OEE=availability*efficiency*quality

Availability = Operating Time / Planned Production Time(net available time)


Planned Production Time = Shift Length – Breaks
Operating Time = Planned Production Time - Down Time
actual Production
Efficiency = Efficiency =
full capacity Production
(Total Pieces/Operating Time)
Efficiency =
Ideal Run Rate
Theoretical Production Time
Actual Production Time
Theoretical Production Time =cycletime× number of production
COST PM
number of accepted parts
Cost = no PM = cost per failure × Expected number of failure per year
of having
Quality
total parts producedavailablehourperyear
Expected number
Number of of failure
accepted parts=per year
total = produced - Reject Parts
parts
MTBF
Total cost of PM = annual pm cost + cost of failure (with pm)
Annual pm cost = No.of annual pm × cost per pm
availablehourperyear
No.of annual pm =
PMfrequency

Cumulative percent failure =


Cumulative NO . OF failure
Cumulative no . of test units
NO . OF failure
=
no . of item−hour tested
R =1-
- t
R(t) = e  

Scheduled Labor - Hours per Week


Crew Size 
(Backlog) x (Hours per Week)

R = (R )(R )(R )
S A B C
RP = 1-[(1-RA)(1-RB)(1-RC)]