Solar Power

Plant Planning

Andhra Pradesh

Stage 1 - Challenges Faced


Covered 30,875 acres
using multirotor RPA in
28 days

Mapping of Solar Power Plant area for


planning which is topographical survey.
DRONES
play a vital role while doing
these kinds of jobs in remote
areas where accessibility, last mile
connectivity & continous supplies
are common challenges.
CHALLENGES FACED

Hilly region with no roads and tracks


Difficult to fly and place GCP
Lack of connectivity
Region covered with small dams, water
bodies and shrubs
Most lovable challenge - lots of wildlife
Some companies quit
due to the challenges.

Our team with persistent hard work and


professional skills completed the project
successfully and ahead of time.