All Cummulative WORK DONE
All Cummulative WORK DONE
DR M-25 6.00
DS M-25 3.50
LVUP BOTTEM HUNCH M-30 4.00
DW M-25 4.00
DW M-25 5.00
DS M-25 4.00
DR M-25 6.00
DS M-25 4.00
DR M-25 6.00
DS M-25 4.00
DW & DS M-25 5.00
DW M-25 2.50
Drain Wall M25 3.5 Diamond
Drain Pcc M15 6 BHARAT
Drain Wall M25 3 Ambika
Drain Wall M25 3 Ambika
Crash Barrier M40 14 Geocon
Drain Wall M25 3.5 Triangle
Drain Slab M25 3 BHAVANI
B/C Wall 3rd lift M30 2.5 Gulab singh
Drain Pcc M15 6 Bharat singh
Drain Pcc M15 6 Bharat singh
Drain Wall M35 4 G.S
Drain Slab M25 3.5 Bharat singh
Drain Raft M25 4.5 Jaibaba
Casting Yard M15 2
Drain Raft M25 6 Harsh
Drain Slab M25 3.5 Mukesh
Drain Pcc M15 6 Bharat singh
Drain Wall M25 4 Gulab singh
DW M-25 6.00
DS M-25
DW M-25 3.50
PIPE ENCASING M-20 18.00
DS M-25 5.00
DW M-25 6.00
DW M-25 3.50
DS M-25 6.00
DS M-25 4.00
DP M-15 6.00
DS M-25 2.50
DR M-25 12.00
DW M-25 4.00
DS M-25 4.00
DS M-25 3.00
DW M-25 3.50
DR M-25 6.00
VCC RE PANEL M-35 18.00
Drain Raft M25 4 Bharat singh
Drain raft M25 6 Ambika
Crash Barrier M25 3.5 Diamond
Drain Wall M40 10 Geocon
Drain Raft M25 2.5 Ambika
Drain Slab M25 4.5 Jaibaba
Drain Slab M25 3.5 Ambika
Drain Wall M25 4 G.S
LVUP wall a2 1ST lift M25 6 Gulab singh
Drain Wall M25 3.5 Jaibaba
Drain Raft M25 6 Bharat singh
Drain Wall M25 2.5 Ambika
RE WALL Pcc M15 1 Geocon
Drain Pcc M15 6 Jaibaba
Drain Slab M25 3.5 Jaibaba
Drain Raft M25 6 Mukesh
PIPE ENCASING M-20 10.00
DW M-25 8.00
DS M-25 3.50
DS M-25 6.50
DS M-25
DR M-25 6.00
DS M-25 6
DS M-25
DW M-25 3.5
DW M-25 8
VCC RE PANEL M-35 6
DW M-25 6
DS M-25
DP M-15 6
DW M-25 6
DP M-15 6
ABUTMENT WALL MNB M-30 12
VCC RE PANEL M-35 7
DW M-25 6
DS M-25
DW M-25 4
DS M-25 6
HEAD WALL 3RD LIFT M-20 6
DR M-25 6
Drain Slab M25 3.5 Jaibaba
Drain Pcc M25 6 Jaibaba
Drain Wall M25 2.5 Ambika
Drain Slab M25 3 Ambika
Drain Slab M25 3 Ambika
Drain Wall M25 3.5 Bharat singh
Drain Slab M25 3.5 Bharat singh
Drain Raft M25 6 Bharat singh
Drain Wall M25 3 Mukesh
Drain Raft M25 3 Mukesh
Drain Raft M25 4.5 Harsh
Drain Raft M25 6 Diamond
Drain Wall M25 3.5 Diamond
Drain PCC M15 6 Diamond
VCC RE PANEL M-35 36
DW M-25 3.5
DW M-25 5
DS M-25 4
DP M-15 6
DW M-25 6
DR M-25 6
DW M-25 6.5
DW M-25 6
DS M-25
DP M-15 6
LVUP PCC M-15 24
MMR RE PANEL M-35 14
DW M-25 3
DS M-25 3.5
DS M-25 4
DS M-25 2
DW M-25 3
DS M-25 3
DW M-25 5
DS M-25 5
DP M-15 12
Drain Slab M25 4 Ambika
B/C Bottay Hunch M30 4 RAVI
RE Wall Hunch M20 2 Geocon
Drain Wall M25 3.5 Bharat singh
Drain Pcc M15 6 RASHMI
Drain Raft M25 6.5 Bharat singh
Drain Slab M25 3.5 Gulab singh
Drain Wall M25 3 Mukesh
Drain Slab M25 3 Mukesh
Drain Slab M25 3 Jaibaba
Drain Raft M25 3 Jaibaba
RE Panel M35 11 Geocon
Drain pcc M25 6 NARAYAN
Drain Wall M25 6 Ambika
Drain Wall M25 4.5 G.S
Drain Raft M25 6 Jaibaba
Drain Wall M25 3.5 Harsh
RE LAYAING POD M20 2.5 Jaibaba
Crash Barrier M40 18 Geocon
Drain Wall M25 3.5 Diamond
DP M-15 6
DW M-25 6
DW M-25 3.5
DW M-25 3
DR M-25 6
RE PANE VCC M-35 18
DW M-25 6
DS M-25
DW M-25 4
DW M-25 5
DR M-25
DS M-25 6
DW M-25
DS M-25 3.5
DS M-25 5
LVUP M-15 5.5
DS M-25 6
DW M-25
HEAD WALL 1ST LIFT M-20 3
DP M-15 6
VCC RE PANEL M-35 19
PIPE BED PCC M-15 2.5
DW M-25 5
RE Wall lavlining Pad M20 2.5 Geocon
Drain Raft M25 6 Bharat singh
Drain Pcc M15 4 Ambika
Drain Raft M25 6 U.B
LVUP 1ST Wall A2 M30 15 Gulab singh
Drain Slab M25 3 Diamond
Drain Wall M25 3 Diamond
Drain Raft M25 6 Jaibaba
Drain Wall M25 3.5 Bharat singh
RE Panel M35 18 Geocon
Drain Wall M25 3.5 Jaibaba
Drain Wall M25 4.5 G.S
Drain Slab M25 3.5 Bharat singh
Drain slab+wall M25 6 Mukesh
Drain Raft M25 4.5 Ambika
b/c Slab M30 32.5 RIDHI
Crash Barrier M40 15 Geocon
b/c Slab M30 24.5 RIDHI
VCC RE PANEL M-35 21
DS M-25 6
DW M-25 3.5
DP M-15 6
DW&DS M-25 6.5
DW M-25 3.5
DS M-25 3
DR M-25 6
Drain Wall M25 3 Ambika
Drain Slab M25 3 Ambika
Drain Slab M25 6 Jaibaba
Drain Wall M25 3 Bharat singh
Drain Slab M25 3 Bharat singh
Drain Wall M25 3 Diamond
Drain Slab M25 3 Diamond
Drain Wall M25 3.5 Gulab singh
Drain Wall M25 3.5 Bharat singh
Drain Wall M25 4 Ambika
PUP PCC M15 12.5 RUHI
Crash Barrier M40 15.5 Geocon
RE Panel M35 6 Geocon
MMR RE PANEL M-35 21
DW M-25 3.5
DW M-25 7
DR M-25 3.5
DP M-25 6
DW M-25 3.5
DW M-25 6
DS M-25 6
DW M-25 6.5
DR M-25 3.5
DR M-25 3
DP M-25 6
DR M-25 6
HPC PIPE CULVERT M-15 5.5
DW M-25 6
DR M-25
DR M-25 6
DR M-25 6
DR M-25 6
VCC RE PANEL M-35 26
DP M-25 5
DW M-25 6
DW M-25 6
M-25
Drain wall M25 1.75 G.S
Drain raft M25 1.75 G.S
Drain wall M25 3 Diamond
DRAIN Slab M25 3 Diamond
Drain Wall M15 3.5 Jaibaba
Drain Wall M25 3.5 Bharat singh
Drain pcc M15 6 Ambika
Drain Slab M25 6 Mukesh
Drain Raft M25 6 Bharat singh
mnb pcc M15 30 RUHI
Drain Slab M25 3.5 Gulab singh
Drain Raft M25 6 NARAYAN
Drain Slab M25 4 Ambika
Drain Slab M25 3.5 Bharat singh
RE Panel M35 24 Geocon
Drain Slab M25 4 Ambika
Drain Slab M25 3.5 Jaibaba
Drain Pcc M15 6 Bharat singh
Crash Barrier M40 14 Geocon
XER IS JAM
6 CUM DIVERTED M40
Dimond
Geocon
Ketan patal
Jai Baba
Gulab Sing
GS Bildcon
Creatihe infra
SRI NIVAS
Karan sing
Dimond
U.B Infra
R.S Infra
CHETAK
Gulab Sing
R.S Infra
Nukul
Nukul
B.R.Neetu
B.R.Neetu
Sansar Suk.
Sansar Suk.
Aryan
Aryan
Raj Const.
Raj Const.
B.R.Neetu
B.R.Neetu
Jay Shree Shyam
Om Const.
Om Const.
VBG
Manarayni
R.G.Infra
Jay Shree Shyam
Jay Shree Shyam
Jay Shree Shyam
B.R.Neetu
Jay Shree Shyam
Nukul
B.R.Neetu
B.R.Neetu
Sansar Suk.
Sansar Suk.
Aryan
Aryan
Raj Const.
Raj Const.
B.R.Neetu
B.R.Neetu
Jay Shree Shyam
Om Const.
Om Const.
VBG
Manarayni
R.G.Infra
Jay Shree Shyam
Jay Shree Shyam
Jay Shree Shyam
B.R.Neetu
Jay Shree Shyam
Stancy Infra
Geocon
Geocon
Bhavya Jyoti
Nakut
Radhe
Ashapurcon
Yogi
Shrce Nivos
BHAVANI
U.B Infra
Yogi
Geocon
Om Const.
Om Const.
Rajesh Singh
Rajesh Singh
Sansar Suk.
Sansar Suk.
Aryan
Aryan
Manarayni
Manarayni
Nukul
B.R.Neetu
B.R.Neetu
B.R.Neetu
B.R.Neetu
Raj Const.
Raj Const.
R.G.Infra
Om Const.
Om Const.
Om Const.
Om Const.
Rajesh Singh
Rajesh Singh
Sansar Suk.
Sansar Suk.
Aryan
Aryan
Manarayni
Manarayni
Nukul
B.R.Neetu
B.R.Neetu
B.R.Neetu
B.R.Neetu
Raj Const.
Raj Const.
R.G.Infra
Om Const.
Om Const.
Geocon
YOGI
Ashapurcon
Bhavya Jyoti
Geocon
Ruhi
Geocon
Departmentel
VBG
B.R.Neetu
B.R.Neetu
Om Const.
Om Const.
VBG
B.R.Neetu
B.R.Neetu
Om Const.
Om Const.
Geocon
Ruhi
Manarayni
Manarayni
Nukul
Nukul
Aryan
Aryan
B.R.Neetu
B.R.Neetu
Raj Const.
Raj Const.
Raj Const.
Om Const.
Om Const.
R.G.Infra
R.G.Infra
Manarayni
Manarayni
Nukul
Nukul
Aryan
Aryan
B.R.Neetu
B.R.Neetu
Raj Const.
Raj Const.
Raj Const.
Om Const.
Om Const.
R.G.Infra
R.G.Infra
R.S Infra
R.S Infra
Geocon
Ketan patal
Geocon
U.B Infra
Yogi
Yogi
Karan sing
Gulab Sing
Yogi
G.S Buildcon
BHAVANI
Om Const.
Om Const.
B.R.Neetu
B.R.Neetu
B.R.Neetu
B.R.Neetu
Manarayni
Manarayni
Rajesh Singh
Rajesh Singh
Aryan
Aryan
B.R.Neetu
Pramod
Pramod
R.G.Infra
Nukul
Nukul
Chetak Enterprises
B.R.Neetu
B.R.Neetu
Om Const.
Om Const.
Om Const.
B.R.Neetu
B.R.Neetu
B.R.Neetu
B.R.Neetu
Manarayni
Manarayni
Rajesh Singh
Rajesh Singh
Aryan
Aryan
B.R.Neetu
Pramod
Pramod
R.G.Infra
Nukul
Nukul
Chetak Enterprises
B.R.Neetu
B.R.Neetu
Om Const.
Nukul
Geocon
Geocon
GS Bildcon
Departmentel
Geocon
Dimond
U.B Infra
Geocon
Creatihe infra
Creatihe infra
Shrce Nivos
Shrce Nivos
HARISH
R.S Infra
VBG
Shivam Const.
Shivam Const.
Om Const.
Om Const.
B.R.Neetu
B.R.Neetu
B.R.Neetu
B.R.Neetu
Nukul
Rajesh Singh
Rajesh Singh
Aryan
R.G.Infra
Raj Const.
Manarayni
Manarayni
Sansar Suk.
Sansar Suk.
VBG
Shivam Const.
Shivam Const.
Om Const.
Om Const.
B.R.Neetu
B.R.Neetu
B.R.Neetu
B.R.Neetu
Nukul
Rajesh Singh
Rajesh Singh
Aryan
R.G.Infra
Raj Const.
Manarayni
Manarayni
Sansar Suk.
Sansar Suk.
Geocon
Ashapurcon
Geocon
Sr.No. Date Chainage Side
3605 01.01.2020 Majra Camp L/s
8254 01.01.2020 Majra Camp L/s
2855 02.01.2020 463+905 LHS
2856 02.01.2020 463+905 LHS
2857 02.01.2020 448+267 LHS
2858 02.01.2020 463+905 LHS
2859 02.01.2020 469+000 LHS
2860 02.01.2020 469+000 LHS
3606 02.01.2020 538+360 538+360 L/s
3607 02.01.2020 538+337 538+337 L/s
3608 02.01.2020 520+315 520+315 R/s
3609 02.01.2020 521+070 521+070 L/s
3610 02.01.2020 533+470 533+470 R/s
3611 02.01.2020 533+500 533+500 L/s
3612 02.01.2020 533+655 533+655 R/s
3613 02.01.2020 538+890 538+890 L/s
3614 02.01.2020 538+930 538+930 L/s
3615 02.01.2020 527+260 527+260 L/s
3616 02.01.2020 527+235 527+235 L/s
3617 02.01.2020 537+580 537+580 L/s
3618 02.01.2020 537+510 537+510 L/s
3619 02.01.2020 536+580 536+580 L/s
3620 02.01.2020 Majra Camp Majra Camp L/s
8255 02.01.2020 538+360 538+360 L/s
8256 02.01.2020 538+337 538+337 L/s
8257 02.01.2020 520+315 520+315 R/s
8258 02.01.2020 521+070 521+070 L/s
8259 02.01.2020 533+470 533+470 R/s
8260 02.01.2020 533+500 533+500 L/s
8261 02.01.2020 533+655 533+655 R/s
8262 02.01.2020 538+890 538+890 L/s
8263 02.01.2020 538+930 538+930 L/s
8264 02.01.2020 527+260 527+260 L/s
8265 02.01.2020 527+235 527+235 L/s
8266 02.01.2020 537+580 537+580 L/s
8267 02.01.2020 537+510 537+510 L/s
8268 02.01.2020 536+580 536+580 L/s
8269 02.01.2020 Majra Camp Majra Camp L/s
02.01.2020 463+905 LHS
02.01.2020 463+905 LHS
02.01.2020 488+281 LHS
02.01.2020 469+100
2861 03.01.2020 466+460 LHS
2862 03.01.2020 473+639 LHS
2863 03.01.2020 469+000 LHS
2864 03.01.2020 467+200 to 225 RHS
2865 03.01.2020 466+459 LHS
2866 03.01.2020 469+500 to 530 LHS
2867 03.01.2020 466+260 to 585 LHS
2868 03.01.2020 448+571 LHS
2869 03.01.2020 448+571 LHS
2870 03.01.2020 448+267 LHS
2871 03.01.2020 464+270 to 285 LHS
2872 03.01.2020 447+560 to 600 LHS
2873 03.01.2020 448+240 TO 265 LHS
2874 03.01.2020 448+220 to 235 LHS
2875 03.01.2020 461+701 LHS
2876 03.01.2020 449+039 RHS
2877 03.01.2020 469+000 LHS
2878 03.01.2020 GAMBHOI
2879 03.01.2020 GAMBHOI
2880 03.01.2020 469+123 LHS
2881 03.01.2020 469+123 LHS
2882 03.01.2020 465+706 RHS
2883 03.01.2020 470+760 to 780 LHS
3621 03.01.2020 538+840 538+865 L/s
3622 03.01.2020 526+400 526+415 R/s
3623 03.01.2020 526+440 526+450 R/s
3624 03.01.2020 527+235 527+250 L/s
3625 03.01.2020 536+610 536+640 L/s
3626 03.01.2020 537+025 537+035 L/s
3627 03.01.2020 537+840 537+930 L/s
3628 03.01.2020 537+600 537+620 L/s
3629 03.01.2020 537+530 537+550 L/s
3630 03.01.2020 520+330 520+340 R/s
3631 03.01.2020 521+080 521+090 L/s
3632 03.01.2020 537+080 537+125 L/s
3633 03.01.2020 538+920 538+950 L/s
3634 03.01.2020 538+355 538+375 L/s
3635 03.01.2020 Majra Camp L/s
3636 03.01.2020 526+500 R/s
8270 03.01.2020 538+840 538+865 L/s
8271 03.01.2020 526+400 526+415 R/s
8272 03.01.2020 526+440 526+450 R/s
8273 03.01.2020 527+235 527+250 L/s
8274 03.01.2020 536+610 536+640 L/s
8275 03.01.2020 537+025 537+035 L/s
8276 03.01.2020 537+840 537+930 L/s
8277 03.01.2020 537+600 537+620 L/s
8278 03.01.2020 537+530 537+550 L/s
8279 03.01.2020 520+330 520+340 R/s
8280 03.01.2020 521+080 521+090 L/s
8281 03.01.2020 537+080 537+125 L/s
8282 03.01.2020 538+920 538+950 L/s
8283 03.01.2020 538+355 538+375 L/s
8284 03.01.2020 Majra Camp L/s
8285 03.01.2020 526+500 R/s
03.01.2020 484+400 LHS
03.01.2020 490+360 to 380 LHS
03.01.2020 488+300 LHS
03.01.2020 473+639 LHS
03.01.2020 483+820 RHS
2884 04.01.2020 476+796 LHS
2885 04.01.2020 476+496 LHS
2886 04.01.2020 ASAL CAMP
2887 04.01.2020 469+123 LHS
2888 04.01.2020 466+890 to 915 RHS
2889 04.01.2020 464+285 to 300 LHS
2890 04.01.2020 462+775 to 790 LHS
2891 04.01.2020 449+039 RHS
2892 04.01.2020 450+069 LHS
2893 04.01.2020 467+250 to 290 RHS
2894 04.01.2020 467+354 LHS
2895 04.01.2020 466+469 LHS
2896 04.01.2020 466+820 TO 860 LHS
2897 04.01.2020 469+000 LHS
2898 04.01.2020 469+000 LHS
2899 04.01.2020 457+629 LHS
3637 04.01.2020 538+865 538+915 L/s
3638 04.01.2020 526+435 526+450 R/s
3639 04.01.2020 526+450 526+470 R/s
3640 04.01.2020 533+490 533+510 R/s
3641 04.01.2020 533+500 533+510 L/s
3642 04.01.2020 533+675 533+690 L/s
3643 04.01.2020 Majra Camp L/s
3644 04.01.2020 536+580 536+640 L/s
3645 04.01.2020 526+500 R/s
3646 04.01.2020 530+409 R/s
8286 04.01.2020 538+865 538+915 L/s
8287 04.01.2020 526+435 526+450 R/s
8288 04.01.2020 526+450 526+470 R/s
8289 04.01.2020 533+490 533+510 R/s
8290 04.01.2020 533+500 533+510 L/s
8291 04.01.2020 533+675 533+690 L/s
8292 04.01.2020 Majra Camp L/s
8293 04.01.2020 536+580 536+640 L/s
8294 04.01.2020 526+500 R/s
8295 04.01.2020 530+409 R/s
04.01.2020 476+496
04.01.2020 Gambhoi Camp
04.01.2020 481+846 RHS
04.01.2020 481+846 RHS
04.01.2020 481+070 RHS
04.01.2020 466+890 to 920 RHS
04.01.2020 467+354 LHS
2900 05.01.2020 469+100 LHS
2901 05.01.2020 448+250 to 270 RHS
2902 05.01.2020 469+100 LHS
2903 06.01.2020 463+940 LHS
2904 06.01.2020 466+915 to 935 RHS
2905 06.01.2020 470 +900 to 920 LHS
2906 06.01.2020 477+560 to 580 LHS
2907 06.01.2020 469+500 to530 LHS
2908 06.01.2020 467+240 to 260 RHS
2909 06.01.2020 466+420 to 440 LHS
2910 06.01.2020 449+040 RHS
2911 06.01.2020 469+100 LHS
2912 06.01.2020 448+267 RHS
2913 06.01.2020 ASAL PLANT
2914 06.01.2020 466+500 TO 540 LHS
2915 06.01.2020 464+240 TO 260 LHS
2916 06.01.2020 466+860 TO 890 LHS
2917 06.01.2020 469+100 LHS
2918 06.01.2020 473+639 LHS
06.01.2020 473+972 LHS
06.01.2020 473+639 LHS
06.01.2020 Gambhoi Camp
06.01.2020 Gambhoi Camp
06.01.2020 496+424 RHS
06.01.2020 496+424
2919 07.01.2020 448+279 RHS
2920 07.01.2020 448+250 TO270 RHS
2921 07.01.2020 463+904 LHS
2922 09.01.2020 463+730 to 800 RHS
2923 09.01.2020 448+260 to 263
2924 09.01.2020 473+639 LHS
2925 09.01.2020 447+720 to760 RHS
2926 09.01.2020 469+123 LHS
2927 09.01.2020 467+260 to 280 RHS
2928 09.01.2020 465+706 RHS
2929 09.01.2020 466+720 to 760 LHS
2930 09.01.2020 473+972 B/S
2931 09.01.2020 473+972 LHS
2932 09.01.2020 463+280 to300 LHS
2933 09.01.2020 466+192 RHS
2934 09.01.2020 469+000 LHS
2935 10.01.2020 462+585 RHS
2936 10.01.2020 464+230 LHS
2937 10.01.2020 465+706 LHS
2938 11.01.2020 447+580 to 600 RHS
2939 11.01.2020 466+520 to 560 LHS
2940 11.01.2020 467+360 to 380 RHS
2941 11.01.2020 463+890 to840 RHS
3647 11.01.2020 533+685 533+700 L/s
3648 11.01.2020 533+500 533+510 L/s
3649 11.01.2020 533+510 533+530 R/s
3650 11.01.2020 537+620 537+640 L/s
3651 11.01.2020 537+530 537+550 L/s
3652 11.01.2020 Majra Camp L/s
3653 11.01.2020 512+562 R/s
3654 11.01.2020 537+210 537+240 L/s
3655 11.01.2020 531+040 531+110 L/s
3656 11.01.2020 526+500 R/s
3657 11.01.2020 526+500 R/s
8296 11.01.2020 533+685 533+700 L/s
8297 11.01.2020 533+500 533+510 L/s
8298 11.01.2020 533+510 533+530 R/s
8299 11.01.2020 537+620 537+640 L/s
8300 11.01.2020 537+530 537+550 L/s
8301 11.01.2020 Majra Camp L/s
8302 11.01.2020 512+562 R/s
8303 11.01.2020 537+210 537+240 L/s
8304 11.01.2020 531+040 531+110 L/s
8305 11.01.2020 526+500 R/s
8306 11.01.2020 526+500 R/s
11.01.2020 Casting Yard (Gambhoi)
11.01.2020 489+061
11.01.2020 478+530 LHS
11.01.2020 469+100
11.01.2020 469+100
11.01.2020 491+080 LHS
11.01.2020 481+848 LHS
11.01.2020 496+424
11.01.2020 491+500 LHS
11.01.2020 476+496
11.01.2020 479+475 RHS
11.01.2020 476+496 RHS
2942 12.01.2020 469+123 LHS
2943 12.01.2020 461+380 RHS
12.01.2020 Gambhoi Camp
12.01.2020 486+200 to240 RHS
12.01.2020 484+500 to 580
2944 13.01.2020 467+354 LHS
2945 13.01.2020 465+706 RHS
2946 13.01.2020 473+639 LHS
2947 13.01.2020 463+904 LHS
13.01.2020 Casting Yard(Gambhoi)
13.01.2020 469+100
13.01.2020 469+100
13.01.2020 466+490 to 530 LHS
13.01.2020 447+720 to 760 RHS
13.01.2020 463+800 to 840 RHS
13.01.2020 466+720 to 740 LHS
13.01.2020 467+260 to 280 RHS
3658 15.01.2020 525+940 525+970 R/s
3659 15.01.2020 526+450 526+470 R/s
3660 15.01.2020 533+560 533+590 R/s
3661 15.01.2020 527+060 527+090 L/s
3662 15.01.2020 537+640 537+660 L/s
3663 15.01.2020 537+550 537+570 L/s
3664 15.01.2020 533+670 533+695 L/s
3665 15.01.2020 533+530 533+550 R/s
3666 15.01.2020 537+010 537+030 L/s
3667 15.01.2020 537+190 537+210 L/s
3668 15.01.2020 526+500 R/s
3669 15.01.2020 531+100 531+160 L/s
3670 15.01.2020 531+160 531+188 L/s
8307 15.01.2020 525+940 525+970 R/s
8308 15.01.2020 526+450 526+470 R/s
8309 15.01.2020 533+560 533+590 R/s
8310 15.01.2020 527+060 527+090 L/s
8311 15.01.2020 537+640 537+660 L/s
8312 15.01.2020 537+550 537+570 L/s
8313 15.01.2020 533+670 533+695 L/s
8314 15.01.2020 533+530 533+550 R/s
8315 15.01.2020 537+010 537+030 L/s
8316 15.01.2020 537+190 537+210 L/s
8317 15.01.2020 526+500 R/s
8318 15.01.2020 531+100 531+160 L/s
8319 15.01.2020 531+160 531+188 L/s
15.01.2020 463+790 to 810 RHS
15.01.2020 466+720 to 740 LHS
15.01.2020 469+100
15.01.2020 469+100
15.01.2020 469+123 LHS
15.01.2020 461+382 LHS
15.01.2020 461+382 LHS
15.01.2020 Casting Yard (Gambhoi)
16.01.2020 466+740 to 760 LHS
16.01.2020 466+530 to 570 LHS
16.01.2020 465+706 LHS
16.01.2020 461+382 LHS
16.01.2020 469+100 LHS
16.01.2020 469+100 LHS
16.01.2020 447+560 to 585 LHS
16.01.2020 463+800 to 820 RHS
16.01.2020 Gambhoi Camp
17.01.2020 473+972 RHS
17.01.2020 466+760 to780 LHS
17.01.2020 447+585 to 610 LHS
17.01.2020 466+490 to 510 LHS
17.01.2020 463+760 to 785 RHS
17.01.2020 469+100 LHS
17.01.2020 469+100 LHS
3671 18.01.2020 537+060 537+090 L/s
3672 18.01.2020 533+200 533+220 R/s
3673 18.01.2020 537+660 537+680 L/s
3674 18.01.2020 537+570 537+590 L/s
3675 18.01.2020 537+090 537+140 L/s
3676 18.01.2020 527+090 527+130 L/s
3677 18.01.2020 533+535 533+570 R/s
3678 18.01.2020 533+665 533+675 L/s
3679 18.01.2020 533+710 533+720 L/s
3680 18.01.2020 526+500 R/s
3681 18.01.2020 Majra Camp L/s
8320 18.01.2020 537+060 537+090 L/s
8321 18.01.2020 533+200 533+220 R/s
8322 18.01.2020 537+660 537+680 L/s
8323 18.01.2020 537+570 537+590 L/s
8324 18.01.2020 537+090 537+140 L/s
8325 18.01.2020 527+090 527+130 L/s
8326 18.01.2020 533+535 533+570 R/s
8327 18.01.2020 533+665 533+675 L/s
8328 18.01.2020 533+710 533+720 L/s
8329 18.01.2020 526+500 R/s
8330 18.01.2020 Majra Camp L/s
18.01.2020 466+780 to 800 LHS
18.01.2020 447+760 to 780 RHS
18.01.2020 463+755 to 780 RHS
18.01.2020 461+382 LHS
18.01.2020 469+100 LHS
3682 19.01.2020 537+680 537+700 L/s
3683 19.01.2020 537+580 537+600 L/s
3684 19.01.2020 526+450 526+470 R/s
3685 19.01.2020 533+665 533+675 L/s
3686 19.01.2020 533+705 533+720 L/s
8331 19.01.2020 537+680 537+700 L/s
8332 19.01.2020 537+580 537+600 L/s
8333 19.01.2020 526+450 526+470 R/s
8334 19.01.2020 533+665 533+675 L/s
8335 19.01.2020 533+705 533+720 L/s
19.01.2020 466+820 to 840 LHS
19.01.2020 447+780 to 800 RHS
19.01.2020 466+510 to 530 LHS
19.01.2020 463+735 to 750 RHS
2948 20.01.2020 457+629 LHS
3687 20.01.2020 537+030 537+050 L/s
3688 20.01.2020 537+010 537+030 L/s
3689 20.01.2020 537+670 537+690 L/s
3690 20.01.2020 537+640 537+660 L/s
3691 20.01.2020 537+660 537+680 L/s
3692 20.01.2020 533+530 533+550 R/s
3693 20.01.2020 533+570 533+590 R/s
3694 20.01.2020 537+660 537+675 L/s
3695 20.01.2020 537+700 537+705 L/s
3696 20.01.2020 Majra Camp L/s
8336 20.01.2020 537+030 537+050 L/s
8337 20.01.2020 537+010 537+030 L/s
8338 20.01.2020 537+670 537+690 L/s
8339 20.01.2020 537+640 537+660 L/s
8340 20.01.2020 537+660 537+680 L/s
8341 20.01.2020 533+530 533+550 R/s
8342 20.01.2020 533+570 533+590 R/s
8343 20.01.2020 537+660 537+675 L/s
8344 20.01.2020 537+700 537+705 L/s
8345 20.01.2020 Majra Camp L/s
20.01.2020 Casting Yard (Gambhoi)
20.01.2020 473+629 LHS
20.01.2020 473+972
20.01.2020 469+000
20.01.2020 466+840 to 860 LHS
20.01.2020 447+720 to 745 RHS
20.01.2020 463+720 to 740 RHS
2949 21.01.2020 461+380 LHS
2950 21.01.2020 467+354 LHS
2951 21.01.2020 ASAL PLANT
2952 21.01.2020 461+300
2953 21.01.2020 469+100 LHS
3697 21.01.2020 540+015 L/s
3698 21.01.2020 533+660 533+675 L/s
3699 21.01.2020 533+700 533+705 L/s
3700 21.01.2020 537+080 537+100 L/s
3701 21.01.2020 537+690 537+710 L/s
3702 21.01.2020 537+660 537+680 L/s
3703 21.01.2020 527+230 527+235 L/s
3704 21.01.2020 Majra Camp L/s
8346 21.01.2020 540+015 L/s
8347 21.01.2020 533+660 533+675 L/s
8348 21.01.2020 533+700 533+705 L/s
8349 21.01.2020 537+080 537+100 L/s
8350 21.01.2020 537+690 537+710 L/s
8351 21.01.2020 537+660 537+680 L/s
8352 21.01.2020 527+230 527+235 L/s
8353 21.01.2020 Majra Camp L/s
2954 22.01.2020 447+770 to 785 RHS
2955 22.01.2020 467+354 LHS
2956 22.01.2020 466+530 to 590 LHS
2957 22.01.2020 469+000 LHS
2958 22.01.2020 467+320 to 340 RHS
3705 22.01.2020 540+015 L/s
3706 22.01.2020 533+590 533+598 R/s
3707 22.01.2020 533+550 533+570 R/s
3708 22.01.2020 533+530 533+540 R/s
3709 22.01.2020 537+710 537+730 L/s
3710 22.01.2020 537+680 537+700 L/s
3711 22.01.2020 537+100 537+120 L/s
3712 22.01.2020 Majra Camp L/s
8354 22.01.2020 540+015 L/s
8355 22.01.2020 533+590 533+598 R/s
8356 22.01.2020 533+550 533+570 R/s
8357 22.01.2020 533+530 533+540 R/s
8358 22.01.2020 537+710 537+730 L/s
8359 22.01.2020 537+680 537+700 L/s
8360 22.01.2020 537+100 537+120 L/s
8361 22.01.2020 Majra Camp L/s
2959 23.01.2020 469+000 LHS
2960 23.01.2020 450+325 LHS
3713 23.01.2020 533+655 533+675 L/s
3714 23.01.2020 533+705 533+720 L/s
3715 23.01.2020 Majra Camp L/s
8362 23.01.2020 533+655 533+675 L/s
8363 23.01.2020 533+705 533+720 L/s
8364 23.01.2020 Majra Camp L/s
2961 24.01.2020 467+340 to 369 RHS
2962 24.01.2020 450+320 LHS
2963 24.01.2020 469+000 LHS
2964 24.01.2020 466+325 to 340 RHS
3716 24.01.2020 512+562 R/s
3717 24.01.2020 496+424 R/s
3718 24.01.2020 533+540 533+560 R/s
3719 24.01.2020 533+560 533+580 R/s
3720 24.01.2020 533+700 533+720 L/s
3721 24.01.2020 Majra Camp L/s
8365 24.01.2020 512+562 R/s
8366 24.01.2020 496+424 R/s
8367 24.01.2020 533+540 533+560 R/s
8368 24.01.2020 533+560 533+580 R/s
8369 24.01.2020 533+700 533+720 L/s
8370 24.01.2020 Majra Camp L/s
3722 25.01.2020 Majra Camp L/s
8371 25.01.2020 Majra Camp L/s
2965 27.01.2020 467+320 to 340 RHS
2966 27.01.2020 457+629 LHS
2967 27.01.2020 457+629 LHS
2968 28.01.2020 465+706 RHS
2969 28.01.2020 466+515 to 540 LHS
2970 28.01.2020 450+565 LHS
2971 28.01.2020 457+340 to 360 RHS
2972 29.01.2020 450+565 LHS
2973 29.01.2020 466+550 to 565 LHS
2974 30.01.2020 Gadhada Girder Yard
2975 30.01.2020 450+565 LHS
2976 30.01.2020 464+080 LHS
2977 30.01.2020 465+706 RHS
2978 30.01.2020 467+240 to 265 RHS
2979 31.01.2020 450+565 LHS
2980 01.02.2020 450+565 RHS
2981 02.02.2020 464+080 LHS
2982 03.02.2020 464+080 LHS
2983 03.02.2020 465+706 LHS
2984 05.02.2020 464+080 LHS
2985 05.02.2020 466+850 to 565 LHS
13.02 2020 465+706 LHS
13.02 2020 465+706 LHS
13.02 2020 466+800 to 840 LHS
13.02 2020 466+960 to 995 RHS
13.02 2020 478+100 LHS
8372 13.02.2020 510+622 B/s
8373 13.02.2020 Majra Camp L/s
3723 13.02.2020 510+622 B/s
3724 13.02.2020 Majra Camp L/s
14.02.2020 491+495 LHS
14.02.2020 457+629 LHS
14.02.2020 466+775 to 800 LHS
8374 14.02.2020 N.G Camp L/s
8375 14.02.2020 Majra Camp L/s
3725 14.02.2020 N.G Camp L/s
3726 14.02.2020 Majra Camp L/s
15.02.2020 466+995 to 467+010 RHS
15.02.2020 466+800 to 835 LHS
15.02.2020 476+496 RHS
8376 15.02.2020 Majra Camp L/s
3727 15.02.2020 Majra Camp L/s
1 16.02.2019 481+273 BHS
16.02.2020 476+496
2986 16.02.2020 473+954 RHS
2987 16.02.2020 476+496 RHS
2988 16.02.2020 452+687 LHS
2989 16.02.2020 452+687 LHS
17.02.2020 447+803 LHS
17.02.2020 GAMBHOI
8377 17.02.2020 Majra Camp L/s
3728 17.02.2020 Majra Camp L/s
2990 17.02.2020 467+010 to 030 RHS
2991 17.02.2020 466+750 to 775 LHS
2992 17.02.2020 447+803 LHS
2993 17.02.2020 452+684 BHS
18.02.2020 473+639 RHS
18.02.2020 473+639 RHS
18.02.2020 465+706 LHS
2994 18.02.2020 465+706 LHS
19.02.2020 Casting yard(Gambhoi)
19.02.2020 486+000 RHS
2995 19.02.2020 467+030 to 060 RHS
2996 19.02.2020 466+725 to 750 LHS
2997 19.02.2020 467+010 to 030 RHS
2998 19.02.2020 457+687 RHS
20.02.2020 473+954 RHS
2999 20.02.2020 447+681 LHS
3000 20.02.2020 457+629 LHS
3001 20.02.2020 466+715 to 725 LHS
3002 20.02.2020 452+687 RHS
21.02.2020 467+020 to 040 RHS
21.02.2020 465+706 LHS
21.02.2020 486+050 RHS
21.02.2020 473+639 RHS
21.02.2020 466+715 to 730 LHS
8378 21.02.2020 536+570 536+605 L/s
8379 21.02.2020 536+605 536+630 L/s
3729 21.02.2020 536+570 536+605 L/s
3730 21.02.2020 536+605 536+630 L/s
3003 21.02.2020 465+706 LHS
3004 21.02.2020 452+687 RHS
22.02.2020 473+954 RHS
22.02.2020 Casting yard(Gambhoi)
3005 22.02.2020 452+687 RHS
23.02.2020 Casting yard(Gambhoi)
8380 23.02.2020 532+780 R/s
8381 23.02.2020 536+610 536+640 L/s
3731 23.02.2020 532+780 R/s
3732 23.02.2020 536+610 536+640 L/s
24.02.2020 Casting yard(Gambhoi)
24.02.2020 476+496 RHS
3006 24.02.2020 457+705 RHS
25.02.2020 465+705 RHS
25.02.2020 473+954 RHS
25.02.2020 473+954
25.02.2020 473+639 RHS
25.02.2020 Casting yard(Gambhoi)
25.02.2020 467+015 to 040 RHS
26.02.2020 452+687 LHS
26.02.2020 467+040 to 060 RHS
26.02.2020 486+000 RHS
26.02.2020 465+706 RHS
26.02.2020 Casting yard(Gambhoi)
8382 26.02.2020 536+565 536+605 L/s
3733 26.02.2020 536+565 536+605 L/s
27.02.2020 467+015 to 466+990 RHS
27.02.2020 486+100 RHS
27.02.2020 Casting yard(Gambhoi)
3007 27.02.2020 452+687 LHS
28.02.2020 Casting yard(Gambhoi)
3008 28.02.2020 457+760 LHS
3009 28.02.2020 452+687 LHS
3010 28.02.2020 452+760 LHS
29.02.2020 476+496 RHS
29.02.2020 476+496
29.02.2020 466+955 TO 990 RHS
29.02.2020 Casting yard(Gambhoi)
8383 29.02.2020 536+589 536+640 L/s
3734 29.02.2020 536+589 536+640 L/s
3011 29.02.2020 447+803 LHS
3012 29.02.2020 452+760 LHS
3013 01.03.2020 464+417 RHS
3735 01.03.2020 514+693 R/s
8384 01.03.2020 514+693 R/s
01.03.2020 Casting yard(Gambhoi)
3014 02.03.2020 461+380 RHS
3736 02.03.2020 528+127 R/s
3737 02.03.2020 536+465 536+505 L/s
3738 02.03.2020 514+693 L/s
8385 02.03.2020 528+127 R/s
8386 02.03.2020 536+465 536+505 L/s
8387 02.03.2020 514+693 L/s
02.03.2020 474+900 LHS
02.03.2020 Casting yard(Gambhoi)
3015 03.03.2020 465+706 RHS
3016 03.03.2020 473+954
3017 03.03.2020 452+800 LHS
03.03.2020 467+035 to 466+060 RHS
03.03.2020 473+954 RHS
03.03.2020 Casting yard(Gambhoi)
03.03.2020 Casting yard(Gambhoi)
03.03.2020 497+335 to 355 LHS
3018 04.03.2020 476+496 RHS
3019 04.03.2020 464+417 LHS
04.03.2020 476+496 RHS
04.03.2020 476+496
04.03.2020 488+281
04.03.2020
04.03.2020 Casting yard(Gambhoi)
04.03.2020 Casting yard(Gambhoi)
3020 05.03.2020 457+629 LHS
3021 05.03.2020 457+629 LHS
3022 05.03.2020 452+760 LHS
3739 05.03.2020 514+693 R/s
8388 05.03.2020 514+693 R/s
05.03.2020 Casting yard(Gambhoi)
06.03.2020 Casting yard(Gambhoi)
07.03.2020 478+284 LHS
07.03.2020 469+100 RHS
07.03.2020 Casting yard(Gambhoi)
07.03.2020 486+204 LHS
07.03.2020 486+204
08.03.2020 Casting yard(Gambhoi)
12.03.2020 Casting yard(Gambhoi)
13.03.2020 Casting yard(Gambhoi)
14.03.2020 Casting yard(Gambhoi)
3023 16.03.2020 467+354 LHS
16.03.2020 Casting yard(Gambhoi)
3024 17.03.2020 447+803 LHS
17.03.2020 Casting yard(Gambhoi)
18.03.2020 Casting yard(Gambhoi)
3025 19.03.2020 447+803 LHS
3026 19.03.2020 457+629 LHS
3027 19.03.2020 457+629 LHS
3740 19.03.2020 531+095 531+205 R/s
3741 19.03.2020 536+560 536+580 R/s
3742 19.03.2020 536+260 536+280 R/s
8389 19.03.2020 531+095 531+205 R/s
8390 19.03.2020 536+560 536+580 R/s
8391 19.03.2020 536+260 536+280 R/s
19.03.2020 457+629 LHS
19.03.2020 478+400 LHS
19.03.2020 Casting yard(Gambhoi)
3028 20.03.2020 461+380 RHS
3743 20.03.2020 531+125 531+175 R/s
3744 20.03.2020 533+200 533+225 R/s
3745 20.03.2020 533+580 533+590 R/s
8392 20.03.2020 531+125 531+175 R/s
8393 20.03.2020 533+200 533+225 R/s
8394 20.03.2020 533+580 533+590 R/s
3029 21.03.2020 461+380 RHS
3030 21.03.2020 447+803 LHS
3746 21.03.2020 526+500 R/s
3747 21.03.2020 533+200 533+225 R/s
3748 21.03.2020 533+580 533+590 R/s
3749 21.03.2020 514+480 514+500 L/s
3750 21.03.2020 514+456 514+474 L/s
8395 21.03.2020 526+500 R/s
8396 21.03.2020 533+200 533+225 R/s
8397 21.03.2020 533+580 533+590 R/s
8398 21.03.2020 514+480 514+500 L/s
8399 21.03.2020 514+456 514+474 L/s
21.03.2020 488+280 (Gambhoi camp)
21.03.2020
21.03.2020 489+950 RHS
21.03.2020 497+390 to 400 LHS
21.03.2020 497+365 to 390 LHS
21.03.2020 Casting yard(Gambhoi)
3031 23.03.2020 457+629 LHS
3032 23.03.2020 465+706 LHS
3033 23.03.2020 461+380 RHS
3751 23.03.2020 526+500 R/s
3752 23.03.2020 536+094 L/s
8400 23.03.2020 526+500 R/s
8401 23.03.2020 536+094 L/s
469+100 RHS
8402 20.04.2020 536+094 L/s
3753 20.04.2020 536+094 L/s
21.04.2020 461+380 LHS
21.04.2020 476+496 RHS
21.04.2020 Casting yard(Gambhoi)
22.04.2020 467+354 LHS
22.04.2020 Casting yard(Gambhoi)
22.04.2020 Casting yard(Gambhoi)
23.04.2020 491+080 LHS
8403 23.04.2020 502+701 R/s
8404 23.04.2020 526+500 R/s
3754 23.04.2020 502+701 R/s
3755 23.04.2020 526+500 R/s
24.04.2020 Asal Plant
8405 24.04.2020 514+500 514+520 L/s
8406 24.04.2020 514+474 514+492 L/s
8407 24.04.2020 536+094 L/s
3756 24.04.2020 514+500 514+520 L/s
3757 24.04.2020 514+474 514+492 L/s
3758 24.04.2020 536+094 L/s
25.04.2020 467+354 RHS
8408 25.04.2020 526+500 R/s
8409 25.04.2020 514+520 514+530 L/s
8410 25.04.2020 514+492 514+510 L/s
8411 25.04.2020 514+558 514+582 L/s
3759 25.04.2020 526+500 R/s
3760 25.04.2020 514+520 514+530 L/s
3761 25.04.2020 514+492 514+510 L/s
3762 25.04.2020 514+558 514+582 L/s
26.04.2020 491+080 LHS
8412 26.04.2020 526+500 R/s
3763 26.04.2020 526+500 R/s
27.04.2020 Gambhoi Plant
27.04.2020 480+650 LHS
8413 27.04.2020 514+550 514+570 L/s
8414 27.04.2020 514+510 514+528 L/s
8415 27.04.2020 514+582 514+606 L/s
8416 27.04.2020 502+815 R/s
8417 27.04.2020 502+570 R/s
3764 27.04.2020 514+550 514+570 L/s
3765 27.04.2020 514+510 514+528 L/s
3766 27.04.2020 514+582 514+606 L/s
3767 27.04.2020 502+815 R/s
3768 27.04.2020 502+570 R/s
28.04.2020 Gambhoi Plant
8418 28.04.2020 514+570 514+590 L/s
8419 28.04.2020 514+528 514+548 L/s
3769 28.04.2020 514+570 514+590 L/s
3770 28.04.2020 514+528 514+548 L/s
29.04.2020 467+354 RHS
8420 29.04.2020 502+570 R/s
8421 29.04.2020 514+590 514+610 L/s
8422 29.04.2020 514+548 514+566 L/s
8423 29.04.2020 526+500 R/s
8424 29.04.2020 526+500 R/s
3771 29.04.2020 502+570 R/s
3772 29.04.2020 514+590 514+610 L/s
3773 29.04.2020 514+548 514+566 L/s
3774 29.04.2020 526+500 R/s
3775 29.04.2020 526+500 R/s
30.04.2020 469+200 RHS
8425 30.04.2020 502+701 R/s
8426 30.04.2020 536+094 L/s
3776 30.04.2020 502+701 R/s
3777 30.04.2020 536+094 L/s
3034 30.04.2020 Asal Plant
3035 01.05.2020 447+803 LHS
3036 02.05.2020 447+803 LHS
3778 02.05.2020 526+500 R/s
8427 02.05.2020 526+500 R/s
02.05.2020 481+848 RHS
3037 03.05.2020 447+803 LHS
3779 03.05.2020 526+500 R/s
8428 03.05.2020 526+500 R/s
3038 04.05.2020 457+629 LHS
3039 04.05.2020 447+803 LHS
3040 04.05.2020 469+123 LHS
3041 04.05.2020 457+629 LHS
3780 04.05.2020 526+500 R/s
8429 04.05.2020 526+500 R/s
3042 05.05.2020 457+629 RHS
3043 05.05.2020 447+749 LHS
3781 06.05.2020 537+710 537+730 L/s
3782 06.05.2020 537+740 53+760 L/s
8430 06.05.2020 537+710 537+730 L/s
8431 06.05.2020 537+740 53+760 L/s
06.05.2020 486+204 LHS
3044 07.05.2020 447+803 LHS
3045 07.05.2020 457+629 RHS
3783 07.05.2020 526+500 R/s
8432 07.05.2020 526+500 R/s
3046 08.05.2020 457+629 LHS
3047 08.05.2020 Asal Plant
3048 08.05.2020 476+496 RHS
08.05.2020 478+177 RHS
3049 09.05.2020 467+354 RHS
3050 09.05.2020 447+803 LHS
3051 09.05.2020 467+354 RHS
3784 09.05.2020 526+500 R/s
3785 09.05.2020 536+094 L/s
8433 09.05.2020 526+500 R/s
8434 09.05.2020 536+094 L/s
3052 10.05.2020 447+770 LHS
3786 10.05.2020 526+500 R/s
8435 10.05.2020 526+500 R/s
3053 11.05.2020 448+571 RHS
3054 11.05.2020 457+629 LHS
3055 11.05.2020 Asal Plant
3056 12.05.2020 448+571 RHS
3057 12.05.2020 456+947 RHS
3787 12.05.2020 537+730 537+750 L/s
3788 12.05.2020 537+760 537+780 L/s
3789 12.05.2020 520+586 L/s
8436 12.05.2020 537+730 537+750 L/s
8437 12.05.2020 537+760 537+780 L/s
8438 12.05.2020 520+586 L/s
3058 13.05.2020 Asal Plant
3059 13.05.2020 457+629 RHS
3060 14.05.2020 467+354 RHS
3061 14.05.2020 463+220 RHS
3790 14.05.2020 520+586 L/s
3791 14.05.2020 537+780 537+820 L/s
8439 14.05.2020 520+586 L/s
8440 14.05.2020 537+780 537+820 L/s
3792 15.05.2020 526+500 R/s
8441 15.05.2020 526+500 R/s
3062 16.05.2020 469+123 LHS
3063 16.05.2020 Asal Plant LHS
3793 16.05.2020 520+586 520+620 L/s
8442 16.05.2020 520+586 520+620 L/s
3064 17.05.2020 476+496 RHS
3065 18.05.2020 Asal Plant LHS
3066 18.05.2020 476+496 RHS
3794 18.05.2020 526+500 R/s
8443 18.05.2020 526+500 R/s
3067 19.05.2020 469+123 LHS
3068 19.05.2020 457+629 RHS
3795 19.05.2020 520+755 520+820 L/s
8444 19.05.2020 520+755 520+820 L/s
3796 20.05.2020 520+820 520+870 L/s
3797 20.05.2020 520+755 520+767 B/s
3798 20.05.2020 537+750 537+770 L/s
3799 20.05.2020 537+780 537+800 L/s
8445 20.05.2020 520+820 520+870 L/s
8446 20.05.2020 520+755 520+767 B/s
8447 20.05.2020 537+750 537+770 L/s
8448 20.05.2020 537+780 537+800 L/s
3069 21.05.2020 463+904 RHS
3070 21.05.2020 453+960 LHS
3071 22.05.2020 453+960 LHS
3072 22.05.2020 467+354 RHS
3073 22.05.2020 447+680 LHS
3074 22.05.2020 453+960 LHS
3800 22.05.2020 526+500 R/s
8449 22.05.2020 526+500 R/s
3075 23.05.2020 476+496 RHS
3076 23.05.2020 453+960 LHS
3077 23.05.2020 Asal Plant
3078 23.05.2020 451+900 RHS
3079 24.05.2020 456+947 RHS
3080 24.05.2020 451+900 RHS
3801 24.05.2020 537+770 537+790 L/s
3802 24.05.2020 537+800 537+820 L/s
8450 24.05.2020 537+770 537+790 L/s
8451 24.05.2020 537+800 537+820 L/s
3081 25.05.2020 457+629 RHS
3082 25.05.2020 464+417 LHS
3083 25.05.2020 464+417 RHS
3084 25.05.2020 451+900 RHS
3085 25.05.2020 476+496 RHS
3803 25.05.2020 537+820 537+840 L/s
8452 25.05.2020 537+820 537+840 L/s
3086 26.05.2020 469+123 Lhs
3087 26.05.2020 451+040 Lhs
3088 26.05.2020 457+629 Rhs
3089 26.05.2020 451+040 Lhs
3804 26.05.2020 537+840 537+880 L/s
8453 26.05.2020 537+840 537+880 L/s
26.05.2020 457+629 RHS
3090 27.05.2020 451+040 Lhs
3091 27.05.2020 464+417 Lhs
3092 28.05.2020 453+120 Rhs
3093 28.05.2020 Asal Plant
3094 28.05.2020 464+417 Rhs
3095 28.05.2020 451+040 Lhs
3096 28.05.2020 456+947 Rhs
3805 28.05.2020 526+500 R/s
3806 28.05.2020 537+790 537+810 L/s
3807 28.05.2020 537+820 537+830 L/s
3808 28.05.2020 537+750 537+760 L/s
8454 28.05.2020 526+500 R/s
8455 28.05.2020 537+790 537+810 L/s
8456 28.05.2020 537+820 537+830 L/s
8457 28.05.2020 537+750 537+760 L/s
3097 29.05.2020 456+947 Rhs
3098 29.05.2020 464+417 Rhs
3099 29.05.2020 451+040 Lhs
3100 29.05.2020 453+120 Rhs
3101 29.05.2020 447+850 Lhs
3102 29.05.2020 Asal Plant
3103 29.05.2020 451+900 Rhs
3104 30.05.2020 451+040 Lhs
3105 30.05.2020 464+417 Rhs
3106 30.05.2020 469+123 Lhs
3107 30.05.2020 466+460 Lhs
3108 30.05.2020 476+496 Rhs
3809 30.05.2020 537+840 537+870 L/s
3810 30.05.2020 537+770 537+780 L/s
3811 30.05.2020 536+330 536+365 R/s
8458 30.05.2020 537+840 537+870 L/s
8459 30.05.2020 537+770 537+780 L/s
8460 30.05.2020 536+330 536+365 R/s
3109 31.05.2020 451+040 Lhs
3812 31.05.2020 536+635 536+400 R/s
3813 31.05.2020 536+290 536+330 R/s
3814 31.05.2020 526+500 L/s
8461 31.05.2020 536+635 536+400 R/s
8462 31.05.2020 536+290 536+330 R/s
8463 31.05.2020 526+500 L/s
8464 01.06.2020 537+810 537+830 L/s
8465 01.06.2020 537+830 537+850 L/s
3815 01.06.2020 537+810 537+830 L/s
3816 01.06.2020 537+830 537+850 L/s
3110 01.06.2020 Asal Plant
3111 01.06.2020 451+040 Lhs
3112 01.06.2020 453+120 Rhs
8466 02.06.2020 537+870 537+890 L/s
8467 02.06.2020 537+850 537+870 L/s
8468 02.06.2020 536+250 536+290 R/s
3817 02.06.2020 537+870 537+890 L/s
3818 02.06.2020 537+850 537+870 L/s
3819 02.06.2020 536+250 536+290 R/s
3113 02.06.2020 Asal Plant
3114 02.06.2020 451+040 Lhs
3115 02.06.2020 457+629 Rhs
3116 02.06.2020 447+890 Lhs
3117 02.06.2020 453+120 Rhs
3118 02.06.2020 476+496 Rhs
8469 03.06.2020 536+340 536+380 R/s
3820 03.06.2020 536+340 536+380 R/s
3119 03.06.2020 Asal Plant
3120 03.06.2020 453+120 Rhs
3121 03.06.2020 457+629 Rhs
3122 03.06.2020 469+123 Lhs
3123 03.06.2020 448+571 Rhs
8470 04.06.2020 536+305 536+340 R/s
8471 04.06.2020 537+870 537+885 L/s
8472 04.06.2020 537+830 537+850 L/s
3821 04.06.2020 536+305 536+340 R/s
3822 04.06.2020 537+870 537+885 L/s
3823 04.06.2020 537+830 537+850 L/s
3124 04.06.2020 453+900 Lhs
3125 04.06.2020 448+571 Rhs
3126 04.06.2020 448+571 Rhs
3127 04.06.2020 466+460 Rhs
3128 04.06.2020 457+629 Rhs
3129 04.06.2020 462+584 Rhs
05.06.2020 478+177 RHS
05.06.2020 469+123 LHS
05.06.2020 467+354 LHS
8473 05.06.2020 536+360 536+385 R/s
8474 05.06.2020 526+500 R/s
8475 05.06.2020 520+586 B/s
3824 05.06.2020 536+360 536+385 R/s
3825 05.06.2020 526+500 R/s
3826 05.06.2020 520+586 B/s
3130 05.06.2020 447+800 Lhs
3131 05.06.2020 464+417 Rhs
3132 05.06.2020 Asal Plant
3133 05.06.2020 478+177 Rhs
3134 05.06.2020 478+177 Rhs
3135 05.06.2020 457+629 Rhs
3136 05.06.2020 467+354 Lhs
8476 06.06.2020 537+890 537+930 L/s
8477 06.06.2020 537+850 537+872 L/s
8478 06.06.2020 536+340 536+360 R/s
3827 06.06.2020 537+890 537+930 L/s
3828 06.06.2020 537+850 537+872 L/s
3829 06.06.2020 536+340 536+360 R/s
3137 06.06.2020 Asal Plant
3138 06.06.2020 449+040 Lhs
3139 06.06.2020 469+123 Lhs
3140 06.06.2020 Asal Plant
8479 07.06.2020 536+340 536+360 R/s
8480 07.06.2020 536+285 536+305 R/s
3830 07.06.2020 536+340 536+360 R/s
3831 07.06.2020 536+285 536+305 R/s
3141 07.06.2020 457+629 Rhs
3142 07.06.2020 448+571 Lhs
3143 07.06.2020 467+354 Lhs
8481 08.06.2020 526+500 R/s
8482 08.06.2020 520+586 L/s
8483 08.06.2020 501+168 R/s
8484 08.06.2020 537+890 537+910 L/s
8485 08.06.2020 537+872 537+887 L/s
8486 08.06.2020 536+245 536+285 R/s
3832 08.06.2020 526+500 R/s
3833 08.06.2020 520+586 L/s
3834 08.06.2020 501+168 R/s
3835 08.06.2020 537+890 537+910 L/s
3836 08.06.2020 537+872 537+887 L/s
3837 08.06.2020 536+245 536+285 R/s
3144 08.06.2020 456+947 Rhs
3145 08.06.2020 469+123 Rhs
3146 08.06.2020 464+417 Lhs
8487 09.06.2020 536+325 536+340 R/s
8488 09.06.2020 536+360 536+386 R/s
8489 09.06.2020 526+500 R/s
3838 09.06.2020 536+325 536+340 R/s
3839 09.06.2020 536+360 536+386 R/s
3840 09.06.2020 526+500 R/s
3147 09.06.2020 467+354 Rhs
3148 09.06.2020 463+904 Lhs
8490 10.06.2020 537+910 537+925 L/s
8491 10.06.2020 537+872 537+892 L/s
8492 10.06.2020 520+586 L/s
3841 10.06.2020 537+910 537+925 L/s
3842 10.06.2020 537+872 537+892 L/s
3843 10.06.2020 520+586 L/s
3149 10.06.2020 467+354 Lhs
3150 10.06.2020 467+354 Rhs
3151 10.06.2020 Asal Plant
3152 10.06.2020 Asal Plant
3153 10.06.2020 448+571 Rhs
3154 10.06.2020 447+970 Lhs
3155 11.06.2020 463+904 Lhs
3156 11.06.2020 448+571 Lhs
8493 12.06.2020 536+310 536+325 R/s
8494 12.06.2020 536+340 536+360 R/s
3844 12.06.2020 536+310 536+325 R/s
3845 12.06.2020 536+340 536+360 R/s
3157 12.06.2020 467+354 Rhs
3158 13.06.2020 Asal plant
3159 14.06.2020 467+354 Rhs
3160 14.06.2020 467+354 Lhs
3161 16.06.2020 466+840 Rhs
3162 16.06.2020 448+571 Lhs
3163 16.06.2020 Asal Plant
3164 16.06.2020 457+629 Rhs
8495 17.06.2020 536+270 536+290 R/s
8496 17.06.2020 536+320 536+340 R/s
8497 17.06.2020 518+295 518+370 R/s
8498 17.06.2020 537+205 537+220 L/s
8499 17.06.2020 537+165 537+180 L/s
3846 17.06.2020 536+270 536+290 R/s
3847 17.06.2020 536+320 536+340 R/s
3848 17.06.2020 518+295 518+370 R/s
3849 17.06.2020 537+205 537+220 L/s
3850 17.06.2020 537+165 537+180 L/s
3165 17.06.2020 469+123 Lhs
3166 17.06.2020 467+354 Lhs
3167 17.06.2020 469+123 Lhs
3168 17.06.2020 448+571 Rhs
8500 18.06.2020 536+094 L/s
3851 18.06.2020 536+094 L/s
3169 18.06.2020 Asal Plant
3170 18.06.2020 465+706 Rhs
3171 18.06.2020 467+123 Lhs
3172 18.06.2020 457+629 Rhs
8501 19.06.2020 537+190 537+205 L/s
8502 19.06.2020 537+230 537+245 L/s
8503 19.06.2020 536+250 536+270 R/s
8504 19.06.2020 536+300 536+320 R/s
8505 19.06.2020 518+255 518+295 R/s
3852 19.06.2020 537+190 537+205 L/s
3853 19.06.2020 537+230 537+245 L/s
3854 19.06.2020 536+250 536+270 R/s
3855 19.06.2020 536+300 536+320 R/s
3856 19.06.2020 518+255 518+295 R/s
3173 19.06.2020 457+629 Lhs
3174 19.06.2020 453+200 Lhs
20.06.2020 467+354 RHS
20.06.2020 469+100 RHS
20.06.2020 467+354 RHS
8506 20.06.2020 518+180 518+255 R/s
8507 20.06.2020 536+205 536+245 R/s
3857 20.06.2020 518+180 518+255 R/s
3858 20.06.2020 536+205 536+245 R/s
3175 21.06.2020 447+800 Lhs
8508 22.06.2020 536+240 536+250 R/s
8509 22.06.2020 536+270 536+300 R/s
8510 22.06.2020 518+320 518+360 R/s
8511 22.06.2020 526+500 R/s
3859 22.06.2020 536+240 536+250 R/s
3860 22.06.2020 536+270 536+300 R/s
3861 22.06.2020 518+320 518+360 R/s
3862 22.06.2020 526+500 R/s
3176 22.06.2020 457+629 Rhs
3177 22.06.2020 Asal Plant
3178 22.06.2020 448+571 Lhs
3179 22.06.2020 467+354 Rhs
8512 23.06.2020 518+280 518+330 R/s
8513 23.06.2020 537+200 537+215 L/s
8514 23.06.2020 537+230 537+245 L/s
3863 23.06.2020 518+280 518+330 R/s
3864 23.06.2020 537+200 537+215 L/s
3865 23.06.2020 537+230 537+245 L/s
3180 23.06.2020 Asal Plant
3181 23.06.2020 464+417 Rhs
3182 23.06.2020 457+629 Lhs
8515 24.06.2020 537+100 537+140 L/s
8516 24.06.2020 537+165 537+180 L/s
8517 24.06.2020 537+215 537+230 L/s
8518 24.06.2020 518+280 518+200 R/s
8519 24.06.2020 518+320 518+360 R/s
8520 24.06.2020 527+732 R/s
8521 24.06.2020 528+764 L/s
3866 24.06.2020 537+100 537+140 L/s
3867 24.06.2020 537+165 537+180 L/s
3868 24.06.2020 537+215 537+230 L/s
3869 24.06.2020 518+280 518+200 R/s
3870 24.06.2020 518+320 518+360 R/s
3871 24.06.2020 527+732 R/s
3872 24.06.2020 528+764 L/s
3183 24.06.2020 467+354 Rhs
3184 24.06.2020 457+629 Rhs
3185 24.06.2020 466+420 Lhs
3186 24.06.2020 456+947 Rhs
8522 25.06.2020 518+210 518+180 R/s
8523 25.06.2020 Majra Camp L/s
3873 25.06.2020 518+210 518+180 R/s
3874 25.06.2020 Majra Camp L/s
3187 25.06.2020 469+123 Lhs
3188 25.06.2020 464+417 Rhs
3189 25.06.2020 448+517 Rhs
3190 25.06.2020 448+571 Lhs
3191 26.06.2020 480+652 Rhs
27.06.2020 457+629 Rhs
8524 27.06.2020 513+946 R/s
8525 27.06.2020 528+764 L/s
8526 27.06.2020 518+280 518+320 R/s
8527 27.06.2020 518+320 518+360 R/s
8528 27.06.2020 536+245 536+270 R/s
8529 27.06.2020 536+220 536+240 R/s
3875 27.06.2020 513+946 R/s
3876 27.06.2020 528+764 L/s
3877 27.06.2020 518+280 518+320 R/s
3878 27.06.2020 518+320 518+360 R/s
3879 27.06.2020 536+245 536+270 R/s
3880 27.06.2020 536+220 536+240 R/s
3192 27.06.2020 466+420 Lhs
8530 28.06.2020 537+175 537+215 L/s
8531 28.06.2020 527+732 R/s
3881 28.06.2020 537+175 537+215 L/s
3882 28.06.2020 527+732 R/s
3193 28.06.2020 448+571 Rhs
3194 28.06.2020 Asal Plant
8532 29.06.2020 518+260 518+295 R/s
8533 29.06.2020 518+295 518+330 R/s
8534 29.06.2020 518+054 L/s
8535 29.06.2020 530+586 530+660 R/s
3883 29.06.2020 518+260 518+295 R/s
3884 29.06.2020 518+295 518+330 R/s
3885 29.06.2020 518+054 L/s
3886 29.06.2020 530+586 530+660 R/s
3195 29.06.2020 457+629 Rhs
3196 29.06.2020 457+629 Rhs
3197 29.06.2020 465+146 Rhs
8536 30.06.2020 513+946 R/s
3887 30.06.2020 513+946 R/s
3198 30.06.2020 457+629 Lhs
3199 01.07.2020 456+947 Rhs
3200 01.07.2020 467+354 Lhs
3201 01.07.2020 469+123 Lhs
3888 01.07.2020 537+120 537+140 L/s
3889 01.07.2020 537+160 537+185 L/s
3890 01.07.2020 536+205 536+225 R/s
3891 01.07.2020 536+225 536+245 R/s
3892 01.07.2020 518+215 518+225 R/s
3893 01.07.2020 518+260 518+295 R/s
8537 01.07.2020 537+120 537+140 L/s
8538 01.07.2020 537+160 537+185 L/s
8539 01.07.2020 536+205 536+225 R/s
8540 01.07.2020 536+225 536+245 R/s
8541 01.07.2020 518+215 518+225 R/s
8542 01.07.2020 518+260 518+295 R/s
3202 02.07.2020 469+123 Lhs
3203 02.07.2020 448+571 Lhs
3204 02.07.2020 458+629 Rhs
3205 02.07.2020 457+629 Rhs
3206 02.07.2020 467+354 Lhs
3894 02.07.2020 518+180 518+220 R/s
3895 02.07.2020 518+225 518+260 R/s
3896 02.07.2020 518+054 L/s
8543 02.07.2020 518+180 518+220 R/s
8544 02.07.2020 518+225 518+260 R/s
8545 02.07.2020 518+054 L/s
3207 03.07.2020 448+571 Rhs
3208 03.07.2020 448+571 Rhs
3209 03.07.2020 465+146 Rhs
3210 03.07.2020 447+970 Lhs
3897 03.07.2020 518+180 518+225 R/s
8546 03.07.2020 518+180 518+225 R/s
3211 04.07.2020 465+146 Rhs
3212 04.07.2020 456+947 Rhs
3213 04.07.2020 457+629 Rhs
3214 04.07.2020 457+629 Rhs
3898 04.07.2020 518+688 518+700 L/s
3899 04.07.2020 518+970 519+000 L/s
3900 04.07.2020 536+185 536+205 L/s
3901 04.07.2020 536+210 536+225 L/s
3902 04.07.2020 536+175 536+185 L/s
3903 04.07.2020 536+094 L/s
3904 04.07.2020 513+946 L/s
8547 04.07.2020 518+688 518+700 L/s
8548 04.07.2020 518+970 519+000 L/s
8549 04.07.2020 536+185 536+205 L/s
8550 04.07.2020 536+210 536+225 L/s
8551 04.07.2020 536+175 536+185 L/s
8552 04.07.2020 536+094 L/s
8553 04.07.2020 513+946 L/s
3215 05.07.2020 467+354 Lhs
3216 05.07.2020 449+040 Lhs
3217 05.07.2020 474+177 Lhs
3905 05.07.2020 526+500 R/s
3906 05.07.2020 536+160 536+175 R/s
3907 05.07.2020 537+140 537+165 L/s
3908 05.07.2020 537+100 537+113 L/s
8554 05.07.2020 526+500 R/s
8555 05.07.2020 536+160 536+175 R/s
8556 05.07.2020 537+140 537+165 L/s
8557 05.07.2020 537+100 537+113 L/s
3218 06.07.2020 456+947 Rhs
3219 06.07.2020 457+629 Rhs
3220 06.07.2020 457+629 Rhs
3221 06.07.2020 447+673 Lhs
3909 06.07.2020 538+950 539+010 L/s
3910 06.07.2020 518+688 518+700 L/s
3911 06.07.2020 518+970 519+000 L/s
3912 06.07.2020 537+085 537+113 L/s
3913 06.07.2020 537+125 537+140 L/s
3914 06.07.2020 536+165 536+185 R/s
3915 06.07.2020 536+195 536+210 R/s
3916 06.07.2020 Majra Camp L/s
3917 06.07.2020 514+693 L/s
8558 06.07.2020 538+950 539+010 L/s
8559 06.07.2020 518+688 518+700 L/s
8560 06.07.2020 518+970 519+000 L/s
8561 06.07.2020 537+085 537+113 L/s
8562 06.07.2020 537+125 537+140 L/s
8563 06.07.2020 536+165 536+185 R/s
8564 06.07.2020 536+195 536+210 R/s
8565 06.07.2020 Majra Camp L/s
8566 06.07.2020 514+693 L/s
3222 07.07.2020 465+146 Rhs
3918 07.07.2020 527+732 R/s
8567 07.07.2020 527+732 R/s
3223 08.07.2020 473+954 Lhs
3919 08.07.2020 527+732 R/s
3920 08.07.2020 531+125 531+180 R/s
3921 08.07.2020 528+280 528+320 R/s
3922 08.07.2020 537+065 537+080 L/s
3923 08.07.2020 537+115 537+125 L/s
3924 08.07.2020 537+130 537+142 L/s
3925 08.07.2020 536+150 536+165 R/s
3926 08.07.2020 536+170 536+195 R/s
3927 08.07.2020 538+993 539+035 L/s
8568 08.07.2020 527+732 R/s
8569 08.07.2020 531+125 531+180 R/s
8570 08.07.2020 528+280 528+320 R/s
8571 08.07.2020 537+065 537+080 L/s
8572 08.07.2020 537+115 537+125 L/s
8573 08.07.2020 537+130 537+142 L/s
8574 08.07.2020 536+150 536+165 R/s
8575 08.07.2020 536+170 536+195 R/s
8576 08.07.2020 538+993 539+035 L/s
3928 09.07.2020 528+220 528+280 R/s
3929 09.07.2020 528+080 528+150 R/s
8577 09.07.2020 528+220 528+280 R/s
8578 09.07.2020 528+080 528+150 R/s
3224 10.07.2020 457+629 Rhs
3225 10.07.2020 Asal Plant
3930 10.07.2020 518+672 518+680 L/s
3931 10.07.2020 518+688 518+700 L/s
3932 10.07.2020 518+700 518+710 L/s
3933 10.07.2020 518+900 518+910 L/s
3934 10.07.2020 536+140 536+170 R/s
3935 10.07.2020 537+118 537+130 L/s
3936 10.07.2020 537+018 537+030 L/s
3937 10.07.2020 538+950 538+970 L/s
3938 10.07.2020 538+900 538+925 L/s
3939 10.07.2020 539+010 539+030 L/s
3940 10.07.2020 518+180 518+120 L/s
3941 10.07.2020 512+953 512+973 L/s
3942 10.07.2020 512+970 512+990 L/s
3943 10.07.2020 512+850 512+870 R/s
3944 10.07.2020 512+827 512+846 R/s
3945 10.07.2020 518+054 L/s
3946 10.07.2020 527+732 R/s
3947 10.07.2020 520+586 L/s
8579 10.07.2020 518+672 518+680 L/s
8580 10.07.2020 518+688 518+700 L/s
8581 10.07.2020 518+700 518+710 L/s
8582 10.07.2020 518+900 518+910 L/s
8583 10.07.2020 536+140 536+170 R/s
8584 10.07.2020 537+118 537+130 L/s
8585 10.07.2020 537+018 537+030 L/s
8586 10.07.2020 538+950 538+970 L/s
8587 10.07.2020 538+900 538+925 L/s
8588 10.07.2020 539+010 539+030 L/s
8589 10.07.2020 518+180 518+120 L/s
8590 10.07.2020 512+953 512+973 L/s
8591 10.07.2020 512+970 512+990 L/s
8592 10.07.2020 512+850 512+870 R/s
8593 10.07.2020 512+827 512+846 R/s
8594 10.07.2020 518+054 L/s
8595 10.07.2020 527+732 R/s
8596 10.07.2020 520+586 L/s
3226 11.07.2020 469+140 Lhs
3227 11.07.2020 473+972 Lhs
3228 11.07.2020 457+629 Rhs
3229 11.07.2020 448+571 Lhs
3230 11.07.2020 474+288 Lhs
3948 11.07.2020 512+935 513+045 R/s
3949 11.07.2020 512+870 512+885 R/s
3950 11.07.2020 512+846 512+865 R/s
3951 11.07.2020 512+990 513+000 L/s
3952 11.07.2020 513+020 513+056 L/s
3953 11.07.2020 538+925 538+940 L/s
3954 11.07.2020 537+010 537+020 L/s
3955 11.07.2020 519+080 518+120 L/s
3956 11.07.2020 518+970 519+003 L/s
3957 11.07.2020 518+054 L/s
3958 11.07.2020 497+355 497+370 R/s
8597 11.07.2020 512+935 513+045 R/s
8598 11.07.2020 512+870 512+885 R/s
8599 11.07.2020 512+846 512+865 R/s
8600 11.07.2020 512+990 513+000 L/s
8601 11.07.2020 513+020 513+056 L/s
8602 11.07.2020 538+925 538+940 L/s
8603 11.07.2020 537+010 537+020 L/s
8604 11.07.2020 519+080 518+120 L/s
8605 11.07.2020 518+970 519+003 L/s
8606 11.07.2020 518+054 L/s
8607 11.07.2020 497+355 497+370 R/s
3231 12.07.2020 Asal Plant
3959 12.07.2020 597+480 L/s
3960 12.07.2020 513+060 513+130 R/s
3961 12.07.2020 518+960 518+970 L/s
3962 12.07.2020 518+690 518+700 L/s
3963 12.07.2020 513+946 R/s
3964 12.07.2020 518+054 L/s
8608 12.07.2020 597+480 L/s
8609 12.07.2020 513+060 513+130 R/s
8610 12.07.2020 518+960 518+970 L/s
8611 12.07.2020 518+690 518+700 L/s
8612 12.07.2020 513+946 R/s
8613 12.07.2020 518+054 L/s
12.07.2020 465+142 Rhs
12.07.2020 490+640 490+680 Rhs
12.07.2020 489+470 489+495 Rhs
12.07.2020 489+505 489+530 Rhs
12.07.2020 489+398 489+422 Rhs
3965 13.07.2020 512+990 513+005 L/s
3966 13.07.2020 513+056 513+070 L/s
3967 13.07.2020 512+990 513+005 L/s
3968 13.07.2020 497+340 497+350 R/s
3969 13.07.2020 497+355 497+365 R/s
3970 13.07.2020 497+365 497+373 R/s
3971 13.07.2020 512+935 513+005 R/s
3972 13.07.2020 512+865 512+884 R/s
3973 13.07.2020 518+970 518+990 L/s
3974 13.07.2020 519+080 519+100 L/s
3975 13.07.2020 518+180 518+360 L/s
3976 13.07.2020 527+732 R/s
3977 13.07.2020 538+950 538+965 L/s
3978 13.07.2020 538+990 539+010 L/s
8614 13.07.2020 512+990 513+005 L/s
8615 13.07.2020 513+056 513+070 L/s
8616 13.07.2020 512+990 513+005 L/s
8617 13.07.2020 497+340 497+350 R/s
8618 13.07.2020 497+355 497+365 R/s
8619 13.07.2020 497+365 497+373 R/s
8620 13.07.2020 512+935 513+005 R/s
8621 13.07.2020 512+865 512+884 R/s
8622 13.07.2020 518+970 518+990 L/s
8623 13.07.2020 519+080 519+100 L/s
8624 13.07.2020 518+180 518+360 L/s
8625 13.07.2020 527+732 R/s
8626 13.07.2020 538+950 538+965 L/s
8627 13.07.2020 538+990 539+010 L/s
13.07.2020 490+416 490+428 Rhs
13.07.2020 490+500 490+520 Rhs
13.07.2020 484+480 484+490 Rhs
13.07.2020 489+398 489+422 Rhs
13.07.2020 490+480 490+500 Rhs
13.07.2020 490+678 490+720 Rhs
13.07.2020 478+284 Lhs
13.07.2020 491+305 Lhs
13.07.2020 447+673 Lhs
13.07.2020 448+571 Lhs
13.07.2020 490+720 490+758 Rhs
Girder Yard Labour Shelter rain water protection M30 1.5 Sandeep
Karan sing
Jai Baba
Dimond
R.S Infra
Ruhi
RUHI
RUHI
Geocon
Geocon
MAHAKALI
MAHAKALI
DHAN SING
Shrce Nivos
Geocon
Jai Baba
SRI NIVAS
Ruhi
Dimond
Creatihe infra
U.B Infra
Gulab Sing
Dimond
Ruhi
Ruhi
Jai Baba
Yogi
R.S Infra
Gulab Sing
Gulab Sing
Gulab Sing
Dimond
Karan sing
U.B Infra
Jai Baba
Pramod
Pramod
Nukul
B.R.Neetu
B.R.Neetu
R.G.Infra
BVG
Jay Shree Shyam
R.G.Infra
Shivam Const.
BVG
Pramod
Pramod
Nukul
B.R.Neetu
B.R.Neetu
R.G.Infra
BVG
Jay Shree Shyam
R.G.Infra
Shivam Const.
BVG
Geocon
SURE SORT
Bhavya Jyoti
R.S INFRA
R.S INFRA
SURE SORT
SHIV BUILD.
MAHAKALI
Ashapurcon
YOGI
Stancy Infra
YOGI
Creatihe infra
DHAN SING
YOGENDRA
Bhavya Jyoti
Radhe
BHAIRAVNTH
Gulab Sing
Ruhi
Geocon
Geocon
R.S INFRA
R.S INFRA
KARAN
DIMOND
JAIBABA
DIMOND
U.B
Rajesh Singh
Rajesh Singh
Nukul
Aryan
B.R.Neetu
B.R.Neetu
Pramod
Nukul
Jay Shree Shyam
Jay Shree Shyam
R.G.Infra
R.G.Infra
R.G.Infra
Rajesh Singh
Rajesh Singh
Nukul
Aryan
B.R.Neetu
B.R.Neetu
Pramod
Nukul
Jay Shree Shyam
Jay Shree Shyam
R.G.Infra
R.G.Infra
R.G.Infra
JAIBABA
DIMOND
R.S INFRA
R.S INFRA
ORCATIVE INFRA
DHAN SING
DHAN SING
Geocon
DIMOND
KARAN
Gulab sing
DHAN SING
R.S INFRA
R.S INFRA
DIMOND
JAIBABA
Geocon
RUHI
DIMOND
DIMOND
KARAN
JAIBABA
R.S INFRA
R.S INFRA
Jay Shree Shyam
Nukul
B.R.Neetu
B.R.Neetu
Jay Shree Shyam
Aryan
Nukul
Pramod
Pramod
VBG
R.G.Infra
Jay Shree Shyam
Nukul
B.R.Neetu
B.R.Neetu
Jay Shree Shyam
Aryan
Nukul
Pramod
Pramod
VBG
R.G.Infra
DIMOND
DIMOND
JAIBABA
DHAN SING
R.S INFRA
B.R.Neetu
B.R.Neetu
Rajesh Singh
Pramod
Pramod
B.R.Neetu
B.R.Neetu
Rajesh Singh
Pramod
Pramod
DIMOND
DIMOND
RATAN SING
JAIBABA
Yogi
Jay Shree Shyam
Jay Shree Shyam
B.R.Neetu
B.R.Neetu
B.R.Neetu
Nukul
Nukul
Pramod
Pramod
R.G.Infra
Jay Shree Shyam
Jay Shree Shyam
B.R.Neetu
B.R.Neetu
B.R.Neetu
Nukul
Nukul
Pramod
Pramod
R.G.Infra
Geocon
YOGI
RUHI
R.S INFRA
DIMOND
DIMOND
JAIBABA
DHAN SING
BHAIRAVNTH
DHAN SING
R.S Infra
Raj Const.
Pramod
Pramod
Jay Shree Shyam
B.R.Neetu
B.R.Neetu
Aryan
R.G.Infra
Raj Const.
Pramod
Pramod
Jay Shree Shyam
B.R.Neetu
B.R.Neetu
Aryan
R.G.Infra
DHAN SING
BHIRVNATH
Karan sing
R.S Infra
U.B Infra
Raj.Const
Nukul
Nukul
Nukul
B.R.Neetu
B.R.Neetu
Jay Shree Shyam
R.G.Infra
Raj.Const
Nukul
Nukul
Nukul
B.R.Neetu
B.R.Neetu
Jay Shree Shyam
R.G.Infra
R.S Infra
DHAN SING
Pramod
Pramod
R.G.Infra
Pramod
Pramod
R.G.Infra
U.B Infra
DHAN SING
R.S Infra
Dimond
BVG
Mahakali
Nukul
Nukul
Pramod
R.G.Infra
BVG
Mahakali
Nukul
Nukul
Pramod
R.G.Infra
R.G.Infra
R.G.Infra
U.B Infra
Yogi
Yogi
Gulab Sing
U.B Infra
DHAN SING
U.B Infra
DHAN SING
U.B Infra
DHAN SING
Geocon
Gulab Sing
DHAN SING
DHAN SING
Geocon
Geocon
Gulab Sing
Geocon
KARAN SINGH
GULAB SING
GULAB SING
DIAMOND
U.B
ASHAPURA
Mahesh R Patel
R.G.Infra
Mahesh R Patel
R.G.Infra
ASHAPURA
YOGI
DIAMOND
N.G PL
R.G.Infra
N.G PL
R.G.Infra
U.B
DIAMOND
YOGI
R.G.Infra
R.G.Infra
YOGI
RUHI
YOGI
DHAN SING
DHAN SING
YOGI
GIOCON
R.G.Infra
R.G.Infra
U.B Infra
DAIMOND
Yogi
DHAN SING
RUHI
RUHI
GULAB SING
Gulab Sing
GEOCON
VIRAT
U.B Infra
DAIMOND
U.B Infra
DHAN SING
RUHI
Yogi
Yogi
DAIMOND
DHAN SING
U.B
GULAB SING
VIRAT
RUHI
DIAMOND
Shivam Const.
Shivam Const.
Shivam Const.
Shivam Const.
Gulab Sing
DHAN SING
RUHI
GEOCON
DHAN SING
GEOCON
Chetak Enterprises
Shivam Const.
Chetak Enterprises
Shivam Const.
GEOCON
YOGI
Mandal
GULAB SING
RUHI
RUHI
RUHI
GEOCON
U.B
DHAN SING
U.B
VIRAT
GULAB SING
GEOCON
Shivam Const.
Shivam Const.
U.B
VIRAT
GEOCON
DHAN SING
GEOCON
MANDAL
DHAN SING
DHAN SING
YOGI
YOGI
U.B
GEOCON
Shivam Const.
Shivam Const.
YOGI
DHAN SING
GULAB SINGH
Mahesh R Patel
Mahesh R Patel
GEOCON
DHAN SING
Shivam Const.
Shivam Const.
Mahesh R Patel
Shivam Const.
Shivam Const.
Mahesh R Patel
NG
GEOCON
GULAB SINGH
GULAB SINGH
DHAN SING
U.B
RUHI
GEOCON
VCC
VCC
YOGI
GULAB SINGH
YOGI
YOGI
YOGENDRA
YOGENDRA
GEOCON
VCC
YOGI
YOGI
DHAN SING
Mahesh R Patel
Mahesh R Patel
GEOCON
GEOCON
STANCY INFRA
R.S INFRA
GEOCON
Ashaphy co.
Ashaphy co.
GEOCON
GEOCON
GEOCON
GEOCON
Bhairabnath
GEOCON
GEOCON
GEOCON
GEOCON
GEOCON
YOGI
YOGI
R.G.Infra
Nakul
Nakul
R.G.Infra
Nakul
Nakul
YOGI
GEOCON
GEOCON
DHAN SING
R.G.Infra
Nakul
Nakul
R.G.Infra
Nakul
Nakul
DHAN SING
GEOCON
BVG
Nakul
Nakul
Balaji
Balaji
BVG
Nakul
Nakul
Balaji
Balaji
YOGI
YOGI
RADHE
JAY JAMAYA
JAY JAMAYA
GEOCON
YOGI
GULAB SINGH
DHAN SING
BVG
Shivam Const.
BVG
Shivam Const.
R.S INFRA
Shivam Const.
Shivam Const.
DHAN SING
Yogi
GEOCON
Bherunath
GEOCON
GEOCON
Sureshot
VBG
BVG
VBG
BVG
Creative Infra
Balaji
Balaji
Shivam Const.
Balaji
Balaji
Shivam Const.
Bherunath
BVG
Balaji
Balaji
Balaji
BVG
Balaji
Balaji
Balaji
Sureshot
BVG
BVG
GEOCON
Sureshot
Balaji
Balaji
Balaji
BVG
BVG
Balaji
Balaji
Balaji
BVG
BVG
GEOCON
Balaji
Balaji
Balaji
Balaji
Bherunath
BVG
Balaji
Balaji
BVG
BVG
BVG
Balaji
Balaji
BVG
BVG
Creative Infra
BVG
Shivam Const.
BVG
Shivam Const.
Creative infra
GEOCON
GEOCON
Shivam Const.
Shivam Const.
SIVE BILDCON
GEOCON
BVG
BVG
YOGI
GEOCON
Geativ infra
yogi
BVG
BVG
YOGI
YOGI
B.R.Neetu
B.R.Neetu
B.R.Neetu
B.R.Neetu
ASHAPHRY
GEOCON
YOGI
BVG
BVG
YOGI
Creative infra
YOGI
Sureshat Seivices
Phernath
GEOCON
Phernath
BVG
Shivam Const.
BVG
Shivam Const.
GEOCON
BVG
BVG
VIOMORE
YOGI
GETIVITRA
WAYMENE
YOGI
B.R.Neetu
B.R.Neetu
MMR Infra
B.R.Neetu
B.R.Neetu
MMR Infra
GEOCON
YOGI
Bherunath
GEOCON
MMR Infra
B.R.Neetu
MMR Infra
B.R.Neetu
BVG
BVG
Creative infra
Creative infra
MMR Infra
MMR Infra
YOGI
Creative infra
YOGI
BVG
BVG
Creative infra
YOGI
MMR Infra
MMR Infra
MMR Infra
MMR Infra
B.R.Neetu
B.R.Neetu
MMR Infra
MMR Infra
B.R.Neetu
B.R.Neetu
GEOCON
Dhansingh
Dhansingh
Bherunath
GEOCON
Dhansingh
BVG
BVG
YOGI
Dhansingh
Creative infra
Dhansingh
YOGI
Dhansingh
B.R.Neetu
B.R.Neetu
B.R.Neetu
B.R.Neetu
YOGI
Gulab singh
Gulab singh
Dhansingh
YOGI
B.R.Neetu
B.R.Neetu
Creative infra
Dhansingh
Yogi
Dhansingh
B.R.Neetu
B.R.Neetu
Yogi
Dhansingh
Gulab singh
Dhansingh
Creative infra
Gulab singh
Dhansingh
Creative infra
BVG
B.R.Neetu
B.R.Neetu
B.R.Neetu
BVG
B.R.Neetu
B.R.Neetu
B.R.Neetu
Yogi
Gulab singh
Dhansingh
Dhansingh
Geocon
Creative infra
Dhansingh
Dhansingh
Gulab singh
Creative infra
Yogi
Yogi
B.R.Neetu
B.R.Neetu
Nakul
B.R.Neetu
B.R.Neetu
Nakul
Dhansingh
Nakul
Nakul
BVG
Nakul
Nakul
BVG
B.R.Neetu
B.R.Neetu
B.R.Neetu
B.R.Neetu
Geocon
Dhansingh
Dhansingh
B.R.Neetu
B.R.Neetu
Nakul
B.R.Neetu
B.R.Neetu
Nakul
Creative infra
Dhansingh
Yogi
Geocon
Dhansingh
Yogi
Nakul
Nakul
Geocon
Dhansingh
Yogi
RS Infra
Waymove
Nakul
B.R.Neetu
B.R.Neetu
Nakul
B.R.Neetu
B.R.Neetu
Dhansingh
Waymore
Yogi
Yogi
Yogi
Gulab singh
Sureshot
Creative infra
Bherunath
Nakul
BVG
Mahesh R Patel
Nakul
BVG
Mahesh R Patel
Geocon
Gulab singh
Creative infra
Sureshot
Sureshot
Yogi
Bharunath
B.R.Neetu
B.R.Neetu
Nakul
B.R.Neetu
B.R.Neetu
Nakul
Creative infra
Dhansingh
Creative infra
Geocon
Nakul
Nakul
Nakul
Nakul
Yogi
Yogi
Gulab singh
BVG
MMR Infra
Mahakali
B.R.Neetu
B.R.Neetu
Nakul
BVG
MMR Infra
Mahakali
B.R.Neetu
B.R.Neetu
Nakul
Yogi
RS Infra
Gulab singh
Nakul
Nakul
BVG
Nakul
Nakul
BVG
Bharunath
Geocon
B.R.Neetu
B.R.Neetu
MMR Infra
B.R.Neetu
B.R.Neetu
MMR Infra
Gulab singh
Bharunath
Creative infra
Creative infra
Waymore
Yogi
Geocon
Yogi
Nakul
Nakul
Nakul
Nakul
Gulab Singh
creative infra
Bharunath
Gulab singh
Gulab Singh
Yogi
creative infra
Yogi
Nakul
Nakul
B.R.Neetu
Jay Shree Shyam
Jay Shree Shyam
Nakul
Nakul
B.R.Neetu
Jay Shree Shyam
Jay Shree Shyam
RS Infra
Gulab singh
Creative infra
Waymore
Shivam Const.
Shivam Const.
Geocon
Gulab singh
Creative infra
Yogi
Jay Shree Shyam
Jay Shree Shyam
Nakul
Nakul
B.R.Neetu
Jay Shree Shyam
Jay Shree Shyam
Nakul
Nakul
B.R.Neetu
Yogi
Waymore
Bherunath
RS Infra
Gulab Singh
B.R.Neetu
Nakul
B.R.Neetu
Nakul
Geocon
Nakul
Nakul
B.R.Neetu
BVG
Nakul
Nakul
B.R.Neetu
BVG
Yogi
Creative infra
Yogi
Gulab singh
B.R.Neetu
Jay Shree Shyam
Jay Shree Shyam
B.R.Neetu
Jay Shree Shyam
Jay Shree Shyam
Geocon
Gulab singh
Yogi
Jay Shree Shyam
Jay Shree Shyam
Jay Shree Shyam
B.R.Neetu
B.R.Neetu
Dhan Singh
Dhan Singh
Jay Shree Shyam
Jay Shree Shyam
Jay Shree Shyam
B.R.Neetu
B.R.Neetu
Dhan Singh
Dhan Singh
Gulab singh
Yogi
Geocon
Yogi
B.R.Neetu
R.G.Infra
B.R.Neetu
R.G.Infra
RS Infra
Gulab singh
Waymore
Yogi
Yogi
BVG
Dhan Singh
B.R.Neetu
B.R.Neetu
Nakul
Nakul
BVG
Dhan Singh
B.R.Neetu
B.R.Neetu
Nakul
Nakul
B.R.Neetu
B.R.Neetu
Dhan Singh
R.G.Infra
B.R.Neetu
B.R.Neetu
Dhan Singh
R.G.Infra
BVG
BVG
B.R.Neetu
B.R.Neetu
Dhan Singh
B.R.Neetu
B.R.Neetu
Dhan Singh
B.R.Neetu
B.R.Neetu
B.R.Neetu
B.R.Neetu
Nakul
Nakul
Nakul
Shivam Const.
BVG
B.R.Neetu
B.R.Neetu
Nakul
Nakul
Nakul
Shivam Const.
BVG
BVG
Nakul
Jay Shree Shyam
Jay Shree Shyam
BVG
Nakul
Jay Shree Shyam
Jay Shree Shyam
Raj.Const
B.R.Neetu
B.R.Neetu
Jay Shree Shyam
Jay Shree Shyam
Nakul
Nakul
R.G.Infra
Mahesh R Patel
Raj.Const
B.R.Neetu
B.R.Neetu
Jay Shree Shyam
Jay Shree Shyam
Nakul
Nakul
R.G.Infra
Mahesh R Patel
Dhan Singh
Dhan Singh
Dhan Singh
R.G.Infra
Jay Shree Shyam
Jay Shree Shyam
Jay Shree Shyam
Jay Shree Shyam
Nakul
Nakul
Raj.Const
Dhan Singh
R.G.Infra
Jay Shree Shyam
Jay Shree Shyam
Jay Shree Shyam
Jay Shree Shyam
Nakul
Nakul
Raj.Const
Jay Shree Shyam
Jay Shree Shyam
Jay Shree Shyam
Jay Shree Shyam
B.R.Neetu
B.R.Neetu
B.R.Neetu
B.R.Neetu
Nakul
Jay Shree Shyam
Jay Shree Shyam
Raj.Const
Raj.Const
Raj.Const
B.R.Neetu
Jai Jamuvy Mata
Jai Jamuvy Mata
Balaji
Balaji
Dhan Singh
Dhan Singh
Mahesh R Patel
B.R.Neetu
B.R.Neetu
B.R.Neetu
B.R.Neetu
Nakul
Jay Shree Shyam
Jay Shree Shyam
Raj.Const
Raj.Const
Raj.Const
B.R.Neetu
Jai Jamuvy Mata
Jai Jamuvy Mata
Balaji
Balaji
Dhan Singh
Dhan Singh
Mahesh R Patel
Balaji
Balaji
Balaji
Jai Jamuvy Mata
Jai Jamuvy Mata
Raj.Const
Jay Shree Shyam
B.R.Neetu
B.R.Neetu
Dhan Singh
Jai Jamuvy Mata
Balaji
Balaji
Balaji
Jai Jamuvy Mata
Jai Jamuvy Mata
Raj.Const
Jay Shree Shyam
B.R.Neetu
B.R.Neetu
Dhan Singh
Jai Jamuvy Mata
RS Infra
B.R.Neetu
Mahesh R Patel
Dhan Singh
Dhan Singh
B.R.Neetu
Mahesh R Patel
Dhan Singh
Dhan Singh
Dhan Singh
Nakul
Raj.Const
B.R.Neetu
Dhan Singh
Nakul
Raj.Const
B.R.Neetu
R.G.Infra
Jay Shree Shyam
B.R.Neetu
Dhan Singh
Dhan Singh
Shivam Const.
Shivam Const.
Mahakali
R.G.Infra
Jay Shree Shyam
B.R.Neetu
Dhan Singh
Dhan Singh
Shivam Const.
Shivam Const.
Mahakali
B.R.Neetu
B.R.Neetu
Nakul
Jay Shree Shyam
Raj.Const
Raj.Const
R.G.Infra
R.G.Infra
Dhan Singh
B.R.Neetu
B.R.Neetu
Nakul
Jay Shree Shyam
Raj.Const
Raj.Const
R.G.Infra
R.G.Infra
Dhan Singh
Raj.Const
Raj.Const
Jay Shree Shyam
Jay Shree Shyam
Nakul
Nakul
B.R.Neetu
B.R.Neetu
B.R.Neetu
Dhan Singh
Dhan Singh
Shivam Const.
Raj.Const
Raj.Const
Jay Shree Shyam
Jay Shree Shyam
Nakul
Nakul
B.R.Neetu
B.R.Neetu
B.R.Neetu
Dhan Singh
Dhan Singh
Shivam Const.
Nakul
Jay Shree Shyam
B.R.Neetu
Dhan Singh
Nakul
Jay Shree Shyam
B.R.Neetu
Dhan Singh
Sureshot
Mahesh R Patel
Dhan Singh
Nakul
B.R.Neetu
Mahesh R Patel
Dhan Singh
Nakul
B.R.Neetu
Mahesh R Patel
Mahesh R Patel
Shivam Const.
Shivam Const.
Shivam Const.
Shivam Const.
Nakul
Mahesh R Patel
Dhan Singh
Shivam Const.
Shivam Const.
Shivam Const.
Shivam Const.
Nakul
Mahesh R Patel
Dhan Singh
Nakul
Jay Shree Shyam
Nakul
Jay Shree Shyam
Shivam Const.
Nakul
Shivam Const.
Nakul
Nakul
Shivam Const.
Shivam Const.
Shivam Const.
Shivam Const.
Mahesh R Patel
Nakul
Shivam Const.
Shivam Const.
Shivam Const.
Shivam Const.
Mahesh R Patel
Shivam Const.
Raj.Const
Shivam Const.
Raj.Const
Shivam Const.
Shivam Const.
Shivam Const.
Shivam Const.
BVG
BVG
BVG
BVG
BVG
BVG
Shivam Const.
Shivam Const.
Shivam Const.
Shivam Const.
Shivam Const.
Raj.Const
Jay Shree Shyam
Nakul
BVG
Shivam Const.
Raj.Const
Jay Shree Shyam
Nakul
BVG
Raj.Const
R G INFRA
Raj.Const
R G INFRA
Raj.Const
Raj.Const
Nakul
Jai shree shyam
Raj.Const
Raj.Const
Nakul
Jai shree shyam
BVG
BVG
BVG
Mahesh R Patel
BVG
Mahesh R Patel
Shivam Const.
Shivam Const.
BVG
Balaji
Balaji
vcc
Raj.Const
Raj.Const
nakul
BVG
Balaji
Balaji
vcc
Raj.Const
Raj.Const
nakul
vcc
Dhan Singh
Nakul
Mahesh R Patel
bvg
vcc
Dhan Singh
Nakul
Mahesh R Patel
bvg
Bherunath
VLC
Shiv Buildcon
Sureshot
Geocon
Geocon
Diamond
Shivam Const.
Shivam Const.
Stancy Infra
Dhan Singh
Dhan Singh
Dhan Singh
Dhan Singh
Ruhi
Yogi
VLC
Mahesh R Patel
Mahesh R Patel
Raj.Const
Raj.Const
Jay Shree Shyam
Nakul
Nakul
bvg
Raj.Const
Raj.Const
Jay Shree Shyam
Nakul
Nakul
bvg
Shivam Const.
Shivam Const.
Shivam Const.
Shivam Const.
Mahesh R Patel
Mahesh R Patel
Dhan Singh
Dhan Singh
Raj.Const
Raj.Const
Dhan Singh
Dhan Singh
Raj.Const
Raj.Const
Dhan Singh
Mahesh R Patel
Mahesh R Patel
Shivam Const.
Raj.Const
Raj.Const
Dhan Singh
Mahesh R Patel
Mahesh R Patel
Shivam Const.
Raj.Const
Raj.Const
Ashapura
Radhekrishna
Radhekrishna
UB Infra
Jai Jamuyamata
Jai Jamuyamata
Raj.Const
Raj.Const
Jay Shree Shyam
Nakul
Nakul
Shivam Const.
Dhan Singh
BVG
Raj.Const
Raj.Const
Jay Shree Shyam
Nakul
Nakul
Shivam Const.
Dhan Singh
BVG
Bherunath
Raj.Const
Raj.Const
Mahesh R Patel
Raj.Const
Raj.Const
Mahesh R Patel
Diamond
UB Infra
Creative Infra
Ashapura
Raj.Const
Raj.Const
Jai shree shyam
Nakul
Nakul
Raj.Const
Raj.Const
Mahesh R Patel
Dhan Singh
BVG
Raj.Const
Raj.Const
Jai shree shyam
Nakul
Nakul
Raj.Const
Raj.Const
Mahesh R Patel
Dhan Singh
BVG
Shiv Buildcon
UB Infra
Yogi
Dhan Singh
Jay Shree Shyam
Nakul
Nakul
Mahesh R Patel
Dhan Singh
Dhan Singh
Mahesh R Patel
Dhan Singh
Jay Shree Shyam
Nakul
Nakul
Mahesh R Patel
Dhan Singh
Dhan Singh
Mahesh R Patel
BVG
Dhan Singh
Mahesh R Patel
BVG
Dhan Singh
Mahesh R Patel
Mahesh R Patel
Shivam Const.
BVG
Mahesh R Patel
Mahesh R Patel
Shivam Const.
BVG
Mahesh R Patel
Mahesh R Patel
Dhan Singh
Dhan Singh
Nakul
Mahesh R Patel
Dhan Singh
Dhan Singh
Nakul
Nakul
Nakul
Shivam Const.
Nakul
Nakul
Shivam Const.
Mahesh R Patel
Mahesh R Patel
Mahesh R Patel
Mahesh R Patel
Mahesh R Patel
Mahesh R Patel
Nakul
Nakul
Nakul
Mahesh R Patel
Mahesh R Patel
Nakul
Nakul
Nakul
Nakul
Nakul
Nakul
Nakul
Nakul
Mahesh R Patel
Mahesh R Patel
Mahesh R Patel
Mahesh R Patel
Mahesh R Patel
Nakul
Nakul
Mahesh R Patel
Nakul
Nakul
Mahesh R Patel
Mahesh R Patel
Balaji
Jai Jamuvy Mata
Dhan Singh
Jai Jamuvy Mata
Balaji
Jai Jamuvy Mata
Dhan Singh
Jai Jamuvy Mata
Balaji
Balaji
Jai Jamuvy Mata
Jai Jamuvy Mata
Balaji
Balaji
Mahesh R Patel
Mahesh R Patel
Dhan Singh
Balaji
Balaji
Jai Jamuvy Mata
Jai Jamuvy Mata
Balaji
Balaji
Mahesh R Patel
Mahesh R Patel
Dhan Singh
Mahesh R Patel
Mahesh R Patel
Nakul
bvg
Mahesh R Patel
Mahesh R Patel
Mahesh R Patel
Nakul
bvg
Mahesh R Patel
Mahesh R Patel
Mahesh R Patel
Mahesh R Patel
Mahesh R Patel
Mahesh R Patel
Mahesh R Patel
Nakul
Mahesh R Patel
Nakul
Mahesh R Patel
Nakul
Nakul
Dhan Singh
Dhan Singh
Nakul
Nakul
Nakul
Nakul
Mahesh R Patel
Mahesh R Patel
Nakul
Nakul
Nakul
Mahesh R Patel
Mahesh R Patel
Mahesh R Patel
Mahesh R Patel
Mahesh R Patel
Mahesh R Patel
Nakul
Mahesh R Patel
Nakul
Mahesh R Patel
Mahesh R Patel
Mahesh R Patel
Geocon
Sureshot
Sureshot
Creative Infra
Geocon
Sureshot
Creative Infra
Geocon
Geocon
Creative Infra
Geocon
RS infra
Geocon
RS infra
Yogi
Geocon
Chetak
Yogi
Creative Infra
RS infra
Creative Infra
Geocon
RS infra
Yogi
RS infra
Geocon
RS infra
RS infra
Gulab Sing
Geocon
Creative Infra
Creative Infra
Geocon
Geocon
Geocon
RS infra
RS infra
SURE SHOT
STANCY INFRA
CREATIVE INFRA
ASHAPURA
MAHESH R PATEL
SURESHOT
SHIV BUILDCON
MAHESH R PATEL
MAHESH R PATEL
ASHAPURA
ASHAPURA
CEL
MAHESH
MAHESH
Diamond Construction
STANCY INFRA
Diamond Construction
Diamond Construction
R.S.INFRA
SHIV BUILDCON
Dhan Singh
Dhan Singh
BVG
Dhan Singh
Dhan Singh
Mahesh R Patel
Ashapura
Mahesh R Patel
Mahesh R Patel
Mahesh R Patel
Mahesh R Patel
Mahesh R Patel
Mahesh R Patel
Mahesh R Patel
SHIV BUILDCON
Sr.No. Date Chainage Side Structure
139 07.02.2019 471+988 Rhs HPC
140 07.02.2019 450+636 Rhs HPC
149 08.02.2019 451+320 Rhs HPC
150 08.02.2019 450+144 Rhs HPC
152 08.02.2019 450+560 Rhs HPC
161 09.02.2019 450+560 Rhs HPC
163 09.02.2019 470+164 Rhs HPC
199 12.02.2019 455+960 Rhs HPC
200 12.02.2019 470+980 Rhs HPC
226 14.02.2019 470+164 Rhs HPC
230 14.02.2019 450+144 Rhs HPC
274 18.02.2019 488+583 RHS HPC
278 19.02.2019 484+125 RHS HPC
289 21.02.2019 485+594 RHS HPC
291 21.02.2019 488+713 RHS HPC
319 23.02.2019 467+160 Rhs HPC
322 23.02.2019 488+713 Rhs HPC
353 25.02.2019 467+160 Rhs HPC
372 16.02.2019 484+125 (S/R) RHS HPC
415 28.02.2019 479+154 RHS HPC
417 28.02.2019 500+900 RHS HPC
419 28.02.2019 483+302 RHS HPC
420 01.03.2019 483+302 RHS HPC
424 01.03.2019 488+513 RHS HPC
465 05.03.2019 455+960 RHS HPC
500 08.03.2019 485+594 RHS HPC
501 08.03.2019 484+125 RHS HPC
585 11.03.2019 448+267 RHS HPC
586 12.03.2019 488+583 RHS HPC
674 16.03.2019 450+560 RHS HPC
676 16.03.2019 450+560 RHS HPC
681 17.03.2019 448+200 RHS HPC
684 18.03.2019 448+260 RHS HPC
797 01.04.2019 448+267 RHS HPC
843 03.04.2019 448+267, 44+8100 RHS HPC
1132 19.04.2019 472+980 RHS HPC
2233 20.06.2019 499734 RHS HPC
2312 22.06.2019 507040 RHS HPC
2539 28.06.2019 474+998 RHS HPC
3217 17.07.2019 474+988 RHS HPC
3275 18.07.2019 450+350 RHS HPC
3298 19.07.19 484+880 RHS HPC
3317 19.07.2019 474+988 RHS HPC
3644 27.07.2019 480+560 RHS HPC
3689 28.07.2019 478+882 RHS HPC
3702 28.07.2019 484+880 485044 RHS HPC
3757 30.07.2019 478+880 RHS HPC
3794 31.07.2019 478+880 RHS HPC
3837 02.08.2019 478+880 RHS HPC
3887 02.08.2019 480+560 RHS HPC
4019 07.08.2019 484+880 HEAD WALL RHS HPC
4169 12.08.2019 461+380 RHS HPC
4174 13.08.2019 490+290 RHS HPC
4219 17.08.2019 490+290 RHS HPC
5812 06.11.2019 488+712 Rhs HPC
5929 10.11.2019 471+355 RHS HPC
5975 12.11.2019 502+022 RHS HPC
6042 15.11.2019 488+712 Rhs HPC
6096 16.11.2019 505+800 RHS HPC
6102 16.11.2019 508+620 RHS HPC
6104 16.11.2019 501+118 RHS HPC
6124 17.11.2019 501+121 RHS HPC
6332 23.11.2019 486+288 Rhs HPC
6360 23.11.2019 501+118 RHS HPC
6450 26.11.2019 519+930 RHS HPC
6457 26.11.2019 501+118 RHS HPC
6479 27.11.2019 466+192 Rhs HPC
6560 30.11.2019 502+022 RHS HPC
6600 02.12.2019 486+288 RHS HPC
6628 03.12.2019 486+288 RHS HPC
6636 04.12.2019 485+044 RHS HPC
6743 06.12.2019 485+044 RHS HPC
6829 09.12.2019 497+680 497690 RHS HPC
6831 09.12.2019 497+680 497690 RHS HPC
6880 10.12.2019 497+150 497158 RHS HPC
6941 12.12.2019 483+813 RHS HPC
6985 13.12.2019 501+650 RHS HPC
7053 17.12.2019 450+300 RHS HPC
7072 18.12.2019 450+300 RHS HPC
7081 19.12.2019 450300 RHS HPC
7363 30.12.2019 486+288 RHS HPC
7445 21.12.2019 495+354 RHS HPC
7461 30.12.2019 495+354 RHS HPC
7589 31.12.2019 448+267 RHS HPC
7604 31.12.2019 448+267 RHS HPC
7761 03.01.2020 483+820 RHS HPC
7817 06.01.2020 448+267 RHS HPC
7830 07.01.2020 448+279 RHS HPC
7888 12.01.2020 461+380 RHS HPC
8106 01.02.2020 450+565 RHS HPC
8156 19.02.2020 457+687 RHS HPC
8161 20.02.2020 452+687 RHS HPC
8172 21.02.2020 452+687 RHS HPC
8175 22.02.2020 452+687 RHS HPC
8217 02.03.2020 461+380 RHS HPC
8275 20.03.2020 461+380 RHS HPC
8282 21.03.2020 461+380 RHS HPC
8302 23.03.2020 461+380 RHS HPC
8466 23.05.2020 451+900 RHS HPC
8468 24.05.2020 451+900 RHS HPC
8476 25.05.2020 451+900 RHS HPC
8505 29.05.2020 453+120 Rhs HPC
8508 29.05.2020 451+900 Rhs HPC
8533 01.06.2020 453+120 Rhs HPC
8544 02.06.2020 453+120 Rhs HPC
8549 03.06.2020 453+120 Rhs HPC
Part of Structure Grade Qty. Contractor
HPC head wall 1st M20 5 Gulab Singh
HPC head wall 3rd M20 3 Riddhi
HPC head wall 3rd M20 4 Riddhi
HPC head wall 3rd M20 3 Riddhi
HPC head wall 1st M20 3 Riddhi
HPC head wall 2nd M20 6 Riddhi
HPC head wall 2nd M20 6 Gulab Singh
Pipe incasing M20 28 Riddhi
HPC head wall 3rd M20 2 Gulab Singh
HPC head wall 3rd M20 2 Gulab Singh
HPC head wall 2nd M20 4 Riddhi
Pipe bad pcc M20 3 AB buildcon
H.P.C Pipe incasing M20 3 Ambika
Hard wall 1st lift M20 5.5 AB buildcon
Head wall 1st lift M20 6 AB buildcon
HPC head wall 2nd M20 6 Gulab Singh
HPC M20 6 Ambika
HPC headwall final lift M25 2 Gulab Singh
H.P.C Pipe incasing M20 5 Ambika
H.P.C HW final lift M20 2 H.K Cons.
Pipe bad pcc M20 5 Umiersat
Pipe incasing M20 5.5 Ambika
Pipe incusting M20 5.5 Ambika
Pipe incusting M20 31 AB Buildcon
head wall 1st M20 6.00 Riddhi
H.W 2ND WALL M20 6 AB Buildcon
HW 3RD WALL M20 4.5 Ambika
Hpc pipe incasingh M20 2.50 Riddhi
h.W 3ND WALL M20 2.5 AB Buildcon
HPC- headwall 2nd lift M20 5.00 Riddhi
HPC- head wall final lift M20 1.00 Riddhi
HPC- headwall 1st lift M20 5.50 Riddhi
HPC Bed pcc M20 8.00 Riddhi
Pipe incasing M20 36 Ridhi
HPC headwall final lift M20 3 Ridhi
Headwall 3rd M20 2 Gulab Singh
HEAD WALL 3RD LIFT M-20 6
PIPE BED PCC M-15 2.5
HPC PIPE BED 20 5 RUHI
Head wall 2nd M20 20 RUHI
HPC M20 11 Yogi
PIPE BED & HPC HEAD WALL PCC M-15 6
HPC M20 13 Rahi
HPC M15 18 BALAJI
HPC M20 4 Staty
HPC HEAD WALL 1ST LIFT M-20 4
HEAD WALL 2ND LIFT M-20 6
PIPE ENCASING M-20 4
PIPE ENCASING M-20 5
HPC head wall 1st lift M20 5 Balaji
M-20 6
HPC PCC M15 6 Ruhi
PIPE ENCASING M-20 24
HEAD WALL M-20 3
pipe colvert M20 2 Ashapura
pipe gacasing M20 5 Ambika
HPC HEAD WALL FINAL LIFT M-20 6
HPC HLL M20 2 Ashapura
HEAD WALL 1ST LIFT M-20 6.5
HEAD WALL 1ST LIFT M-20 2
PIPE CULVERT PCC M-20 14.5
HEAD WALL 1ST LIFT M-2 3
pipe colvert M20 8 Ashapura
PIPE ENCASING M-20 40
PIPE ENCASING M-20 13
HPC HEADWALL 2ND LIFT M-20 3
PIP pcc M15 12 yogi
PIPE ENCASING M-20 20.5
HPC M20 6 Ashapurcon
HPC Pcc M20 7 Ashapurcon
HPC WALL M-25 2.5
HPC wall M20 6 Bhenmwh
PIPE ENCASING M-20 6
PIPE ENCASING M-20 7.5
PIPE ENCASING M-20 6
HPC BED PCC M-15 6.5
HPC HEAD WALL M-20 5
Pipe Calwnt pcc M15 6 Yogi
Pipe Calwnt pcc M20 7 Yogi
PIPe Calwnt Head Wall 2nd list M20 2 Yogi
HPC HEAD WALL M-25 11
PIPE ENCASING M-20 6.00
HPC ENCASING M-20 6.00
PIPE CULVET M15 4 Departmentel
PIPE CULVET M15 4 NIRAJ
Head wall M20 25 MAYANK
PIPE Increchin M20 18 NIRAJ
PIPE Increchin M20 13 NIRAJ
PIPE Encasing M20 19.5 PATIL
H/W 3rd lift M15 1.5 NIRAJ
H/W 2nd lift M20 3.5 SONU
ENCASTING M20 10 SONU
ENCASTING M20 4.5 SONU
HED WALL Final lift M20 2 SONU
PIPE M20 13 PANDY
WALL 1ST LIFT M20 8.5 PATIL
ENCASING M20 6 PATIL
H/W 3RD LIFT M20 3 PATIL
HPC bed pcc M15 3 Pandey
Head wall 1st lift M20 18.5 Pandey
Head wall 2nd lift M20 8 Patil
Head wall 1st lift M20 6 Patil
Head wall 3rd lift M20 2.5 Patil
Head wall 2nd lift M20 18 Pandey
Head wall 2nd lift M20 7.5 Patil
Head wall 3rd lift M20 1.5 Pandey
Remarks
Departmentel
SHIV BUILD.
DHAN SING
DHAN SING
DHAN SING
DHAN SING
DHAN SING
DHAN SING
DHAN SING
DHAN SING
DHAN SING
DHAN SING
DHAN SING
DHAN SING
Dhansingh
Dhansingh
Dhansingh
Dhansingh
Dhansingh
Dhansingh
Dhansingh
Dhansingh