OFFICE OF STRUCTURES

STRUCTURAL DETAIL MANUAL

Chapter 02 - Substructure

SECTION 06

UTILITIES
(SUB-UTL)
Concrete diaphragm
Top of roadway

A/4 A/4 A/4 A/4

Cheek wall
Vertical
reinforcing
Exterior each face
First
stringer
interior
stringer
'
n.
-0'
mi
1'

*1 - 8'' diameter PVC Longitudinal reinforcing


conduit (capped on
both sides of backwall each face
with PVC caps)

Conduit shall be placed parallel to the


adjacent stringer. Adjust placement of
backwall reinforcing to allow conduit
to pass through reinforcing as shown.
ELEVATION
Scale: •'' = 1'-0''

Notes:
SUBSTRUCTURE - UTI

1. Conduits to be at each corner of


bridge as located in above detail.
On dual bridges the conduits shall APPROVAL
STATE OF MARYLAND
be located at all eight locations. DIRECTOR DEPARTMENT OF TRANSPORTATION
OFFICE OF STRUCTURES
2.Pipe must extend past front face of STATE HIGHWAY ADMINISTRATION
backwall 6''. Pipe to extend from rear DATE:12/04/2008 OFFICE OF STRUCTURES

face 5 feet beyond endpost/wingwall.


VERSION
3.For PVC requirements see Section 905. SLEEVES FOR FUTURE UTILITIES
4.Cost, complete in place, to be AT ABUTMENT BACKWALLS
incidental to other pertinent bid
LI

1.0
TI

items.
1 OF 1
ES

DETAIL NO. SUB-UTL-101 SHEET