PROGRES PEKERJAAN PERBAIKAN BHF 6K1P11

UPDATE 06/12/2020 08:27

SISI SELATAN

1A 2A 3A 4A 5A 6A

PRECOATING 100% PRECOATING 100% PRECOATING 100% PRECOATING 100% PRECOATING 100% PRECOATING 100%
INJEKSI CO2 100% INJEKSI CO2 100% INJEKSI CO2 100% INJEKSI CO2 100% INJEKSI CO2 100% INJEKSI CO2 100%
PEMBERSIHAN DAN PENYIRAMAN PEMBERSIHAN DAN PENYIRAMAN PEMBERSIHAN DAN PENYIRAMAN PEMBERSIHAN DAN PENYIRAMAN PEMBERSIHAN DAN PENYIRAMAN PEMBERSIHAN DAN PENYIRAMAN
100% 100% 100% 100% 100% 100%
CHAMBER CHAMBER CHAMBER CHAMBER CHAMBER CHAMBER
PENYIRAMAN LANTAI ATAS 100% PENYIRAMAN LANTAI ATAS 100% PENYIRAMAN LANTAI ATAS 100% PENYIRAMAN LANTAI ATAS 100% PENYIRAMAN LANTAI ATAS 100% PENYIRAMAN LANTAI ATAS 100%
BUKA MANHOLE PLANUM 0% BUKA MANHOLE PLANUM 20% BUKA MANHOLE PLANUM 20% BUKA MANHOLE PLANUM 0% BUKA MANHOLE PLANUM 0% BUKA MANHOLE PLANUM 0%
BUKA PIPA PURGING 0% BUKA PIPA PURGING 0% BUKA PIPA PURGING 0% BUKA PIPA PURGING 0% BUKA PIPA PURGING 0% BUKA PIPA PURGING 0%
INSPEKSI DAN GANTI PARTIAL FILTER INSPEKSI DAN GANTI PARTIAL FILTER INSPEKSI DAN GANTI PARTIAL FILTER INSPEKSI DAN GANTI PARTIAL FILTER INSPEKSI DAN GANTI PARTIAL FILTER INSPEKSI DAN GANTI PARTIAL FILTER
0% 0% 0% 0% 0% 0%
BAG BAG BAG BAG BAG BAG
PASANG PIPA PURGING 0% PASANG PIPA PURGING 0% PASANG PIPA PURGING 0% PASANG PIPA PURGING 0% PASANG PIPA PURGING 0% PASANG PIPA PURGING 0%
PASANG WATER SPRAY 0% PASANG WATER SPRAY 0% PASANG WATER SPRAY 0% PASANG WATER SPRAY 0% PASANG WATER SPRAY 0% PASANG WATER SPRAY 0%
INSPEKSI DAN KALIBRASI EXPLOSION INSPEKSI DAN KALIBRASI EXPLOSION INSPEKSI DAN KALIBRASI EXPLOSION INSPEKSI DAN KALIBRASI EXPLOSION INSPEKSI DAN KALIBRASI EXPLOSION INSPEKSI DAN KALIBRASI EXPLOSION
0% 0% 0% 0% 0% 0%
DOOR DOOR DOOR DOOR DOOR DOOR

INSPEKSI KEBOCORAN CHASING BHF 0% INSPEKSI KEBOCORAN CHASING BHF 0% INSPEKSI KEBOCORAN CHASING BHF 0% INSPEKSI KEBOCORAN CHASING BHF 0% INSPEKSI KEBOCORAN CHASING BHF 0% INSPEKSI KEBOCORAN CHASING BHF 0%

TEST PURGING 0% TEST PURGING 0% TEST PURGING 0% TEST PURGING 0% TEST PURGING 0% TEST PURGING 0%
TUTUP PLANUM 0% TUTUP PLANUM 0% TUTUP PLANUM 0% TUTUP PLANUM 0% TUTUP PLANUM 0% TUTUP PLANUM 0%
TUTUP MANHOLE CHAMBER 0% TUTUP MANHOLE CHAMBER 0% TUTUP MANHOLE CHAMBER 0% TUTUP MANHOLE CHAMBER 0% TUTUP MANHOLE CHAMBER 0% TUTUP MANHOLE CHAMBER 0%
LEAKADGE TEST 0% LEAKADGE TEST 0% LEAKADGE TEST 0% LEAKADGE TEST 0% LEAKADGE TEST 0% LEAKADGE TEST 0%
INSPEKSI ULANG 0% INSPEKSI ULANG 0% INSPEKSI ULANG 0% INSPEKSI ULANG 0% INSPEKSI ULANG 0% INSPEKSI ULANG 0%
BERSIHKAN AREA KERJA 0% BERSIHKAN AREA KERJA 0% BERSIHKAN AREA KERJA 0% BERSIHKAN AREA KERJA 0% BERSIHKAN AREA KERJA 0% BERSIHKAN AREA KERJA 0%

TOTAL 24% TOTAL 25% TOTAL 25% TOTAL 24% TOTAL 24% TOTAL 24%

IN LET TOTAL PROGRESS 28% OUT LET

PRECOATING 100% PRECOATING 100% PRECOATING 100% PRECOATING 100% PRECOATING 100% PRECOATING 100%
INJEKSI CO2 100% INJEKSI CO2 100% INJEKSI CO2 100% INJEKSI CO2 100% INJEKSI CO2 100% INJEKSI CO2 100%
PEMBERSIHAN DAN PENYIRAMAN PEMBERSIHAN DAN PENYIRAMAN PEMBERSIHAN DAN PENYIRAMAN PEMBERSIHAN DAN PENYIRAMAN PEMBERSIHAN DAN PENYIRAMAN PEMBERSIHAN DAN PENYIRAMAN
100% 100% 100% 100% 100% 100%
CHAMBER CHAMBER CHAMBER CHAMBER CHAMBER CHAMBER
PENYIRAMAN LANTAI ATAS 100% PENYIRAMAN LANTAI ATAS 100% PENYIRAMAN LANTAI ATAS 100% PENYIRAMAN LANTAI ATAS 100% PENYIRAMAN LANTAI ATAS 100% PENYIRAMAN LANTAI ATAS 100%
BUKA MANHOLE PLANUM 0% BUKA MANHOLE PLANUM 0% BUKA MANHOLE PLANUM 0% BUKA MANHOLE PLANUM 100% BUKA MANHOLE PLANUM 100% BUKA MANHOLE PLANUM 0%
BUKA PIPA PURGING 0% BUKA PIPA PURGING 0% BUKA PIPA PURGING 0% BUKA PIPA PURGING 100% BUKA PIPA PURGING 100% BUKA PIPA PURGING 0%
INSPEKSI DAN GANTI PARTIAL FILTER INSPEKSI DAN GANTI PARTIAL FILTER INSPEKSI DAN GANTI PARTIAL FILTER INSPEKSI DAN GANTI PARTIAL FILTER INSPEKSI DAN GANTI PARTIAL FILTER INSPEKSI DAN GANTI PARTIAL FILTER
0% 0% 0% 43% 100% 0%
BAG BAG BAG BAG BAG BAG
PASANG PIPA PURGING 0% PASANG PIPA PURGING 0% PASANG PIPA PURGING 0% PASANG PIPA PURGING 0% PASANG PIPA PURGING 100% PASANG PIPA PURGING 0%
PASANG WATER SPRAY 0% PASANG WATER SPRAY 0% PASANG WATER SPRAY 0% PASANG WATER SPRAY 0% PASANG WATER SPRAY 100% PASANG WATER SPRAY 0%
INSPEKSI DAN KALIBRASI EXPLOSION INSPEKSI DAN KALIBRASI EXPLOSION INSPEKSI DAN KALIBRASI EXPLOSION INSPEKSI DAN KALIBRASI EXPLOSION INSPEKSI DAN KALIBRASI EXPLOSION INSPEKSI DAN KALIBRASI EXPLOSION
0% 0% 0% 0% 0% 0%
DOOR DOOR DOOR DOOR DOOR DOOR
INSPEKSI KEBOCORAN CHASING BHF 0% INSPEKSI KEBOCORAN CHASING BHF 0% INSPEKSI KEBOCORAN CHASING BHF 0% INSPEKSI KEBOCORAN CHASING BHF 0% INSPEKSI KEBOCORAN CHASING BHF 0% INSPEKSI KEBOCORAN CHASING BHF 0%
TEST PURGING 0% TEST PURGING 0% TEST PURGING 0% TEST PURGING 0% TEST PURGING 0% TEST PURGING 0%
TUTUP PLANUM 0% TUTUP PLANUM 0% TUTUP PLANUM 0% TUTUP PLANUM 0% TUTUP PLANUM 100% TUTUP PLANUM 0%
TUTUP MANHOLE CHAMBER 0% TUTUP MANHOLE CHAMBER 0% TUTUP MANHOLE CHAMBER 0% TUTUP MANHOLE CHAMBER 0% TUTUP MANHOLE CHAMBER 0% TUTUP MANHOLE CHAMBER 0%
LEAKADGE TEST 0% LEAKADGE TEST 0% LEAKADGE TEST 0% LEAKADGE TEST 0% LEAKADGE TEST 0% LEAKADGE TEST 0%
INSPEKSI ULANG 0% INSPEKSI ULANG 0% INSPEKSI ULANG 0% INSPEKSI ULANG 0% INSPEKSI ULANG 0% INSPEKSI ULANG 0%
BERSIHKAN AREA KERJA 0% BERSIHKAN AREA KERJA 0% BERSIHKAN AREA KERJA 0% BERSIHKAN AREA KERJA 0% BERSIHKAN AREA KERJA 0% BERSIHKAN AREA KERJA 0%

TOTAL 24% TOTAL 24% TOTAL 24% TOTAL 38% TOTAL 59% TOTAL 24%