Cuff Sealing
Cuff Sealing
Line- Supervisor-
Sub Section- Fusing Observer- Neha Chauhan
Average Daily Requirement(ADR)- 5000
Required Pitchtime (R.P.T)- Mint.( for 8 hrs. work with 10%allowance) = 0.9× 480 / ADR = 0.0864( Sec= 5.184)
Required output per hour 0.9× 60 / RPT = 625
OPERA EMP. OPERATI
S.No. TOR NO. ON Pieces OBSERVED TIME
1 Jaishree 9373 numbering 44 14 13 18 12 14
AVERA O.T + 10
GE O.T % O.P.H
14.2 253.5211
16.2 222.2222
16.8 214.2857
12.6 285.7143
16.8 214.2857
16.8 214.2857
Section- Shirt Date- 14/02/2018
Line- Supervisor-
Required Pitchtime (R.P.T)- Mint.( for 8 hrs. work with 10%allowance) = 0.9× 480 / ADR = 0.0864( Sec= 5.184)
AVERAGE O.T + 10
TIME O.T % O.P.H
5