Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Job Title: ONE ZA'ABEEL

Client: ONE ZA'ABEEL LLC

Engineer: DED
1 1.0 3 0.75 6 0.525
LOAD 221 1.0DL + 0.75LL + 0.525EL
REPEAT LOAD
1 1.0 3 0.75 7 0.525
LOAD 222 0.6DL + 1.0WL
REPEAT LOAD
1 0.6 4 1.0
LOAD 223 0.6DL + 1.0WL
REPEAT LOAD
1 0.6 5 1.0
LOAD 224 0.6DL + 0.7EL
REPEAT LOAD
1 0.6 6 0.7
LOAD 225 0.6DL + 0.7EL
REPEAT LOAD
1 0.6 7 0.7
LOAD 226 1.0DL + 1.0TL
REPEAT LOAD
1 1.0 8 1.0
LOAD 227 1.0DL + 1.0TL
REPEAT LOAD
1 1.0 9 1.0
LOAD 301 2.0DL + 1.5LL
REPEAT LOAD
1 2.0 2 1.5
LOAD 302 2.0DL + 1.5LL
REPEAT LOAD
1 2.0 3 1.5
LOAD 303 2.0DL + 1.5WL
REPEAT LOAD
1 2.0 4 1.5
LOAD 304 2.0DL + 1.5WL
REPEAT LOAD
1 2.0 5 1.5
PERFORM ANALYSIS
DEFINE ENVELOPE
101 TO 105 ENVELOPE 1 TYPE SERVICEABILITY
201 TO 227 ENVELOPE 2 TYPE STRENGTH
301 TO 304 ENVELOPE 3 TYPE STRENGTH
END DEFINE ENVELOPE
FINISH

Page 6 of 6
61 of 100

You might also like