exceed our clients’ expectations to ensure client trust


and satisfaction.
Commitment To Excellent And Timely Services

We do not fail in our commitment delivery. Our focus is on outstanding


and well-timed service provision.
Integrity
We strive for honorable and honest working relationships with the team
and with our clients.
Social Responsibility
We carefully consider the impact of our company actions or projects on
our customers, suppliers, employees, the community and the environment
in mind.
Services

FCLARANANG DEVELOPMENT CORPORATION:


We are a licensed contractor in PCAB (Philippine
Contractors’ Accreditation Board) as category “A”
under General Building and General Engineering with
license number 33518.

GENERAL BUILDING
Building of Industrial plant and park, playground or recreational
work.
GENERAL ENGINEERING

Plumbing and Sanitary works


Electrical, Painting & Electromechanical works
Commercial and residential condominiums
Shopping malls
Adventure/leisure parks
Leasing
OTHERS

Real estate and land development (Buying, developing and selling real
estate)
Fire protection works
Commercial and residential condominiums
Other related services
FCLARANANG MANAGEMENT AND SERVICES CORPORATION :
GENERAL SERVICES

Repair of buildings and equipment


OTHERS
Hospitality services
Operate and manage hotels, bars and restaurants
Trading of goods (wholesale and retail basis)
Cleaning, janitorial services
Other related services

FCLARANANG GAS CORPORATION :


GENERAL SERVICES
Trading of goods such as diesel, gasoline, oil and
other allied products wholesale and retail basis
located at #1 Naguilian road, corner Ferguson road.
OTHERS
Car maintenance services
Convenience store

FEATURED CLIENTS

•Megapines Realty And Development Corporation •TBS Realty And Development Corporation

•Texas Instruments
•US Embassy

•Gerry’s Grill
•Fax Parcel ‘N Print
•Ideal Vision Center
•Voice Of America

•Taiyo Nippon Sanso


FEATURED PROJECT

PROJECT: (6)BASEMENT – 5 STOREYS W/ DECK DORMITORY


LOCATION:BONIFACIO ST. B.C
OWNER:GENOROZO B. MENDOZA JR.

•11 STOREYS-DORMITORY
The project is an 11 storeys dormitory which comprises of 6
floors of basements and 5 floors above ground level. The
project started last December 2017 and is expected to end
first quarter next year.
•BUILDING PERMIT
•ORGANIZATIONAL CHART
•LOGBOOK
•ACCOMPLISHMENT REPORT

SATURDAY, APRIL 28, 2018

ACCOMPLISHMENT REPORT
(March 1, 2018 – April 27 2018)

I. Accomplishment :
15.7623%

II. Weather
Fair : 1.23%
Sunny : 74.07%
Rainy : 12.50%
Stormy : 0.50%
Cloudy : 11.70%

III. Equipment
2 Unit – Vibrator Motor w/ Hose 1 Unit – Power
Spray
1 Unit – Electric Bar Cutter 1 Unit –
Hilti Drill
1 Unit – Electric Bar Bender
1 Unit – Welding Machine
2 Unit – Tamping Hammer
1 Unit – Dumpy Level
2 Unit – PC 200 Backhoe
III. Manpower

Project Manager : 1 Steelman : 6


Project Superintendent : 1 Carpenter : 6
Site Engineer : 2 Electrician : 1
AutoCad Operator : 1 Welder : 1
Warehouse man : 1 Labor : 2
Foreman : 3 Mason : 1

Total Manpower = 26

IV. Activities

EARTH WORKS (March 1, 2018 - April 27, 2018)


1. Soil Backfill and compaction of 6th Basement (Height = 0.3m)
G/L: 1-3/A-H
2. Soil Backfill and Compaction of 6th Basement (Height = 0.3m)
G/L: 1-3/A-H
3. Soil Backfill Along Retaining Wall of 6th Basement
G/L: 3-4/F-H
4. Soil Backfill and Compaction of 6th Basement (Height = 0.3m)
G/L: 1-3/A-H
5. Soil Excavation for Footing
G/L: G-H/3-4
6. Soil backfill along 5th Basmenet Retaining Wall
G/L: 3-4/F-H
7. Soil Excavation for Matt Footing
G/L: 4-5/F-H
8. Lot Clearing
G/L: A-E/3-4

REBAR WORKS (March 1, 2018 - April 27, 2018)

1. Fabrication and Installation of Beam rebars for 5 th Basement

G/L: 1-3/A-H

2. Fabrication and Installation of Column Rebars 5 th Basement

G/L : 1-3/A-H

3. Fabrication and installation of 5th Basement Slab Rebars

G/L: 1-3/A-H

4. Fabrication and installation of 5th Basement Column Rebars

G/L: 1-3/A-H

5. Faibrication and Installation of 5th Basement Retaining Wall Rebars

G/L: 2-3/E-H

6. Fabrication and installation of Foundation and Retaining Wall

Rebars

G/L: 3-4/G-H

7. Fabrication and installation of 4th Basement Beam and Slab Rebars

G/L: 1-3/A-H

Formworks

1. Fabrication and Installation of Beam formworks for 5 th Basement

G/L: 1-3/A-H

2. Fabrication and Installation of Column formworks for 5 th Basement

G/L : 1-3/A-H

3. Fabrication and installation of 5th Basement Slab formworks

G/L: 1-3/A-H

4. Fabrication and installation of 5th Basement Column formworks

G/L: 1-3/A-H

5. Faibrication and Installation of 5th Basement Retaining Wall

formworks
G/L: 2-3/E-H

6. Fabrication and installation of Foundation and Retaining Wall

formworks

G/L: 3-4/G-H

7. Fabrication and installation of 4th Basement Beam and Slab

formworks

G/L: 1-3/A-H

Concreteworks

1. Concrete Pouring of 6th Basment beams

G/L : 1-3/A-H

2. Concrete Pouring of 5th basement slab and Beams

G/L : 1-3/A-H

3. Concrete Pouring of 5th basement columns and foundation

G/L: 1-3/A-H

4. Concrete Pouring of 5th basement column and retaining wall

G/L: 1-3/A-H

Concrete pouring of 4th Basement beams and slab

Prepared by: Noted By:

ENGR. JAS ON T. CHANTIOCO ENGR. VIRTRON K. BUMAL-O


Cadet Engineer Project M anager
FCLaranang Development Corp. FCLaranang Development Corp.

Checked By: Noted By:

ENGR. MICHAEL D. CORPUZ ENGR. FERNANDO C. LARANANG


•WORK SCHEDULE-CASH FLOW
Project Superintendent President / CEO
FCLaranang Development Corp. FCLaranang Development Corp.
•LIST OF FORMS BEING USED
- INCIDENT REPORT
- CHANGE OF REST DAY
- MANUAL TIMESHEET
- MANPOWER TRANSFER
•VISUAL SCHEDULE
•LIST OF CONTRACT & MANPOWER
•PHOTOS:

FIELD OFFICE

FIELD OFFICE
BUNK HOUSE W/ LATRINE

STORAGE ROOM
STOCK PILE FENCE

FABRICATION AREA