AIR CONDITIONING DESIGN

Mapua University North/Northwest Building, 1st – 4th Floor


Design the centralized air conditioning system (Chilled Water System) using the
following data / conditions:

1. Summer month - April


2. Exposure - 12° Degree North Latitude
3. Sun Time - 1 P.M.
4. Daily Range - 16° F
5. Summer Ambient Temperature - 95° FDB and 80° FWB
6. Inside Room Design
Classrooms/AV rooms - 76° FDB and 50% RH
Offices/Faculty - 74° FDB and 50% RH
Shops & Laboratory(Pilot Plant) - 76° FDB and 50% RH
Library (with air distribution ducts)- 74° FDB and 50% RH
Bookstore - 74° FDB and 50% RH
Clinic - 74° FDB and 50% RH
Canteen - 72° FDB and 50% RH
Corridor - 78° FDB and 50% RH
7. Glass Windows - Regular glass medium colored
With or without inside cloth
Outer windows exposed to heat: 173 cm
x 343 cm
Inner windows 183 cm x 220 cm & 27
cm x 57 cm

8. Glass Doors & Glass Doors - 0.7 m x 2.2 m or actual dimension


9. Outside Walls - Hollow Concrete Block
Sand and gravel aggregate
8 inch thick, no interior finish
10. Roof: North -Concrete Slab 6 inch thickness
With 2 inch Fiber-board insulation
- Slab(3rd floor) & Almunimum sheet (4th floor)
11. Ceiling - Acoustic tile
12. Partition - Hollow concrete block, 8 inch thick
13. Floor - Concrete Floor 8 inch thick sand Agg.
14. Floor to Floor Height - 4 meters
15. Floor to Ceiling Height - 3 meters
16. Apply the factor with sash and with diversity factor.
17. Safety factor & Bypass factors - 10%
18. Lighting Load (utilizes electronic ballast) - 2 x 32 Watts T- 8 (elect. ballast)
per fixture or 2 x 28 Watts T-8 Magnetic Ballast
19. Appliances:
a. Television (LED) 200 watts
b. Computers 70 watts per unit or per student
20. Schedule of Occupancy and Power in watts:
A. Ground Floor

Room No. of People Appliances Lights in watts


(watts)
N100 30 70 x 30 + 200 8 – 2 x 32
N101 30 70 x 30 + 200 8 – 2 x 32
N102 30 70 x 30 + 200 8 – 2 x 32
N103 30 70 x 30 + 200 8 – 2 x 32
N103B 20 70 x 20 + 200 4 - 2 x 28
N105 20 70 x 20 8 – 2 x 32
N107 30 70 x 30 + 200 8 – 2 x 32
N108 30 70 x 30 + 200 8 – 2 x 32
N109 30 70 x 30 + 200 8 – 2 x 32
N109A 10 70 x 10 + 200 4 – 2 x 32
N112 30 70 x 30 + 200 8 – 2 x 32
N114 30 70 x 30 + 200 8 – 2 x 32
NW10A 30 70 x 30 + 200 8 – 2 x 32
NW10B 30 70 x 30 + 200 8 – 2 x 32
Instru Lab 20 70 x 20 8 – 2 x 32
GS Studies 20 70 x 20 8 – 2 x 32
CPI Office 20 70 x 20 + 200 2 - 2 x 32
MME Faculty 20 70 x 20 + 200 20 – 2 x 32
ME Lab Office 20 70 x 20 + 200 2-2 x 32
MME Dean’s
20 70 x 20 + 200 20 – 2 x 32
Office
CCESC Office 20 70 x 20 + 200 16 – 2 x 32
Robo Room 10 70 * 10 + 200 12 – 2 x 32
CPI Laboratory 20 70 x 20 + 200 2-2 x 32
UTM 20 70 x 20 + 200 6 - 2 x 32
Fabshop 20 70 x 20 8 – 2 x 32
GS Library 30 70 x 30 +200 8 – 2 x 32
Water Treament 20 70 x 20 8 – 2 x 32
Facility
Nanotech Lab 20 70 x 20 8 – 2 x 32
Pilot Plant (Zone 20 70 x 20 16 – 2 x 32
1)
Corridor 2 15 0 6 - 2 x 32
Corridor 3 10 0 4 -2 x 32
Corridor 4 30 70 x 30 +200 8 – 2 x 32
Corridor 5 40 70 x 40 +200 20 – 2 x 28

Second Floor

Room No. of People Power (Watts) Lights in watts


N200 20 70 x 20 + 200 8 - 2 x 28
N201 30 70 x 30 + 200 8 - 2 x 28
N202 30 70 x 30 + 200 8 - 2 x 28
N203 30 70 x 30 + 200 8 - 2 x 28
N204 30 70 x 30 + 200 8 - 2 x 28
N205A 30 70 x 30 + 200 8 - 2 x 28
N205B 30 70 x 30 + 200 8 - 2 x 28
N206 30 70 x 30 + 200 12 - 2 x 28
N207 30 70 x 30 + 200 8 - 2 x 28
N209 20 70 x 20 + 200 16 - 2 x 28
NW200 30 70 x 30 + 200 8 - 2 x 28
NW201 30 70 x 30 + 200 8 - 2 x 28
NW202 30 70 x 30 + 200 8 - 2 x 28
NW203 30 70 x 30 + 200 8 - 2 x 28
NW204 30 70 x 30 + 200 8 - 2 x 28
NW205 30 70 x 30 + 200 8 - 2 x 28
CEP LAB 20 70 x 20 + 200 4 - 2 x 28
EMSE 70 x 20 + 200
FACULTY 20 8 - 2 x 28

Corridor 6 20 70 * 20 8 – 2 x 32
Corridor 7 20 70 * 20 8 – 2 x 32
Corridor 8 20 70 * 20 8 – 2 x 32
Corridor 9 30 70 * 30 8 – 2 x 28
Corridor 10 30 70 * 30 4 – 2 x 28
Corridor 11 20 70 * 20 4 – 2 x 28
Corridor 12 30 70 x 30 8 – 2 x 28
Corridor 13 30 70 x 30 8 – 2 x 28

Third Floor

Room No. of People Appliances (watts) Lights in watts


N309 30 200 + 70 (30) 4 x 2 x 32
N310 30 200 + 70 (30) 2 x 2 x 32
N301 30 200 + 70 (30) 2 x 2 x 32
N311 30 200 + 70 (30) 4 x 2 x 32

N312 30 200 + 70 (30) 4 x 2 x 32


N302 30 200 + 70 (30) 3 x 2 x 28

N306 30 200 + 70 (30) 4 x 2 x 28

N305 30 200 + 70 (30) 4 x 2 x 28

N303 30 200 + 70 (30) 4 x 2 x 28


N304 30 200 + 70 (30) 4 x 2 x 28
N307 30 200 + 70 (30) 4 x 2 x 28
NW300 30 200 + 70(30) 8 x 2 x 28
NW301 30 200 + 70(15) 8 x 2 x 28
NW302A 30 200 + 70(15) 8 x 2 x 28
NW303 30 200 + 70(15) 8 x 2 x 28
NW304 30 200 + 70(15) 8 x 2 x 28
NW305 30 200 + 70(15) 8 x 2 x 28
N313 Zone 1 20 200 + 70 (20) 4 x 2 x 28
N313 Zone 2 20 200 + 70 (20) 4 x 2 x 28
EECE Faculty
20 200 + 70 (30) 4 x 2 x 28
Zone 1
EECE Faculty
20 200 + 70 (30) 4 x 2 x 28
Zone 2
CHE-CHM
20 20 x 70 10 x 2 x 32
Faculty Zone 1
N308A 15 200 + 70 (30) 2 x 2 x 32
N308B 15 200 + 70 (30) 4 x 2 x 32
NW302B 15 200 + 70 (15) 4 x 2 x 32
N300 Zone 1 15 200 + 70 (30) 2 x 2 x 32
N300 Zone 2 10 200 4 x 2 x 32
N300 Zone 3 10 200 4 x 2 x 32
Dean’s Office 10 70 2 x 32
NW304
(Microprocessor 10 10 x 70 4 x 2 x 32
Lab)
CHE-CHM Mini
10 200 + (70 x10) 4 x 2 x 32
Library
CHE-CHM
10 10 x 70 4 x 2 x 32
Faculty Zone 2
North 3F
10 0 16 x 2 x 32
Corridor Zone 1
North 3F
10 0 16 x 2 x 32
Corridor Zone 2
North 3F
10 0 16 x 2 x 32
Corridor Zone 3
North 3F
10 0 16 x 2 x 32
Corridor Zone 4
Northwest 3F
10 0 16 x 2 x 32
Corridor Zone 1
Northwest 3F
10 0 16 x 2 x 32
Corridor Zone 2
Northwest 3F
10 0 16 x 2 x 32
Corridor Zone 3
Northwest 3F
10 0 16 x 2 x 32
Corridor Zone 4
Northwest 3F
10 0 16 x 2 x 32
Corridor Zone 5

Fourth Floor

Room No. of People Appliances (watts) Lights in watts


N407A 30 200 + (15 x 70) 8 x 2 x 28
N407B 30 200 + (15 x 70) 8 x 2 x 28
CHE-CHM
10 10 x 70 4 x 2 x 32
Lab Office
Prep Room 10 10 x 70 4 x 2 x 32
Mapua – The
New Builder 8 8 x 70 3 x 2 x 32
Office
FAMIT 6 6 x 70 3 x 2 x 32

Mapua – NAMA 6 6 x 70 3 x 2 x 32

NW406 30 200 + (15 x 70) 8 x 2 x 32

NW405 30 200 + (30 x 70) 8 x 2 x 32


NW404 30 200 + (30 x 70) 8 x 2 x 32

NW403 30 200 + (30 x 70) 8 x 2 x 32

NW402 30 200 + (30 x 70) 8 x 2 x 32


NW400 30 200 + (30 x 70) 8 x 2 x 32
NW401 Zone 1 10 70 x 10 4 x 2 x 32
NW401 Zone 2 20 70 x 20 4 x 2 x 32
N - 405
30 200 4 - 2 x 32
N - 401 30 200 4 - 2 x 32
N - 402 30 200 4 - 2 x 32
N - 404 30 200 4 - 2 x 32
N - 406 30 200 4 - 2 x 32
N - 403 30 200 4 - 2 x 32
N – 405B 30 200 4 - 2 x 32
NW 4F Corridor
10 0 4 x 2 x 32
Zone 1
NW 4F Corridor
10 0 8 x 2 x 32
Zone 2
NW 4F Corridor
10 0 4 x 2 x 32
Zone 3
NW 4F Corridor
10 0 4 x 2 x 32
Zone 4
NW 4F Corridor
10 0 4 x 2 x 32
Zone 5
NW 4F Corridor
10 0 6 x 2 x 32
Zone 6
NW 4F Corridor
10 0 4 x 2 x 32
Zone 7
Requirements:

A. Air conditioning Load Estimate

A.1 Student Report


1. Heat Load Form per room
2. Psychrometric Chart per room
3. Room Figure
A.2 Group Report
1. Tabulation of heat load from value, namely: Room, RSH, RLH, ERSH,
ERLH, ERTH, GTH, OA CFM & DCFM with the Total Value.
2. Tabulation of Room, GTH, Ton, Area, Sq. ft / ton
3. Tabulation of Room, ESHF, ADP, EDB, LDB, EWB & LWB w/ Ave.
4. Summary of Heat Load Form (Total and compute the right hand corner of
the heat load form)
5. Summary of Psychrometric Chart
B. Supply Duct design Using Equal Friction Method
1. Schematic diagram of air ducts showing length of Duct and CFM per branch.
2. Selection of Duct velocity and initial computation
3. Tabulation of air duct design sizes
4. Longest Run
5. Total External Static Pressure
6. Diffuser Velocity Selection and initial computation of Diffuser Sizes
7. Tabulation of Qty of Diffuser Sizes, Velocity, CFM Rooms
8. Schematic diagram of air ducts showing sizes of ducts and diffuser with
CFM rating
C. Equipment Selection
1. Packaged Chiller
a. Estimated Capacity of Packaged Water-Cooled Chiller
b. Packaged Chiller Data Selected
c. Estimated Flow for Chilled and Cooling Water in Gallons/Min
d. Schematic Diagram of the chiller showing the different parameters
e. High Lighted Selected Data on the Brochure
f. Specification of the Chiller
2. Air-handling Unit
a. AHU & FCU Selection Data
b. AHU & FCU Selected Data
c. Schematic Diagram of AHU showing the different parameters
d. High Lighted Selected Data on the Brochure
e. Specification of the AHUs
D. Economic (Operating Cost) Analysis and Environmental Consideration
1. Comparison of using air-cooled to water-cooled condensers.
2. Analysis using reciprocating, screw, scroll and centrifugal compressors.
Orientation of the Building

SOUTHWEST WEST BUILDING NORTHWEST


BUILDING BUILDING

SOUTH BUILDING NORTH BUILDING