Notification-2019 01 17

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 12

jftLVªh laö Mhö ,yö&33004@99 REGD. NO. D. L.

-33004/99

vlk/kj.k
EXTRAORDINARY
Hkkx II—[k.M 3—mi&[k.M (ii)
PART II—Section 3—Sub-section (ii)
izkf/dkj ls izdkf'kr
PUBLISHED BY AUTHORITY
la- 241] ubZ fnYyh] c``gLifrokj] tuojh 17] 2019@ikS"k 27] 1940
No. 241] NEW DELHI, THURSDAY, JANUARY 17, 2019/PAUSHA 27, 1940

पयावरण, वन और जलवायु परवतन मं ालय


अिधसूचना

नई दली, 17 जनवरी, 2019

345(अ).—भारत सरकार,
का.आ. 345(अ पया वरण (सरं ण) अिधिनयम,1986 क धारा 3 क उप-धारा (1) और

उप-धारा (2) के खंड (फ) के अधीन अपनी शिय का योग करते ए, तकालीन पया वरण और वन मंालय क

सं. का.आ.1533(अ), तारीख 14 िसतंबर, 2006 ारा कािशत पया वरण समाघात िनधा रण अिधसूचना (इसके प"ात् इसे

ई.आइ.ए अिधसूचना कहा जाएगा) म$, उ अिधसूचना क अनुसूची म$ सूचीब) सभी नई प*रयोजना,/-याकलाप,

यथाि/थित उनके िव/तार और आधुिनककरण और/या उपाद िम2ण म$ प*रवत न के िलए, प*रयोजना बंधन ारा भूिम को

सुरित करने के िसवाय कसी संिनमा ण काय या भूिम तैयार करने से पहले संबंिधत िविनयमन ािधकरण से पूव पया वरण

िनबा धन क आव3यकता को आ4ापक बनाती है ।

और 5(छ) के अधीन उ अिधसूचना क अनुसूची म$ सूचीब) प*रयोजना, या -याकलाप म$ िडि/टलरी (शीरा

और गैर शीरा आधा*रत) सि7मिलत है, और यथाि/थित िविभ9 रा:य या संघ रा:य े म$ मंालय या रा:य पया वरण

समघात िनधा रण ािधकरण से पूव पया वरण िनबा धन क आव3यकता है;

और, के<= सरकार ने जैिवक >धन पर रा? नीित, 2018 कािशत क है िजसम$ पे@ोल के साथ इथेनॉल AलBCडंग

(ईबीपी) काय -म को उसका मुDय घटक के Eप म$ अनुब) कया है, /वदेशी और गैर-दूषणकारी अय ऊजा Iोत को

/तािवत कया है और काय -म का सफलता-पूव क प*रपालन न िसफ वायु दूषण को बत कम करने म$ क<तु आयात

ित/थापन ारा बमूय िवदेशी मु=ा भी बचाने म$ भावी होगा ।

और, पे@ोल के साथ इथेनोल Aल$िडग (ईबीपी) काय -म के अधीन पे@ोल के साथ Aल$ड करने के उKे3य से बायो-

इथेनॉल के िविनमा ण क प*रयोजना, म$ तेजी लाने के िलए, पया वरण, वन और जलवायु प*रवत न मंालय पया वरण

िनबा धन को आव3यक मानता है;

357 GI/2019 (1)


2 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]

और िडि/टलरी से संबि
ं धत पूव पया वरण िनबा धन के मामल म$ ाL पया L अनुभव के आधार पर, पया वरण

िनबा धन देने क शतM मानककृत कया गया है;

और, जीरो िलOड िड/चाज िनयम का पालन कर रही िडि/टलरी एकक आस-पास के पया वरण के संबंध म$ उिचत

सुरा दान कर$ ;

और, पया L पानी क उपलAधता वाले े म$ जीरो िलOड िड/चाज का पालन कर रहQ िडि/टलरी को एक वष के

िलए पया वरण म$ ितकूल भाव डाले िबना उपयु


/थािपत लRय को ाL करने क दृिS से एक वष के िलए िवशेष छूट

दान क जा सकती है ।

अतः, अब, क$=ीय सरकार, पया वरण (संरण) िनयम, 1986 के िनयम 5 के उपिनयम (4) के साथ प*ठत पया वरण

(संरण) अिधिनयम, 1986 (1986 का 29) क धारा 3 क उपधारा (1) और उपधारा (2) के खंड (फ) ारा दU शिय

का योग करते ए, लोक िहत म$ उ िनयम के िनयम 5 के उप िनयम (3) के खंड (क) के अधीन नो*टस क आव3यकता,

को पूरा करने के प"ात्, अन<य Eप से जैिवक >धन के Eप म$ योग के िलए पे@ोल के साथ Aल$Cडंग के सीिमत उKे3य के िलए

इथेनॉल के उपादन म$ तेजी लाने के िलए िवशेष ावधान बनाती है, अथा त्:-

''(1) चीनी उपादन या िडि/टलरी क सभी िव/ता*रत प*रयोजनाएं, जो पे@ोल के साथ इथेनॉल Aल$Cडंग (ईबीपी)

काय -म के अधीन उनके वत मान औWोिगक प*रचालन और पे@ोल के साथ Aल$Cडंग करने के िलए आशियत इथेनॉल उपादन

करने के िलए पया वरण िनबा धन रखती है, पया वरण बंधन योजना, भारत सरकार, पे@ोिलयम और ाकृितक गैस मंालय

के माण-प के साथ ईआईए अिधसूचना, 2006 के अनुबध-1 म$ दए गए Eप-1 म$ यह बताते ए एक आवेदन करे गी क,

यह /ताव पे@ोल के साथ बायो-इथेनॉल Aल$Cडंग के योजन के िलए ईआईए अिधसूचना, 2006 के ावधान के अधीन

पया वरण िनबा धन ाL करने हेतु है और ऐसे सभी आवेदन पर संबंिधत ेीय िवशेष4 मूयांकन सिमित और रा:य िवशेष4

मूयांकन सिमित ारा िवचार कया जाएगा, जो पानी क पया L उपलAधता और िडि/टलरी से संबंिधत मानक शतM के पालन

के िवषय म$ के<=ीय भू जलबोड के माण-प पर आधा*रत, ईआईए अिधसूचना, 2006 म$ िविनXद S वग बी 2 को लागू

-या अनुसार /ताव का मूयांकन करे गी (अनुबंध)।

(2) िवशेष4 मूयांकन सिमित इस अिधसूचना के अनुबंध म$ दी गई मानक पया वरण िनबा धन क शतM के अित*र

अलग अलग मामल के अनुसार िविशS शतY िनधा *रत कर सकेगी।''

यह अिधसूचना, राजप म$ इस अिधसूचना के काशन क तारीख से एक वष क अविध के िलए वृU रहेगी ।

[फा. सं. आईए-जे-11013/55/2017-आईए. II(I)]

गीता मेनन, संयु सिचव

परिशट
पयावरण वीकृित क मानक शत
I. सांिविधक शत
i. प*रयोजना म$ वनेतर योजन हेतु वन भूिम के अपवत न के संिल[त होने के मामले म$, प*रयोजना /तावक

ारा वन संरण (अिधिनयम), 1986 के उपबंध के अंतग त वन /वीकृित ा[त क जाएगी।

ii. प*रयोजना /तावक ारा रा_@ीय व<यजीव बोड से, यद लागू हो, /वीकृित ा[त क जाएगी।

iii. प*रयोजना /तावक ारा एक /थल-िविश_ट संरण योजना एवं व<यजीव बंधन योजना तैयार क

जाएगी जो मुDय व<यजीव वाड न ारा अनुमोदत होगा। अनुमोदत /थल-िविश_ट संरण

योजना/व<यजीव बंधन योजना क िसफा*रश$ रा:य वन िवभाग के परामश से काया ि<वत क जाएगी।
¹Hkkx IIµ[k.M 3(ii)º Hkkjr dk jkti=k % vlk/kj.k 3

काया <वयन *रपोट , छमाही अनुपालन *रपोट के साथ /तुत क जाएगी (अcययन े म$ अनुसूची-I क

जाितय क उपि/थित के मामले म$)।

iv. प*रयोजना /तावक ारा संबंिधत रा:य दूषण िनयंण बोड /सिमित से वायु (दूषण िनवारण तथा

िनयंण) अिधिनयम, 1981 और जल (दूषण िनवारण तथा िनयंण) अिधिनयम, 1974 के उपबंध के

अंतग त /थापना/चालन क अनुमित ा[त क जाएगी।

v. प*रयोजना /तावक ारा समय-समय पर यथासंशोिधत खतरनाक और अ<य अपिश_ट बंधन िनयम,

2016 के अंतग त ािधकार ा[त कया जाएगा।

vi. कंपनी ारा समय-समय पर यथा संशोिधत प*रसंकटमय रसायन का उपादन, भंडारण और आयात

(एमएसआइएचसी) िनयम, 1989 के अंतग त िनयम तथा दशािनदhश का कड़ाई से अनुपालन कया

जाएगा। खतरनाक रसायन का सभी प*रवहन काय कलाप मोटर वाहन अिधिनयम (एमवीए), 1989 के

अनुसार कया जाएगा।

II. वायु गुणवता िनगरानी और पररण


i. प*रयोजना /तावक ारा पया वरण (संरण) िनयम, 1986 म$ िनधा *रत मानक के संदभ म$ /टैक उसज न

क िनगरानी के िलए -या /टैक म$ 24x7 िनरं तर उसज न िनगरानी णाली सं/थािपत क जाएगी और

यह रा:य दूषण िनयंण बोड तथा क$=ीय दूषण िनयंण बोड के ऑन लाइन सव र से जुड़ी होगी तथा

पया वरण (संरण) अिधिनयम, 1986 के अंतग त मा<यता ा[त योगशाला, अथवा एनएबीएल से

यायोिजत योगशाला, के माcयम से उपकरण आपूmत क ता क िविशि_टय के अनुसार इन णािलय

को कैलीnेट करे गी।

ii. प*रयोजना /तावक संयं े के अ<दर और बाहर कम से कम चार /थान पर (येक 1200 के कोण पर

एक संयं े के अ<दर और तीन बाहर), पवन क ओर तथा पवन के िवपरीत दशा, को शािमल करके

(मामला-दर-मामला आधार पर : ह/तचािलत; बड़े संयं : िनरं तर) उसmज त होने वाले मुDय दूषक

(अथा त् पीएम उसज न के संदभ म$ पीएम10 तथा पीएम2.5, और एसओ2 एवं एनओ X उसज न के संदभ म$)

ं धत सामा<य/मानदंड के पैरामीटर को प*रवेशी वायु गुणवता क िनगरानी करने के िलए णाली


से संबि

सं/थािपत करे गा।

iii. प*रयोजना /तावक िनरं तर /टै क उसज न तथा वायु गुणवता िनगरानी क मािसक *रपोट /तुत करे गा

और वायु गुणवता/अ/थायी उसज न क ह/तचािलत /टैक िनगरानी और ह/तचािलत िनगरानी के

प*रणाम को छमाही िनगरानी *रपोट के साथ पया वरण, वन और जलवायु प*रवत न मंालय के ेीय

काया लय, के<=ीय दूषण िनयंण बोड के आंचिलक काया लय और रा:य दूषण िनयंण बोड के ेीय

काया लय को भेजा जाएगा।

iv. सभी वण े से धूल सिहत धूल उप<न करने वाले सभी /थान के िलए समुिचत वायु दूषण िनयंण

(एपीसी) णाली उपलAध कराई जाएगी ताक िनधा *रत /टै क उसज न और अ/थायी उसज न मानक का

अनुपालन हो सके।

v. मंालय ारा सा.का.िन.सं. 826 (अ) दनांक 16 नव7बर, 2009 के ारा जारी कए रा_@ीय प*रवेशी

वायु गुणवता उसज न मानक का अनुपालन कया जाएगा।


4 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]

vi. िविवrत उसज न को अनुमेय सीमा, (यथा यो:य) िनयंित करने के िलए कोयला चािलत बॉयलर म$

योग हेतु कोयले म$ सफर का अंश 0.5% से अिधक नहQ होना चािहए। गैसीय उसज न को के<=ीय

दूषण िनयंण बोड /रा:य दूषण िनयंण बोड के दशािनदhश के अनुसार पया [त ऊंचाई के /टैक के

माध्यम से िवेिपत कया जाएगा।

vii. डीजी सैट को उपयुrत दूषण िनयंण यं तथा पया [त /टै क ऊंचाई से युrत कया जाएगा ताक इनसे

होने वाला उसज न वत मान िविनयम तथा इस संबंध म$ दशािनदhश के अनुEप हो।

viii. कtची सामिuय, कोयले इत्याद का भंडारण िमvी अथवा ढंके े म$ कया जाएगा ताक धूल से होने

वाले दूषण और अ<य अ/थायी उसज न को रोका जा सके।

III.
III. जल गुणवता क िनगरानी और पररण
i. बिहxाव क ऑनलाइन िनरं तर िनगरानी के िलए, इकाई ारा प*रसर के अंदर बिहxाव वािहत करने

वाले चैनल/नाल म$ राि दृ3यता मता वाला वेब कैमरा लगाया जाएगा (जेडएलडी ा[त करने वाली

प*रयोजना, के मामले म$ लागू) और इसे एसपीसीबी एवं सीपीसीबी के सव र से जोड़ा जाएगा।

ii. शू<य तरल िन/सारण सुिनि"त कया जाएगा और प*रसर के बाहर कोई अपिश_ट/शोिधत जल वािहत

नहQ कया जाएगा (जेडएलडी ा[त करने वाली प*रयोजना, के मामले म$ लागू)

iii. -या बिहxाव/कसी अपिश_ट जल को /टा म जल से नहQ िमलने दया जाएगा। प*रसर से /टाम जल को

एकित कया जाएगा और एक पृथक प*रवहन णाली के माcयम से िन/ता*रत कया जाएगा।

iv. वायु/जल अिधिनयम के तहत अनुमित दान करते समय, पया वरण (संरण) िनयम, 1986 के तहत

िविनXद _ट मानक अथवा रा:य दूषण िनयंण बोड ारा यथा िविनXद _ट मानक, जो भी अिधक कड़े ह,

के अनुसार बिह:xाव का िन/सारण कया जाएगा।

v. सम/त ताजे जल क आव3यकता, /तािवत माा अथवा सिमित ारा यथा िनधा *रत माा से अिधक नहQ

होगी। इस संबंध म$ संबिं धत िविनयामक ािधकरण/सीजीडAयूए से पूवा नुमित ा[त क जाएगी।

vi. औWोिगक/yयापार बिह:xाव को उtच सीओडी/टीडीएस और िन7न सीओडी/टीडीएस बिह:xाव धारा, म$

पृथrकृत कया जाएगा। उtच टीडीएस/सीओडी को ि/@पर के बाद एमईई और एटीएफडी (एिजटे*टड िथन

फम zायर) क -या से गुजारा जाएगा। िन7न टीडीएस धारा को ईटीपी म$ शोिधत कया जाएगा और

उसके बाद आरई णाली से गुजारा जाएगा।

vii. क7पनी, भू-जल पुनभ रण के िलए भवन के Eफ टॉप और बरसाती पानी के नाल से वषा जल संचयन

करे गी तथा संयं के अंदर ही िविभ<न औWोिगक चालन के िलए इसका उपयोग करे गी।

IV. विन िनगरानी और िनवारण


i. cविन दूषण को िनयंित करने के िलए डीजी सेट म$ एकोि/टक एनrलोसर लगाए जाएंग।

ii. संयं े म$ और उसके आस-पास सम/त cविन /तर को, cविन उसज न के सभी xोत पर एरोि/टक {ड,

साइले<स र, ए<rलोज़र आद सिहत cविन िनयंण यं लगाकर मानक के अंदर भली-भांित रखा जाएगा।

iii. प*रवेशी cविन /तर, ई(पी)ए िनयम, 1986 के अंतग त िविनXद _ट मानक अथा त दन के समय 75 dB(A)

और रात के समय 70 dB(A) होने चािहए।

V. ऊजा संरण उपाय


i. काश-yयव/था योजन हेतु ऊजा के xोत, अिधमानत: एलईडी आधा*रत हगे।
¹Hkkx IIµ[k.M 3(ii)º Hkkjr dk jkti=k % vlk/kj.k 5

VI. अपिशट %बंधन


i. खतरनाक रसायन को टBक, टBक फाम , zम, कारबॉय आद म$ रखा जाएगा। प7प के माcयम से टBक फाम

और साव$ट @ांसफर पर लेम अरे /टर लगाए जाएंगे।

ii. सं/करण उपरांत जैिवक अविश_ट और /प$ट काब न, यद कोई हो, को सीम$ट उWोग म$ भेजा जाएगा।

ईटीपी /लज, सं/करण से उप<न अजैिवक और वा_पीकरण नमक का टीएसडीएफ म$ िनपटान कया

जाएगा।

iii. क7पनी, अपिश_ट <यूनीकरण उपाय िन7नानुस ार करे गी :-

क. अपिश_ट के <यूनीकरण हेतु स-य संघटक क माा, का मापन और िनयंण।

ख. सं/करण से ा[त लघु-उपाद का, अ<य -या, म$ कtची सामिuय अथवा कtची सामिuय

के ित/थापन के तौर पर पुनउ पयोग।

ग. छलकाव को <यूनतम करने के िलए /वचािलत भराई का उपयोग।

घ. बैच *रएrटर म$ rलोज फड िस/टम का उपयोग।

ङ. वा_प पुना िL णाली के माcयम से िनकासी उपकरण।

च. अपिश_ट जल उसज न को कम करने के िलए उपकरण क सफाई हेतु उtच दबाव क निलय का

उपयोग।

VII. हरत प(ी


i. सीपीसीबी ारा जारी दशा-िनदhश के अनुसरण म$ देशज वृ जाितय के साथ संय
ं े के 33% भाग

के समान े म$ ह*रत पvी िवकिसत क जाएगी। इस ह*रत पvी म$, अ<य के साथ-साथ, संयं क सम/त

प*रिध शािमल होगी।

VIII. सुरा, जन सुनवाई और मानव वा


वा*य संबध
ं ी मु+े
i. खतरे क पहचान और जोिखम आकलन (एचआईआरए) और आपदा बंधन योजना के आधार पर

आपातकालीन तपरता योजना -याि<वत क जाएगी।

ii. प*रयोजना /तावक, कारखाना अिधिनयम के मानदƒड के अनुसार yयिगत सुरा उपकरण (पीपीई)

उपलAध कराएंगे।

iii. रसायन हथालन से सुरा और संबंिधत /वा/„य पहलु, के बारे म$ सभी कम चा*रय को िशण दान

कया जाएगा। सभी कम चा*रय क िनयिमत आधार पर पूव-


रोज़गार और नेमी आविधक िचकसा जांच

कराई जाएगी। रसायन के हथालन के बारे म$ सभी कम चा*रय को िशण दया जाएगा।

iv. सभी आव3यक अवसंरचना और सुिवधा,, जैसे क खाना पकाने के >धन, मोबाइल टॉयलेट, मोबाइल

एसटीपी, सुरित पेयजल, िचकसा /वा/„य देखभाल, -ेच आद से युrत /थल के अंदर ही िनमा ण काय म$

लगे मज़दूर के िलए आवास क yयव/था क जाएगी। यह आवास-yयव/था, अ/थायी संरचना, के Eप म$

हो सकती है िजसे प*रयोजना पूण होने के बाद हटा दया जाएगा।

v. कामगार क yयावसाियक /वा/„य क िनगरानी, िनयिमत आधार पर क जाएगी और कारखाना

अिधिनयम के अनुसार अिभलेख का रखरखाव कया जाएगा


6 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]

vi. कtचे माल और तैयार उपाद क ढु लाई करने वाले वाहन क पा…क†ग के िलए संयं प*रसर के अंदर

पया [त /थान िनधा *रत कया जाएगा तथा साव जिनक /थल पर बाहर पा…क† ग क अनुमित नहQ दी

जाएगी।

IX. कारपोरे ट पयावरण उतरदािय


तरदाियव
i. प*रयोजना /तावक, कारपोरे ट पया वरण उतरदाियव के संबंध म$ इस मंालय के का.4ा. फा. सं. 22-

56/2017-आइए- III दनांक 1 मई, 2018 म$ अ<तmव _ट उपबंध का, यथा यो:य, अनुपालन करे गा।

ii. क7पनी क, िनदेशक मंडल ारा उिचत Eप से अनुमोदत एक सुिनधा *रत पया वरणीय नीित होगी।

पया वरणीय नीित म$ उिचत रोकथाम और संतुलन बनाए रखने तथा पया वरणीय/वन/व<यजीव

मापदƒड/शतM के कसी अित-मण/िवपथन/उलंघन पर cयान केि<=त करने के िलए मानक चालन

-यािविधय को िविहत कया जाना चािहए। क7पनी क पया वरणीय /वन संबंधी /व<यजीव संबंधी

मानक/शतM और/या शेयर धारक/िहतधारक के अित-मण/िवपथन/उलंघन क सूचना देने क

सुप*रभािषत yयव/था होनी चािहए। इस संबंध म$ बोड संकप क ित पया वरण, वन और जलवायु

प*रवत न मंालय को छमाही *रपोट के भाग के Eप म$ भेजी जाएगी।

iii. प*रयोजना और क7पनी मुDयालय, दोन के /तर पर व*र_ठ अिधकारी जो सीधे संगठन के मुख को सूिचत

करे गा क िनयंण के अधीन एक अलग पया वरणीय को_ठ /थािपत कया जाएगा िजसम$ अह ता ा[त

कम चारी हो।

iv. क7पनी क उतरदाियव योजना सिहत ईएमपी और पया वरणीय शतM के काया <वयन क काय योजना

तैयार क जाएगी और उसे सम ािधकारी ारा अनुमोदत कया जाएगा। पया वरणीय संरण उपाय के

िलए िनधा *रत वष वार िनिधय को अलग खाते म$ रखा जाएगा और उसे कसी अ<य योजन के िलए

अपवmत त नहQ कया जाएगा। काय योजना के काया <वयन क वष वार गित क *रपोट , छमाही अनुपालन

*रपोट सिहत मंालय/ेीय काया लय को भेजी जाएगी।

v. ितवष /वयं-पया वरणीय लेखापरीा क जाएगी। ित तीन वष के प3चात तृतीय पकार से पया वरणीय

लेखापरीा कराई जाएगी।

X. %कण
i. प*रयोजना /तावक सात दन के भीतर िजले या रा:य के दो /थानीय समाचार प म$ अपने खचh पर

मुख Eप से इसका िव4ापन देकर िजनम$ से एक देशीय भाषा म$ होगा, पया वरणीय शतM और सुरापाय

सिहत अपनी प*रयोजना के िलए दत पया वरणीय /वीकृित क साव जिनक Eप से सूचना देगा और इसके

साथ-साथ इसे प*रयोजना /तावक क वेबसाइट पर /थाई Eप से दmश त कया जाएगा।

ii. प*रयोजना /तावक ारा पया वरणीय /वीकृित क ितयां मंालय के संबिं धत काया लय के साथ-साथ

/थानीय िनकाय, पंचायत और नगरीय िनकाय के मुख को /तुत क जाएगी और उ<ह$ इसे ा[त होने

क तारीख से 30 दन तक इसे दmश त करना है।

iii. प*रयोजना /तावक पया वरणीय /वीकृित म$ िनधा *रत शतM के अनुपालन क ि/थित, िनगरानी कये गए

आंकड़ के प*रणाम सिहत अपनी वेबसाइट पर अपलोड करे गा और उसे छमाही आधार पर अWितत करे गा।

iv. प*रयोजना /तावक प*रयोजना, के िलए संकेितत मानदƒड दूषक /तर नामत:; PM10, SO2, NOx

(प*रवेशी /तर और समूह उसज न संबंधी) या अित गंभ ीर सेr टोरल मापदƒड क िनगरानी करे गा और

उसे आम जनता क जानकारी के िलए एक सुिवधाजनक /थान पर दmश त करे गा और क7पनी क वेबसाइट

पर /तुत करे गा।


¹Hkkx IIµ[k.M 3(ii)º Hkkjr dk jkti=k % vlk/kj.k 7

v. प*रयोजना /तावक, िनधा *रत पया वरणीय शतM के अनुपालन क ि/थित के संबंध म$ छमाही *रपोट

पया वरण, वन और जलवायु प*रवत न मंालय क वेबसाइट पर पया वरणीय /वीकृित के पोट ल पर /तुत

करे गा।

vi. प*रयोजना /तावक येक िवतीय वष के िलए पया वरणीय िववरण पया वरण (संरण) िनयम, 1986 के

अधीन यथा िविहत तथा बाद म$ यथा संशोिधत Eप म$ प-V म$ संबि


ं धत रा:य दूषण िनयंण बोड को

/तुत करे गा और कंपनी क वेबसाइट पर डालेगा।

vii. प*रयोजना /तावक, भूिम के िवकास काय क शुEआत और प*रयोजना ारा उपादन काय क शुEआत

से लेकर िवतीय प*रसमापन और संबि


ं धत ािधका*रय ारा प*रयोजना के अंितम अनुमोदन क तारीख

क सूचना ेीय काया लय और मंालय को भी देगा।

viii. प*रयोजना /तावक को रा:य दूषण िनयंण बोड और रा:य सरकार ारा लगाई शतM का कड़ाई से

पालन करना होगा।

ix. प*रयोजना /तावक ईआईए/ईएमपी *रपोट , म$ क गई ितब)ता, और िसफा*रश, जन सुनवाई के

दौरान और िवशेष4 मूयांकन सिमित (ईएसी) के सम दए गए /तुितकरण के दौरान दए गए सभी

वचन का पालन करे गा।

x. पया वरण, वन और जलवायु प*रवत न मंालय क पूव /वीकृित के िबना संयं म$ और कोई िव/तार या

सुधार नहQ कए जाएंगे।

xi. त„यामक आंकड़ को छुपाने या झूठे/बनावटी आंकड़े /तुत करने पर इस पया वरणीय /वीकृित को रK

कया जा सकता है और पया वरण (संरण) अिधिनयम, 1986 के उपबंध के अधीन कार वाई क जा सकती

है।

xii. यद उपयु rत शतM म$ से कसी का भी काया <वयन संतोषजनक नहQ होता है तो मंालय /वीकृित को रK या

िनलि7बत कर सकता है।

xiii. यद आव3यक पाया गया, तो मंालय अित*रrत शतY िनधा *रत करने का अिधकार सुरित रखता है।

कंपनी समयब) रीित से इन शतM को -याि<वत करे गी।

xiv. इस मंालय का ेीय काया लय िनधा *रत शतM के अनुपालन क िनगरानी करे गा। प*रयोजना के

ािधकारीगण को चािहए क वे अपेित आंकड़/जानकारी/िनगरानी *रपोट /तुत करते ए ेीय

काया लय के अिधकारी को पूरा सहयोग द$।

xv. उपयु rत शतM को, जल (दूषण का िनवारण और िनयंण) अिधिनयम, 1974 वायु (दूषण का िनवारण

और िनयंण) अिधिनयम, 1981, पया वरण (संरण) अिधिनयम, 1986 खतरनाक तथा अ<य अपिश_ट

(बंधन तथा सीमा पार संचलन) िनयम, 2016 और लोक दाियव बीमा अिधिनयम, 1991, उनके

संशोधन और िनयम तथा भारत के माननीय सव‡tच <यायालय/उtच <यायालय तथा िवषय व/तु से

संबंिधत कसी अ<य िविध <यायालय ारा पा*रत क<ही अ<य आदेश के ावधान सिहत लागू कया

जाएगा।

xvi. इस ईसी के िवˆ) अपील यद कोई हो, रा_@ीय ह*रत अिधकरण अिधिनयम, 2010 क धारा 16 के अधीन

यथा िविहत, 30 दन क अविध के भीतर, रा_@ीय ह*रत अिधकरण को क जाएगी।


8 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]

MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE


NOTIFICATION
New Delhi, the 17th January, 2019
S.O. 345(E).—WHEREAS, the Central Government in the erstwhile Ministry of Environment and Forests, in
exercise of its powers under sub-section (1) and clause (v) of sub-section (2) of section (3) of the Environment
(Protection) Act, 1986 has published the Environment Impact Assessment Notification, 2006 (hereinafter referred to as
the EIA Notification) vide S.O.1533(E), dated the 14th September, 2006, making the requirement of prior environmental
clearance from the concerned regulatory authority mandatory for all new projects/activities listed in the schedule to the
said notification, their expansion and modernization and/or change in product mix, as the case may be, before any
construction work or preparation of land by the project management except for securing the land;
AND WHEREAS, the projects/activities listed in the schedule to the said notification include distilleries
(molasses and non-molasses based) under item 5(g), and thus requiring prior environmental clearance from the Ministry
or the State Environment Impact Assessment Authorities in different States/Union Territory, as the case may be;
AND WHEREAS, the Central Government has published the National Policy on Bio-fuels, 2018 stipulating
Ethanol Blended with Petrol (EBP) Programme as its main component, offering indigenous and non-polluting renewable
energy source and successful implementation of the programme would not only result in substantial reduction in air
pollution but also saving of precious foreign exchange through import substitutions;
AND WHEREAS, the Ministry of Environment, Forest and Climate Change deems it necessary for expediting
environmental clearances to the projects for manufacturing of bio-ethanol for the purpose of blending with the petrol
under the Ethanol Blended with Petrol (EBP) Programme;
AND WHEREAS, based on substantial experience gained in matters relating to prior environmental clearance
related to distilleries, conditions of grant of environmental clearance have been standardized;
AND WHEREAS, distillery units adhering to Zero Liquid Discharge norms provide reasonable safeguard with
respect to ambient environment;
AND WHEREAS, distilleries adhering to Zero Liquid Discharge in areas with adequate water availability can
be provided special dispensation for a year with view to achieving objective set as above without adverse environmental
impact for a year;
Now, therefore, in exercise of the powers conferred by sub-section (1) and clause (v) of sub-section (2) of
section 3 of the Environment (Protection) Act, 1986 (29 of 1986) read with sub-rule (4) of rule 5 of the Environment
(Protection) Rules, 1986, the Central Government, after having dispensed with the requirement of notice under clause (a)
of sub-rule (3) of the rule 5 of the said rules in public interest, for expediting production of Ethanol for its limited
purpose of blending with petrol exclusively for its usage as bio-fuel, hereby makes thefollowing special provision,
namely:-
“(1) All expansion projects of sugar manufacturing or distilleries, having environmental clearances for their present
industrial operations and intended to produce Ethanol for blending with petrol under the Ethanol Blended with
Petrol (EBP)Programme, shall make an application in Form-1 given in Appendix-I of the EIA Notification, 2006
along with the Environmental Management Plan, certificate from the Government of India, the Ministry of
Petroleum and Natural Gas stating that the proposal is for the purpose ofblending the bio-ethanol with the petrol,
for grant of environmental clearance under the provisions of the EIA Notification, 2006, and all such applications
shall be considered by the concerned sectoral Expert Appraisal Committee or State Expert Appraisal Committee,
who shall appraise the proposal as per the procedure applicable to category B2 projects specified in the EIA
Notification, 2006 based on certificate from the Central Ground Water Board regarding adequate availability of
water and adherence to standard conditions related to distilleries (appendix).
(2) The Expert Appraisal Committee may prescribe, in addition to the standard environmental clearance conditions
given in the appendix to this notification, the specific conditions on case to case basis.”
This notification shall remain in force for a period of one year from the date of publication of this notification in
the Official Gazette.
[F.No. IA-J-11013/55/2017-IA.II(I)]
GEETA MENON, Jt. Secy.
¹Hkkx IIµ[k.M 3(ii)º Hkkjr dk jkti=k % vlk/kj.k 9

APPENDIX
Standard EC Conditions
I. Statutory compliance
i. The project proponent shall obtain forest clearance under the provisions of Forest (Conservation) Act,
1986, in case of the diversion of forest land for non-forest purpose involved in the project.
ii. The project proponent shall obtain clearance from the National Board for Wildlife, if applicable.
iii. The project proponent shall prepare a Site-Specific Conservation Plan & Wildlife Management Plan and
approved by the Chief Wildlife Warden. The recommendations of the approved Site-Specific
Conservation Plan / Wildlife Management Plan shall be implemented in consultation with the State Forest
Department. The implementation report shall be furnished along with the six-monthly compliance report.
(incase of the presence of schedule-I species in the study area)
iv. The project proponent shall obtain Consent to Establish / Operate under the provisions of Air (Prevention
& Control of Pollution) Act, 1981 and the Water (Prevention & Control of Pollution) Act, 1974 from the
concerned State pollution Control Board/ Committee.
v. The project proponent shall obtain authorization under the Hazardous and other Waste Management
Rules, 2016 as amended from time to time.
vi. The Company shall strictly comply with the rules and guidelines under Manufacture, Storage and Import
of Hazardous Chemicals (MSIHC) Rules, 1989 as amended time to time. All transportation of Hazardous
Chemicals shall be as per the Motor Vehicle Act (MVA), 1989
II. Air quality monitoring and preservation
i. The project proponent shall install 24×7 continuous emission monitoring system at process stacks to
monitor stack emission with respect to standards prescribed in Environment (Protection) Rules 1986 and
connected to SPCB and CPCB online servers and calibrate these system from time to time according to
equipment supplier specification through labs recognised under Environment (Protection) Act, 1986 or
NABL accredited laboratories.
ii. The project proponent shall install system carryout to Ambient Air Quality monitoring for
common/criterion parameters relevant to the main pollutants released (e.g. PM10 and PM2.5 in reference to
PM emission, and SO2 and NOx in reference to SO2 and NOx emissions) within and outside the plant area
at least at four locations (one within and three outside the plant area at an angle of 120°each), covering
upwind and downwind directions. (case to case basis small plants: Manual; Large plants: Continuous)
iii. The project proponent shall submit monthly summary report of continuous stack emission and air quality
monitoring and results of manual stack monitoring and manual monitoring of air quality /fugitive
emissions to Regional Office of MoEF&CC, Zonal office of CPCB and Regional Office of SPCB along
with six-monthly monitoring report.
iv. Appropriate Air Pollution Control (APC) system shall be provided for all the dust generating points
including fugitive dust from all vulnerable sources, so as to comply prescribed stack emission and fugitive
emission standards.
v. The National Ambient Air Quality Emission Standards issued by the Ministry vide G.S.R. No. 826(E)
dated 16th November, 2009 shall be complied with.
vi. Sulphur content should not exceed 0.5% in the coal for use in coal fired boilers to control particulate
emissions within permissible limits (as applicable). The gaseous emissions shall be dispersed through
stack of adequate height as per CPCB/SPCB guidelines.
vii. The DG sets shall be equipped with suitable pollution control devices and the adequate stack height so
that the emissions are in conformity with the extant regulations and the guidelines in this regard.
viii. Storage of raw materials, coal etc shall be either stored in silos or in covered areas to prevent dust
pollution and other fugitive emissions.
III. Water quality monitoring and preservation
i. For online continuous monitoring of effluent, the unit shall install web camera with night vision capability
and flow meters in the channel/drain carrying effluent within the premises (applicable in case of the
projects achieving ZLD) and connected to SPCB and CPCB online servers.
10 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]

ii. Zero Liquid Discharge shall be ensured and no waste/treated water shall be discharged outside the
premises (applicable in case of the projects achieving the ZLD).
iii. Process effluent/any wastewater shall not be allowed to mix with storm water. The storm water from the
premises shall be collected and discharged through a separate conveyance system.
iv. The effluent discharge shall conform to the standards prescribed under the Environment (Protection)
Rules, 1986, or as specified by the State Pollution Control Board while granting Consent under the
Air/Water Act, whichever is more stringent.
v. Total fresh water requirement shall not exceed the proposed quantity or as specified by the Committee.
Prior permission shall be obtained from the concerned regulatory authority/CGWA in this regard.
vi. Industrial/trade effluent shall be segregated into High COD/TDS and Low COD/TDS effluent streams.
High TDS/COD shall be passed through stripper followed by MEE and ATFD (agitated thin film drier).
Low TDS effluent stream shall be treated in ETP and then passed through RO system.
vii. The Company shall harvest rainwater from the roof tops of the buildings and storm water drains to
recharge the ground water and utilize the same for different industrial operations within the plant.
IV. Noise monitoring and prevention
i. Acoustic enclosure shall be provided to DG set for controlling the noise pollution.
ii. The overall noise levels in and around the plant area shall be kept well within the standards by providing
noise control measures including acoustic hoods, silencers, enclosures etc. on all sources of noise
generation.
iii. The ambient noise levels should conform to the standards prescribed under E(P)A Rules, 1986 viz.
75 dB(A) during day time and 70 dB(A) during night time
V. Energy Conservation measures
i. The energy sources for lighting purposes shall preferably be LED based.
VI. Waste management
i. Hazardous chemicals shall be stored in tanks, tank farms, drums, carboys etc. Flame arresters shall be
provided on tank farm and the solvent transfer through pumps.
ii. Process organic residue and spent carbon, if any, shall be sent to cement industries. ETP sludge, process
inorganic & evaporation salt shall be disposed off to the TSDF.
iii. The company shall undertake waste minimization measures as below:-
a. Metering and control of quantities of active ingredients to minimize waste.
b. Reuse of by-products from the process as raw materials or as raw material substitutes in other
processes.
c. Use of automated filling to minimize spillage.
d. Use of Close Feed system into batch reactors.
e. Venting equipment through vapour recovery system.
f. Use of high pressure hoses for equipment clearing to reduce wastewater generation
VII. Green Belt
i. Green belt shall be developed in an area equal to 33% of the plant area with a native tree species in
accordance with CPCB guidelines. The greenbelt shall inter alia cover the entire periphery of the plant
VIII. Safety, Public hearing and Human health issues
i. Emergency preparedness plan based on the Hazard identification and Risk Assessment (HIRA) and
Disaster Management Plan shall be implemented.
ii. The PP shall provide Personal Protection Equipment (PPE) as per the norms of Factory Act.
iii. Training shall be imparted to all employees on safety and health aspects of chemicals handling. Pre-
employment and routine periodical medical examinations for all employees shall be undertaken on regular
basis. Training to all employees on handling of chemicals shall be imparted.
¹Hkkx IIµ[k.M 3(ii)º Hkkjr dk jkti=k % vlk/kj.k 11

iv. Provision shall be made for the housing of construction labour within the site with all necessary
infrastructure and facilities such as fuel for cooking, mobile toilets, mobile STP, safe drinking water,
medical health care, crèche etc. The housing may be in the form of temporary structures to be removed
after the completion of the project.
v. Occupational health surveillance of the workers shall be done on a regular basis and records maintained as
per the Factories Act.
vi. There shall be adequate space inside the plant premises earmarked for parking of vehicles for raw
materials and finished products, and no parking to be allowed outside on public places
IX. Corporate Environment Responsibility
i. The project proponent shall comply with the provisions contained in this Ministry’s OM vide F.No. 22-
65/2017-IA.III dated 1st May 2018, as applicable, regarding Corporate Environment Responsibility.
ii. The company shall have a well laid down environmental policy duly approve by the Board of Directors.
The environmental policy should prescribe for standard operating procedures to have proper checks and
balances and to bring into focus any infringements/deviation/violation of the environmental / forest
/wildlife norms/ conditions. The company shall have defined system of reporting infringements /
deviation / violation of the environmental / forest / wildlife norms / conditions and / or shareholders / stake
holders. The copy of the board resolution in this regard shall be submitted to the MoEF&CC as a part of
six-monthly report.
iii. A separate Environmental Cell both at the project and company head quarter level, with qualified
personnel shall be set up under the control of senior Executive, who will directly to the head of the
organization.
iv. Action plan for implementing EMP and environmental conditions along with responsibility matrix of the
company shall be prepared and shall be duly approved by competent authority. The year wise funds
earmarked for environmental protection measures shall be kept in separate account and not to be diverted
for any other purpose. Year wise progress of implementation of action plan shall be reported to the
Ministry/Regional Office along with the Six Monthly Compliance Report.
v. Self environmental audit shall be conducted annually. Every three years third party environmental audit
shall be carried out.
X. Miscellaneous
i. The project proponent shall make public the environmental clearance granted for their project along with
the environmental conditions and safeguards at their cost by prominently advertising it at least in two local
newspapers of the District or State, of which one shall be in the vernacular language within seven days
and in addition this shall also be displayed in the project proponent’s website permanently.
ii. The copies of the environmental clearance shall be submitted by the project proponents to the Heads of
local bodies, Panchayats and Municipal Bodies in addition to the relevant offices of the Government who
in turn has to display the same for 30 days from the date of receipt.
iii. The project proponent shall upload the status of compliance of the stipulated environment clearance
conditions, including results of monitored data on their website and update the same on half-yearly basis.
iv. The project proponent shall monitor the criteria pollutants level namely; PM10, SO2, NOx (ambient levels
as well as stack emissions) or critical sectoral parameters, indicated for the projects and display the same
at a convenient location for disclosure to the public and put on the website of the company.
v. The project proponent shall submit six-monthly reports on the status of the compliance of the stipulated
environmental conditions on the website of the ministry of Environment, Forest and Climate Change at
environment clearance portal.
vi. The project proponent shall submit the environmental statement for each financial year in Form-V to the
concerned State Pollution Control Board as prescribed under the Environment (Protection) Rules, 1986, as
amended subsequently and put on the website of the company.
vii. The project proponent shall inform the Regional Office as well as the Ministry, the date of financial
closure and final approval of the project by the concerned authorities, commencing the land development
work and start of production operation by the project.
viii. The project authorities must strictly adhere to the stipulations made by the State Pollution Control Board
and the State Government.
12 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEC. 3(ii)]

ix. The project proponent shall abide by all the commitments and recommendations made in the EIA/EMP
report, commitment made during Public Hearing and also that during their presentation to the Expert
Appraisal Committee.
x. No further expansion or modifications in the plant shall be carried out without prior approval of the
Ministry of Environment, Forests and Climate Change (MoEF&CC).
xi. Concealing factual data or submission of false/fabricated data may result in revocation of this
environmental clearance and attract action under the provisions of Environment (Protection) Act, 1986.
xii. The Ministry may revoke or suspend the clearance, if implementation of any of the above conditions is not
satisfactory.
xiii. The Ministry reserves the right to stipulate additional conditions if found necessary. The Company in a
time bound manner shall implement these conditions.
xiv. The Regional Office of this Ministry shall monitor compliance of the stipulated conditions. The project
authorities should extend full cooperation to the officer (s) of the Regional Office by furnishing the
requisite data / information/monitoring reports.
xv. The above conditions shall be enforced, inter-alia under the provisions of the Water (Prevention & Control
of Pollution) Act, 1974, the Air (Prevention & Control of Pollution) Act, 1981, the Environment
(Protection) Act, 1986, Hazardous and Other Wastes (Management and Transboundary Movement) Rules,
2016 and the Public Liability Insurance Act, 1991 along with their amendments and Rules and any other
orders passed by the Hon'ble Supreme Court of India / High Courts and any other Court of Law relating to
the subject matter.
xvi. Any appeal against this EC shall lie with the National Green Tribunal, if preferred, within a period of 30
days as prescribed under Section 16 of the National Green Tribunal Act, 2010.

Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publications, Delhi-110054. Digitally signed by
MANOJ KUMAR MANOJ KUMAR VERMA
VERMA Date: 2019.01.21
22:02:00 +05'30'

You might also like