City Development Plan Allahabad-2041 PDF
City Development Plan Allahabad-2041 PDF
April 2015
Supported under
Ministry of Urban
Development
March 2015
Project Team
Key Experts
Team Members
[iv]
Acknowledgment
The Ministry of Urban Development (MoUD) has launched the Capacity Building for Urban
Development (CBUD) project – supported by the World Bank – to give a thrust to implementation of
reforms proposed to be undertaken by urban local bodies. The CBUD project has identified issues for
intervention and areas of technical assistance that are required in 30 cities across the country that
were identified under the project for Technical Assistance. Formulation of new/revised city
development plans (CDP) is one such initiative. First-generation CDPs were prepared for most of the
cities under the JnNURM/UIDSSMT programme of GoI; these are proposed to be revised under this
project as per the revised CDP guidelines issued by MoUD in April 2013.
CRISIL Risk and Infrastructure Solutions Limited (CRIS) would like to thank MoUD for giving it an
opportunity to work on this prestigious assignment. CRIS would like to express its sincere gratitude for
the guidance and support provided by Dr.Sameer Sharma, IAS, Joint Secretary (Smart Cities);
Mr. Shailendra Vikram Singh, Director (Smart Cities-III and Capacity Building); and Mr. Sanjay
Sharma, Under Secretary (Smart Cities-III), MoUD. CRIS would also like to place on record and thank
the officials of the Town and Country Planning Organization, MoUD, specially Mr. R Srinivas (Town
and Country Planner), Mr. Sudeep Roy (Assistant Town and Country Planner), and Ms. D Blessy
(Assistant Town and Country Planner) for their valuable suggestions provided during the Technical
Advisory Committee meetings.
We would also like to thank the former Joint Secretary and Mission Director Ms. Nisha Singh, IAS,
and Mr. Anand Mohan, former Director (N-IV), MoUD.
CRIS is also grateful to the CBUD project team at MoUD – Mr Nabroon Bhattacharya (Team Leader),
Mr. Hitesh Vaidya (Deputy Team Leader), Mr. Mahtab Alam (Urban Planning Specialist), Mr. Dinesh
Harode (Urban Planning Specialist), and Ms. Basobi Sheel (Social Development Specialist) – for their
timely and consistent technical support throughout the assignment.
We would like to take this opportunity to acknowledge the support provided by the Municipal
Commissioner Shri. Devendra Pandey, for his support. Further, we would also like to thank the
additional commissioner and nodal officer for the CBUD Project Smt Nandita Tripathy, and Hon‟ble
Mayor of Allahabad Smt. Abhilasha Gupta Nandi for their kind cooperation and valuable inputs. Also,
we thank HRD officer, Mr. Raj Kumar Dwivedi for coordinating in identifying the stakeholders and in
organising the workshops for preparation of the City Development Plan. Further, we thank all other
officials of the Allahabad Municipal Corporation for providing the required data and information,
identifying city-level issues as part of the CDP formulation. Last but not the least, we would like to
extend a deep sense of gratitude to all the key stakeholders of the city who have provided their
valuable feedback and suggestions on issues concerning the city and its future infrastructure
requirements, and have prioritised the implementation of the project.
[v]
Abbreviations
ADA Allahabad Development Authority
AMC Allahabad Municipal Corporation
ARV Annual Rental Value
ASI Archaeological Survey of India
ASP Activated Sludge Process
AVP Aawas Vikas Parishad
BOD Biochemical oxygen demand
BPCL Bharat Petroleum Corporation Limited
BPL Below Poverty Line
BSUP Basic Services for Urban Poor
CAA Constitution Amendment Act
CAFO Chief Accounting Financial officer
CAGR Compounded Annual Growth Rate
CBD Central Business District
CBUD Capacity Building for Urban Development
CDP City Development Plan
CIP Capital Investment Plan
CMO Chief Medical Officer
CMP Comprehensive Mobility Plan
CNG Compressed natural gas
CPWD Central Public Works Department
CRIS CRISIL Risk and Infrastructure Solution
CRPF Central Reserve Police Force
DCB Demand Collection Balance
DLB Directorate of Local Bodies
DPR Detailed Project Report
DUDA District Urban Development Authority
ESI Employee's State Insurance
EWS Economically Weaker Section
FOP Financial Operating Plan
GDP Gross Domestic Product
GIS Geographic Information System
IIIT Indian Institute of Information Technology
IPT Intermediate Public Transport
ITI Industrial Training Institute
JICA Japan International Cooperation Agency
JNNURM Jawaharlal Nehru National Urban Renewal Mission
KAVAL Kanpur Agra Varanasi Allahabad Lucknow
LIG Low Income Group
LPCD Litres per Capita per Day
MLA Member of Legislative Assembly
MLD Million Litres per Day
MNNIT Motilal Nehru National Institute of Technology
MOUD Ministry of Urban Development, Government of India
MTPA Million Tonnes Per Annum
NGRBA National Ganga River Basin Authority
NHDP National Highways Development Project
NRW Non-Revenue Water
OHT Over Head Tank
PMU Project Management Unit
PPP Public Private Partnership
PWD Public Works Department
RAY Rajiv Awas Yojna
[vi]
ROW Right of Way
SFC State Finance Commission
SJSRY Swarna Jayanti Shahari Rozgar Yojana
SOR Schedule of Rates
SPV Special Purpose Vehicle
STP Sewerage Treatment Plant
SUDA State Urban Development Authority
SWD Storm Water Drains
SWM Solid Waste Management
SWOT Strength, Weakness, Opportunity and Threat
TCPD Town and Country Planning Department
TPD Tonnes per day
ULB Urban Local Body
UMTA Unified Metropolitan Transport Authority
UPJN Uttar Pradesh Jal Nigam
UPPCB Uttar Pradesh Pollution Control Board
UPSRTC Uttar Pradesh State Roadways Transportation Corporation
WTP Water Treatment Plant
[vii]
Contents
Abbreviation……………………………………………………………………………………………………...vi
Content……………………………………………………………………………………………………...viii
List of Tables…………………………………………………………………………………………………xix
List Of Figures………………………………………………………………………………………………xxiii
List of Maps……………………………………………………………………………………………………xxiv
Executive summary ................................................................................................................................. 1
1. Project Background ......................................................................................................................... 8
1.1 Context .................................................................................................................................... 8
1.2 Revised CDP under CBUD Project ......................................................................................... 9
1.3 Revised CDP Guidelines – Key Areas of Emphasis ............................................................. 11
1.3.1 Vision Led Planning ................................................................................................. 11
1.3.2 Resource based planning ........................................................................................ 11
1.3.3 Participatory Approach ............................................................................................ 11
1.3.4 Equity concerns, poverty and local economy development .................................... 12
1.3.5 Capacity Building in ULB ......................................................................................... 12
1.3.6 Sectoral Action Plans with Goal Oriented Targets .................................................. 12
1.3.7 Monitoring and Evaluation Arrangements ............................................................... 12
1.4 Objective of the assignment .................................................................................................. 12
1.5 Approach and methodology .................................................................................................. 13
st
1.6 Brief on 1 generation CDP .................................................................................................. 15
st
1.6.1 Projects proposed in 1 generation CDP ................................................................ 16
st
1.6.2 Brief scenario after 1 generation CDP ................................................................... 17
1.7 Key process undertaken for CDP preparation process ........................................................ 18
1.7.1 List of meetings ........................................................................................................ 18
1.7.2 Data Collection......................................................................................................... 19
1.7.3 Technical and Policy Committee Formation ............................................................ 19
1.7.4 Stakeholder consultations ........................................................................................ 19
1.7.5 Stakeholder workshop ............................................................................................. 20
2. Introduction to Allahabad City ....................................................................................................... 23
2.1 Regional setting .................................................................................................................... 24
2.2 Administrative boundary........................................................................................................ 25
2.3 Location and connectivity ...................................................................................................... 25
[viii]
2.3.1 Railways ................................................................................................................... 26
2.3.2 Airways .................................................................................................................... 27
2.3.3 Waterway ................................................................................................................. 27
2.4 Defining study area ............................................................................................................... 29
2.5 Physical setting ..................................................................................................................... 29
2.5.1 Topography and Geology ........................................................................................ 29
2.5.2 Climate ..................................................................................................................... 30
2.5.3 Agriculture, mineral and industry ............................................................................. 32
2.5.4 Water Resources ..................................................................................................... 32
2.5.5 Forests Resources ................................................................................................... 32
3. Demographic Profile ..................................................................................................................... 33
3.1 Background ........................................................................................................................... 33
3.2 Population and urbanization.................................................................................................. 33
3.3 Population Density (Ward wise) ............................................................................................ 36
3.3.1 Population distribution ............................................................................................. 38
3.4 Average Household Size ....................................................................................................... 38
3.5 Literacy Rate ......................................................................................................................... 40
3.6 Sex Ratio ............................................................................................................................... 40
3.6.1 Age-sex pyramid ...................................................................................................... 41
3.7 Language .............................................................................................................................. 42
3.8 Scheduled Caste and Scheduled Tribe Population .............................................................. 42
3.9 Migration................................................................................................................................ 42
3.10 Social composition ................................................................................................................ 43
3.11 Population Projections .......................................................................................................... 43
3.11.1 Floating population .................................................................................................. 43
3.11.2 Methodology adopted for estimation of population .................................................. 44
3.11.3 Basic Assumption taken for Population Projection .................................................. 45
3.11.4 Summary of Population Projection through various methods ................................. 46
4. Economic profile of Allahabad ...................................................................................................... 47
4.1 Background ........................................................................................................................... 47
4.2 Overview of Economic Situation ........................................................................................... 47
4.2.1 Uttar Pradesh Economic Profile............................................................................... 47
4.2.2 Industrial Policies and Incentives............................................................................. 47
4.2.3 Allahabad‟s economic profile ................................................................................... 49
[ix]
4.3 Industrial and Commercial Activities ..................................................................................... 50
4.3.1 Industrial development ............................................................................................. 50
4.3.2 Industrial growth Trend ............................................................................................ 51
4.3.3 Trade and commerce ............................................................................................... 51
4.3.4 Informal Business and Local Economy (Trade and commerce) .............................. 52
4.3.5 Informal Commercial Activity ................................................................................... 52
4.3.6 Specific Norms for the Urban Local Bodies ............................................................. 53
4.4 Workforce Participation Rate ................................................................................................ 54
4.5 Worker‟s Classification .......................................................................................................... 55
4.5.1 Primary Sector ......................................................................................................... 56
4.5.2 Secondary Sector .................................................................................................... 56
4.5.3 Tertiary Sector ......................................................................................................... 57
4.6 Future Employment Scenario in Allahabad city .................................................................... 58
4.7 Key Observation .................................................................................................................... 58
4.8 Key issues ............................................................................................................................. 58
5. Physical planning and growth management ................................................................................. 59
5.1 Background ........................................................................................................................... 59
5.1.1 Mughal Period .......................................................................................................... 59
5.1.2 British Period............................................................................................................ 60
5.2 Constituents of planning area ............................................................................................... 60
5.3 Projected population under development plan ...................................................................... 61
5.4 Spatial growth trends ............................................................................................................ 61
5.4.1 The city today........................................................................................................... 62
5.5 Spatial distribution of population ........................................................................................... 62
5.6 Critical Appraisal of the Master Plan/Development Plan ...................................................... 63
5.6.1 Land use analysis Master Plan provisions .............................................................. 63
5.6.2 Development Proposals ........................................................................................... 54
5.7 Urban Planning Functions and Reforms ............................................................................... 55
5.8 Key issues ............................................................................................................................. 55
6. Social Infrastructure ...................................................................................................................... 56
6.1 Background ........................................................................................................................... 56
6.2 Health facilities ...................................................................................................................... 56
6.2.1 Existing situation ...................................................................................................... 56
6.2.2 Basic Public Health indicators ................................................................................. 57
[x]
6.2.3 Role of Municipal Body in the health programs ....................................................... 58
6.3 Educational facilities .............................................................................................................. 59
6.3.1 Existing Situation ..................................................................................................... 59
6.3.2 Basic Education/literacy indicators .......................................................................... 60
6.4 Fire brigade ........................................................................................................................... 60
6.5 Recreational facilities ............................................................................................................ 61
6.5.1 Norms and Standard as per the UDPFI guidelines for Social Infrastructure ........... 62
6.5.2 Key issues ................................................................................................................ 62
7. Assessment of Urban Service....................................................................................................... 64
7.1 Water supply ......................................................................................................................... 64
7.1.1 Existing Water Supply Situation............................................................................... 64
7.1.2 Water Supply future Demand .................................................................................. 70
7.1.3 Critical Analysis of water Supply System post- 1st Generation CDP Scenario ....... 70
7.1.4 Institutional Framework for water supply system ..................................................... 71
7.1.5 Key Issues ............................................................................................................... 71
7.1.6 Ongoing projects ...................................................................................................... 71
7.2 Sewerage and Sanitation ...................................................................................................... 72
7.2.1 Existing Sewerage and Sanitation system .............................................................. 72
7.2.2 Future Sewage Generation ...................................................................................... 78
7.2.3 Critical Analysis of Sewerage and Sanitation System post- 1st Generation CDP
Scenario ................................................................................................................................ 78
7.2.4 Institutional Framework for sewerage and Sanitation system ................................. 79
7.2.5 Key Issues ............................................................................................................... 79
7.2.6 Completed, ongoing and proposed projects ............................................................ 79
7.3 Solid Waste Management ..................................................................................................... 81
7.3.1 Existing Sewerage and Sanitation system .............................................................. 81
7.3.2 Future solid waste generation.................................................................................. 85
7.3.3 Critical Analysis of Solid Waste Management System: post- 1st Generation CDP
Scenario ................................................................................................................................ 85
7.3.4 Key Issues ............................................................................................................... 86
7.4 Storm Water Drainage .......................................................................................................... 86
7.4.1 Existing Drainage System ........................................................................................ 86
7.4.2 Water logging ........................................................................................................... 87
7.4.3 Critical Analysis of Drainage System: post- 1st Generation CDP Scenario ............ 88
7.4.4 Key Issues ............................................................................................................... 88
[xi]
8. Traffic and transportation system.................................................................................................. 90
8.1 Existing road infrastructure ................................................................................................... 90
8.1.1 Road Hierarchy ........................................................................................................ 90
8.1.2 Important junctions .................................................................................................. 93
8.1.3 Bridges, Flyovers and Interchanges ........................................................................ 94
8.1.4 Non-Motorized Transportation (NMT) facilities ........................................................ 94
8.2 Existing Traffic and Transportation System .......................................................................... 95
8.2.1 Traffic Volumes ........................................................................................................ 95
8.2.2 Modes of Transport .................................................................................................. 96
8.2.3 Existing Transportation Infrastructure ...................................................................... 97
8.2.4 Parking facilities ..................................................................................................... 101
8.2.5 Safety and traffic management measures ............................................................. 102
8.2.6 Key issues and Challenges ................................................................................... 102
8.3 Analysis of post- 1st Generation CDP Scenario ................................................................. 103
9. Housing and urban poverty ......................................................................................................... 105
9.1 Overall housing scenario in the city .................................................................................... 105
9.1.1 Present availability of housing stock ...................................................................... 105
9.1.2 Quality of housing stock ......................................................................................... 105
9.1.3 Housing requirement as per the future projected population ................................ 106
9.1.4 Overview of growing Housing Sector in the town .................................................. 106
9.2 Urban Poverty and Slums ................................................................................................... 106
9.2.1 Number of Slums ................................................................................................... 107
9.2.2 Available infrastructure for slum communities ....................................................... 107
9.2.3 Government Initiatives in slum improvement ......................................................... 108
9.2.4 Critical Analysis of housing and urban poverty under 1st Generation CDP Scenario
108
9.2.5 Policy, Regulatory and Institutional Framework .................................................... 109
9.2.6 Key Issues ............................................................................................................. 109
10. Baseline Environment: Urban Environment and Disaster Management ............................ 110
10.1 Pollution Level in the town .................................................................................................. 110
10.1.1 Ambient Air Quality ................................................................................................ 110
10.1.2 Noise Pollution ....................................................................................................... 110
10.1.3 Water Pollution....................................................................................................... 110
10.2 Water bodies ....................................................................................................................... 111
10.2.1 List of water bodies in the town ............................................................................. 111
[xii]
10.2.2 Existing condition of water bodies ......................................................................... 111
10.3 Gardens and open spaces .................................................................................................. 112
10.4 Identification of environmentally sensitive areas ................................................................. 112
10.5 Disaster Proneness Assessment of the City ....................................................................... 112
10.6 Disaster Management Mitigation Measures ........................................................................ 113
10.7 Key issues ........................................................................................................................... 116
11. Climate Change .................................................................................................................. 117
11.1 Climate Change and urban cities ........................................................................................ 117
11.2 Carbon footprint and heat island mapping .......................................................................... 118
11.2.1 Concept of carbon footprint and its impact ............................................................ 118
11.3 Impact & Imperatives .......................................................................................................... 119
11.4 Climate resilience and carbon reduction strategy ............................................................... 120
11.4.1 Available policies for climate change and disaster resilience ................................ 121
11.4.2 Strategies ............................................................................................................... 121
11.4.3 Review of various climate resilience frameworks .................................................. 122
12. Cultural Resources, Heritage and Tourism ........................................................................ 123
12.1 Historical importance of the town ........................................................................................ 123
12.2 Tourism Scenario ................................................................................................................ 123
12.2.1 Major tourist spot ................................................................................................... 124
12.2.2 Tourist Arrival ......................................................................................................... 130
12.2.3 Existing tourist supported infrastructure ................................................................ 130
12.2.4 Existing tourism development initiatives ................................................................ 130
12.2.5 Role of agencies involved in tourism ..................................................................... 130
12.3 Fairs and Festivals .............................................................................................................. 132
12.3.1 Kumbh Mela ........................................................................................................... 132
12.4 Key Concern Areas for Tourism Development ................................................................... 133
13. Assessment of Institutions, Systems and Capacities ......................................................... 135
13.1 Urban governance system .................................................................................................. 135
13.1.1 Allahabad Municipal Corporation ........................................................................... 136
13.1.2 Jal Kal .................................................................................................................... 138
13.1.3 Parastatals ............................................................................................................. 139
13.2 Urban reforms /transfer of function (CDP post 1st Generation scenario) ........................... 142
13.2.1 Status of JnNURM Implementation ....................................................................... 143
13.2.2 Progress in Implementation of Reforms – State Level Reforms ........................... 143
[xiii]
13.2.3 ULB Level Reforms – Mandatory and Optional ..................................................... 144
13.3 Public Private Partnership ................................................................................................... 148
13.4 Overlaps of roles and responsibility .................................................................................... 149
13.5 Key Issues ........................................................................................................................... 150
14. Financial Assessment ......................................................................................................... 151
14.1 Status of service levels ....................................................................................................... 151
14.2 Existing Municipal Finance .................................................................................................. 152
14.3 Revenue Account ................................................................................................................ 154
14.3.1 Revenue Receipts ................................................................................................. 154
14.3.2 Revenue expenditure ............................................................................................. 157
14.4 Capital account.................................................................................................................... 159
14.4.1 Capital income ....................................................................................................... 160
14.4.2 Capital expenditure ................................................................................................ 160
15. SWOT Analysis ................................................................................................................... 162
15.1 SWOT Analysis ................................................................................................................... 162
15.2 SWOT.................................................................................................................................. 163
16. City Vision, Development Goals and Strategies ................................................................. 165
16.1 Stakeholder Consultations .................................................................................................. 165
16.2 Consultative Meetings ......................................................................................................... 165
16.3 Focus Group Discussions ................................................................................................... 165
16.4 Workshop process .............................................................................................................. 166
16.5 Issues identified .................................................................................................................. 169
16.6 Stakeholder suggestions ..................................................................................................... 170
16.7 Stakeholder Workshop - Draft City Development Plan ....................................................... 172
16.8 Vision formulation ................................................................................................................ 175
16.9 Approach to Allahabad City Planning ................................................................................. 175
16.9.1 Service Integration ................................................................................................. 176
16.9.2 Area Integration ..................................................................................................... 176
16.10 Development Goals ..................................................................................................... 176
16.10.1 Development Goal 1: Clean Allahabad-Clean Ganga-Yamuna ............................ 176
16.10.2 Development Goal 2: Retain the religious pre-eminence of Allahabad in India .... 177
16.10.3 Development Goal 3: Make Allahabad an environmentally sustainable city ......... 177
16.10.4 Development Goal 4: Economic vibrancy to the City ............................................ 177
17. Sector Plans, Strategies and Investment plan .................................................................... 178
[xiv]
17.1 Institutionalizing CIP ............................................................................................................ 178
17.2 Water supply sector plan ..................................................................................................... 179
17.2.1 Capital Investment Plan ......................................................................................... 181
17.2.2 Project details ........................................................................................................ 181
17.2.3 Phasing of investment ........................................................................................... 182
17.2.4 Possibility of PPP ................................................................................................... 183
17.3 Sewerage and sanitation ..................................................................................................... 183
17.3.1 Capital investment plan ......................................................................................... 185
17.3.2 Project details ........................................................................................................ 186
17.3.3 Phasing of investment ........................................................................................... 186
17.3.4 Possibility of PPP ................................................................................................... 186
17.4 Solid waste management .................................................................................................... 187
17.4.1 Capital investment plan ......................................................................................... 189
17.4.2 Project details ........................................................................................................ 189
17.4.3 Phasing of investment ........................................................................................... 189
17.4.4 Possible PPP intervention ..................................................................................... 190
17.5 Storm water drainage .......................................................................................................... 190
17.5.1 Capital investment plan ......................................................................................... 191
17.5.2 Project details ........................................................................................................ 192
17.5.3 Phasing of investment ........................................................................................... 192
17.6 Urban roads, traffic & transportation ................................................................................... 192
17.6.1 Capital investment plan ......................................................................................... 194
17.6.2 Project details ........................................................................................................ 195
17.6.3 Phasing of investment ........................................................................................... 196
17.7 Basic Services for Urban Poor ............................................................................................ 198
17.7.1 Capital investment plan ......................................................................................... 199
17.7.2 Project details ........................................................................................................ 199
17.7.3 Phasing of investment ........................................................................................... 200
17.8 Social Infrastructure and Heritage Sector Plan ................................................................... 200
17.8.1 Capital investment plan ......................................................................................... 202
17.8.2 Project details ........................................................................................................ 202
17.8.3 Phasing of projects ................................................................................................ 203
17.9 Urban Environment and Disaster Management Sector Plan .............................................. 204
17.9.1 Capital investment plan ......................................................................................... 205
[xv]
17.9.2 Project Details ........................................................................................................ 205
17.9.3 Phasing of investment ........................................................................................... 206
17.10 Local Economic Development ..................................................................................... 206
17.10.1 Capital Investment Plan ......................................................................................... 207
17.10.2 Project Details ........................................................................................................ 207
17.10.3 Phasing of investment ........................................................................................... 207
17.11 Tourism Sector Plan .................................................................................................... 208
17.11.1 Capital Investment Plan ......................................................................................... 208
17.11.2 Project Details ........................................................................................................ 209
17.11.3 Phasing of investment ........................................................................................... 209
17.12 Urban Governance ...................................................................................................... 210
17.12.1 Capital Investment Plan ......................................................................................... 210
17.12.2 Phasing of investment ........................................................................................... 210
17.13 Summary of Investments ............................................................................................ 211
17.14 Summary of investment phasing ................................................................................. 212
17.15 Composition of phasing ............................................................................................... 213
17.16 AMC Investment .......................................................................................................... 214
18. Financial operating plan ...................................................................................................... 215
18.1 Financial plan for the city .................................................................................................... 215
18.2 Methodology ........................................................................................................................ 215
18.3 Financing strategies for CIP ................................................................................................ 218
18.4 Financial projections ........................................................................................................... 219
18.4.1 Investment sustenance capacity............................................................................ 219
18.4.2 Key assumptions ................................................................................................... 220
18.5 Investible surplus ................................................................................................................ 221
18.6 Business-as-usual scenario ................................................................................................ 223
18.7 Improved case scenario – Reforms Implementation and debt ........................................... 224
18.7.1 Key Summary ........................................................................................................ 224
18.8 Revenue enhancement initiatives ....................................................................................... 225
18.9 Expenditure management initiatives ................................................................................... 226
18.10 Asset management initiatives ..................................................................................... 226
18.10.1 Project implementation measures ......................................................................... 227
18.11 Financial management initiatives ................................................................................ 230
18.12 Projects on PPP basis ................................................................................................. 230
[xvi]
18.13 Land resource leveraging ............................................................................................ 232
18.14 Key Conclusions.......................................................................................................... 232
19. Review and Monitoring framework ..................................................................................... 234
19.1 Framework for Review and monitoring ............................................................................... 235
19.1.1 Timeline and Periodicity of review ......................................................................... 235
19.2 Reviewing of the CDP Document ....................................................................................... 236
19.2.1 Engaging with Community and Stakeholders‟ Consultation .................................. 236
19.2.2 Data Update and Mapping of the City ................................................................... 236
19.2.3 Capacity Building ................................................................................................... 236
19.3 Review and Monitoring of Reforms and Project Implementation ........................................ 236
19.3.1 Assessment of Reforms and Project Implementation............................................ 236
19.3.2 Financial Reforms .................................................................................................. 236
19.3.3 Property Tax Reforms ............................................................................................ 237
19.3.4 Sector /Ward Development Plans.......................................................................... 237
19.3.5 Review of the Project Priorities .............................................................................. 237
19.4 Monitoring of Financial Operating Plan and Capital Investment Plan................................. 237
Annexure ............................................................................................................................................. 239
Kick off meeting .................................................................................................................. 239
Minutes of meeting.............................................................................................................. 239
Inception meeting................................................................................................................ 241
Minutes of meeting.............................................................................................................. 241
Attendance sheet ................................................................................................................ 243
Technical and policy committee members ......................................................................... 244
Interim workshop................................................................................................................. 245
Minutes of workshop ........................................................................................................... 245
Attendance sheet ................................................................................................................ 250
Final Workshop ................................................................................................................... 251
Minutes of meeting.............................................................................................................. 251
Attendance Sheet ............................................................................................................... 252
District wise population ....................................................................................................... 253
Road widening proposals ................................................................................................... 255
Towns in Allahabad Urban Agglomeration ......................................................................... 257
Right of way ........................................................................................................................ 258
List of ASI protected monuments........................................................................................ 259
[xvii]
Municipal Finance ............................................................................................................... 261
Financial Operating Plan .................................................................................................... 261
Base case ........................................................................................................................... 261
Business as usual - With grant and Debt ........................................................................... 262
Improved Case Scenario: with Grant +Debt ....................................................................... 262
Action Taken Report ........................................................................................................... 263
[xviii]
List of Tables
[xix]
Table 7.2 Water supply source .............................................................................................................65
Table 7.3 water storage reservoir .........................................................................................................66
Table 7.4 Rising mains ..........................................................................................................................67
Table 7.5 Water Distribution setup in Allahabad ...................................................................................67
Table 7.6 Number of water meters .......................................................................................................67
Table 7.7 Water supply tariff .................................................................................................................68
Table 7.8 Service level status - Water supply .......................................................................................68
Table 7.9 Water supply cost recovery ...................................................................................................69
Table 7.10 Water supply - DCB statement ...........................................................................................69
Table 7.11 Water supply demand .........................................................................................................70
Table 7.12 Current system ....................................................................................................................73
Table 7.13 Sewerage Zone-Wise Distribution of Service Area .............................................................75
Table 7.14 Sewerage treatment plants .................................................................................................75
Table 7.15 Service level benchmarks - Sewerage ...............................................................................76
Table 7.16 Assessment of Access to Toilets - Community/Public Toilets ............................................77
Table 7.17 Future sewerage generation ...............................................................................................78
Table 7.18 Transportation vehicles .......................................................................................................83
Table 7.19 SWM user charges..............................................................................................................84
Table 7.20 Future solid waste generation .............................................................................................85
Table 7.21 Water logging areas ............................................................................................................87
Table 8.1 Road details ..........................................................................................................................93
Table 8.2 Traffic volume........................................................................................................................95
Table 8.3 Peak hour traffic intensities ...................................................................................................95
Table 8.4 Number of vehicles in Allahabad district ...............................................................................96
Table 8.5 Depots and no. of buses .......................................................................................................98
Table 8.6 Bus routes of Allahabad ........................................................................................................98
Table 8.7 IPT route in Allahabad ........................................................................................................100
Table 8.8 Road accidents ...................................................................................................................102
Table 9.1 Condition of census houses ................................................................................................106
Table 10.1 Air quality, UPPCB - 2013 .................................................................................................110
Table 10.2 River water quality details .................................................................................................111
Table 10.3 Location and Catchment Area of Gauge Station in Allahabad district ..............................112
Table 10.4 Prevention and mitigation plans ........................................................................................113
Table 11.1 Impact of global warming ..................................................................................................118
[xx]
Table 11.2 Effects of climate change ..................................................................................................119
Table 11.3 Impact of climate change on rivers ...................................................................................120
Table 11.4 Climate change policies ....................................................................................................121
Table 11.5 Review of various climate resilience frameworks .............................................................122
Table 12.1 Tourist flow pattern............................................................................................................130
Table 12.2 Role of agencies involved .................................................................................................130
Table 12.3 Floating population during Kumbh Mela ...........................................................................133
Table 13.1: Roles and responsibilities of ULB and parastatals ..........................................................135
Table 13.2 Category-wise manpower strength ...................................................................................138
th
Table 13.3: Status of 74 CAA............................................................................................................142
Table 13.4 State level reforms ............................................................................................................143
Table 13.5 Mandatory reforms ............................................................................................................145
Table 13.6 Optional reforms................................................................................................................146
Table 13.7: e-Governance reforms .....................................................................................................147
Table 14.1 Financial assessment service level...................................................................................151
Table 14.2 Financial Statement of AMC for analysis period (2008-09 to 2011-12) in Rs. lakhs ........153
Table 14.3 Tax receipts in Rs. lakhs ...................................................................................................155
Table 14.4 Non-tax receipts in Rs. Lakhs ...........................................................................................156
Table 14.5 Assigned grants and contribution income in Rs. Lakhs ....................................................156
Table 14.6 Establishment expense in Rs. lakhs .................................................................................158
Table 14.7 O&M expense ...................................................................................................................159
Table 14.8 Capital expenditure ...........................................................................................................160
Table 15.1 Competitive position of the city .........................................................................................162
Table 15.2 Strength and weakness in the city ....................................................................................162
Table 15.3 Opportunities and threats in the city .................................................................................163
Table 15.4 SWOT Analysis .................................................................................................................163
Table 16.1 Sector wise key issues ......................................................................................................169
Table 16.2 Stakeholder suggestions ...................................................................................................170
Table 16.3 Agenda for stakeholder workshop at draft stage ..............................................................172
Table 16.4 Development Goal 1 .........................................................................................................176
Table 16.5 Development Goal 2 .........................................................................................................177
Table 16.6 Development Goal 3 .........................................................................................................177
Table 16.7 Development Goal 4 .........................................................................................................177
Table 17.1: Water supply sector plan .................................................................................................179
[xxi]
Table 17.2 Water supply capital investment plan ...............................................................................181
Table 17.3 Water supply project details ..............................................................................................182
Table 17.4 Water Supply Phasing ......................................................................................................182
Table 17.5 Sewerage sector plan .......................................................................................................184
Table 17.6 Projects identified and phasing – Sewerage and sanitation .............................................185
Table 17.7 Projects Details – Sewerage and sanitation .....................................................................186
Table 17.8 Project Phasing – Sewerage and sanitation .....................................................................186
Table 17.9 Solid Waste Management sector plan ..............................................................................187
Table 17.10 Projects identified – Solid waste management ...............................................................189
Table 17.11 Projects Details – Solid waste management ..................................................................189
Table 17.12 Phasing of investment – Solid waste management ........................................................189
Table 17.13 Strom Water Drainage sector plan..................................................................................190
Table 17.14 Projects identified – Storm water drainage .....................................................................191
Table 17.15 Projects Details – Storm water drainage ........................................................................192
Table 17.16 Phasing of Investment – Storm water drainage ..............................................................192
Table 17.17 Urban Roads and Traffic and Transportation .................................................................192
Table 17.18 Projects identified – Traffic and transportation ...............................................................194
Table 17.19 Projects Details– Traffic and transportation ....................................................................195
Table 17.20 Phasing of investment – traffic and transportation..........................................................196
Table 17.21 Basic Services for Urban Poor sector plan .....................................................................198
Table 17.22 Urban poverty alleviation – Projects identified ................................................................199
Table 17.23 Urban poverty alleviation – Projects Details ...................................................................199
Table 17.24 Urban poverty alleviation – Phasing of investment .........................................................200
Table 17.25 Social infrastructure sector plan......................................................................................200
Table 17.26 Socio cultural infrastructure – Projects identified ............................................................202
Table 17.27 Socio cultural infrastructure – Projects Details ...............................................................203
Table 17.28 Socio cultural infrastructure – Phasing of projects..........................................................203
Table 17.29 Urban environment sector strategy .................................................................................204
Table 17.30 Urban environment– Projects identified ..........................................................................205
Table 17.31 Urban environment– Projects Details .............................................................................205
Table 17.32 Urban Environment– Phasing of investment ..................................................................206
Table 17.33 Local Economic Development sector strategy ................................................................206
Table 17.34 Local Economic Development – Projects .......................................................................207
Table 17.35 Local Economic Development – Project Details .............................................................207
[xxii]
Table 17.36 Local Economic Development – Phasing of investment .................................................207
Table 17.37 Tourism Development sector strategy ............................................................................208
Table 17.38 Tourism Development sector – Project detail .................................................................208
Table 17.39 Tourism Development sector – Project detail .................................................................209
Table 17.40 Tourism Development sector – Phasing of investment ..................................................209
Table 17.41 Urban governance sector strategy ..................................................................................210
Table 17.42 Urban Governance sector – Project detail ......................................................................210
Table 17.43 Urban governance sector – Phasing of investment ........................................................210
Table 17.44 Summary of investments (in Rs. Cr.) ..............................................................................211
Table 17.45 Investment needs in Rs. Cr. ............................................................................................212
Table 17.46 Project phasing ...............................................................................................................212
Table 17.47 Implementing agency wise breakup of investment .........................................................213
Table 17.48 Sector wise breakup of AMC investment ........................................................................214
Table 18.1: Methodology for City Financial Plan for Allahabad ..........................................................215
Table 18.2: Key Financial Assumption for FOP projections ...............................................................220
Table 18.3: Revenue enhancement measures for various sectors ....................................................225
Table 18.4 Project implementation measures .....................................................................................227
Table 18.5: Projects on PPP basis .....................................................................................................231
Table 19.1: Framework for Monitoring and Evaluation of various components in the CDP ...............235
[xxiii]
List of Figures
[xxiv]
List of Maps
[xxv]
[xxvi]
Ministry of Urban Development
Executive summary
st
The 1 generation CDP for Allahabad was prepared in 2006 by the Allahabad Municipal Corporation
(AMC). The revision of CDP for the Allahabad city has been prepared in keeping with the objectives of
the CBUD project to address the major constraints of urban development and specifically focus on the
capacity building requirements for successful urban management and poverty reduction across the
selected ULBs in India.
Allahabad is also known as Prayag. The city was founded by the Mughal emperor Akbar in the year
1575 AD, and was called „Illahabas‟. Today Allahabad is one of the major cities of Uttar Pradesh, it is
the city of religious significance both at the national and international level. The presence of the holy
Triveni Sangam, which is the confluence of the rivers Ganga, Yamuna and Saraswati, further
strengthens the strategic influence that Allahabad has in the state and the region. The Magh Mela is
an annual event and the Kumbh Mela is celebrated every twelve years and Ardh (half) Kumbh Mela is
celebrated every six years.
Allahabad city is one of the largest commercial centers in Uttar Pradesh; it also has the second-
highest per capita income and the third-greatest GDP in the state. Allahabad is basically an
administrative and educational city. The High Court of Uttar Pradesh, Auditor General of Uttar
Pradesh, Principal Controller of Defense Accounts (Pension) (PCDA), Uttar Pradesh Madhymik
Shiksha Prishad (UP Board) office, Police Headquarters, Allahabad University, Moti Lal Nehru
National Institute of Technology, Medical and Agriculture College, Indian Institute of Information
Technology (IIIT), ITI Naini and IIFCO Phulpur are situated in the city.
Allahabad is well-connected with other parts of the country by rail and road network. Varanasi is at a
distance of 116 km and Kanpur is at a distance of 187 km from Allahabad. Both the cities are
connected with Allahabad via NH-2. Overall, the city‟s connectivity and historic significance played a
major role in making it an important city in the region.
The main industries of Allahabad are tourism, fishing and agriculture. There are secondary activities
and manufacturing which may be registered or unregistered. Another aspect is large number of
constructions taking place in Allahabad which again improvises the city's economy. The third All India
Census for Small Scale Industries shows that there are more than 10,000 unregistered small-scale
industry units in the city. An Integrated Industrial Township is also proposed in 1200 acres of area in
Allahabad under Dedicated Freight Corridor Corporation of India.
The commercial structure of Allahabad has its CBD incorporated in the oldest section of the city,
Meerganj, supporting nearly 70% of the total business of the city. Among the activities being practiced
are – utensil market, cloth market, cycle market, gur mandi, spice market, general merchandise, oil
and ghee mandi, stationery stores, grain market, timber/ furniture mandi, fruit and vegetable market.
Given this scenario, there is need to develop physical and social infrastructure of the city, the
industrial corridors and mass transit facilities to connect the residential zones to the employment
zones.
In light of this through participatory development of CDP for Allahabad the vision has been formulated
as “A hi-tech city together with continuing cultural and religious traditions by laying an good
focus on religious tourism. The traditional education of the city shall be given maximum thrust
for it to come a knowledge hub”.
[1]
City Development Plan Allahabad – 2041
Ministry of Urban Development
The sectors such as water supply, sewerage and sanitation, solid water management, storm water
drainage, traffic and transportation, urban poverty and slum improvement, local economic
development, urban environment, social infrastructure, and tourism and heritage management are
covered under the development goals to realize the vision. The development goals have been framed
on the basis of priority areas, to achieve the Vision for the city and to meet the desired sector specific
service level benchmarks and indicators. Thus the sector specific development goals have been
substantiated with detailed action plan.
The project identification has been carried out on the basis of demand-gap analysis. Further, the
sector strategies and action plans have been finalized based on discussions with relevant
stakeholders. The goals and service outcomes are envisaged to be implemented by 2021 as an
immediate priority. The projects identified involve rehabilitation of existing infrastructure systems and
augmentation of the capacity to meet the demands of future population.
Water supply
In case of water supply, the key problem is old and dilapidated distribution network, high NRW
level, low cost recovery, and low quality of water supplied. As per our assessment the city
requires about 418 MLD of water by the end of 2041 to meet the demand of 2041. In addition, to
provide continuous water supply, the city would require augmenting treatment capacity by 149
MLD, install water supply meters, and refurbishment of existing OHTs.
The key issues in case of sewerage and sanitation are lack of underground drainage (UGD)
system and sewerage treatment facility. Only 25% of the AMC area is covered with UGD network.
Ongoing works under JICA and JNNURM need to be expedited. Further, the sanitation facilities in
slums and public toilets in tourist places need to be addressed by AMC. Most of the projects have
been approved and are being implemented under various schemes.
As per the gap analysis and discussion with officials, there is a need to lay pipelines to carry
treated water, construction public community toilets and procure sewerage cleaning equipment.
procurement of busses, construction of bus and truck terminal, and various pedestrian friendly
proposals.
Social infrastructure
The key challenges in social and cultural infrastructure space are lack of adequate education
infrastructure for pre-primary, primary, and higher secondary education. Further there is a need
for development of health care infrastructure at both neighborhood and city level. Further, Socio-
cultural infrastructure such as community centers is to be developed. The requirement for
development of schools, hospitals, socio cultural facilities and parks and playgrounds have been
assessed as per the URDPFI guidelines
The action plan includes mapping of water bodies, eviction of encroachments, and construction of
rainwater harvesting pits, implementing pollution mitigation strategies, and diligent impact
assessment and monitoring for infrastructure projects.
To cope up with the natural and manmade disasters in the city, establishment of Disaster
management cell at AMC with emergency response system has been proposed, in addition
development of river front has been proposed, planting of trees, and laying of conduits to avoid
digging and reduce air pollution.
[3]
City Development Plan Allahabad – 2041
Ministry of Urban Development
On the expenditure side, the revenue expenditure has increased from Rs 6284 lakhs in 2008-09 and
Rs 9188 lakhs in 2012-13 registering a CAGR of 13%. Composition of Revenue expenditure over the
recent years has changed compared to the average trend on account of increase in O&M cost. The
salary expenditure as a percentage of total revenue expenditure has increased from 73% to 78%.
The analysis of revenue income and expenditure demonstrates that revenue account of AMC was in
surplus only in 2011-12. This indicates the deficiency of Revenue Income to meet the Revenue
Expenditure on regular basis. On an average, the operation ratio is 1.05 it indicates the AMC is not
able to manage the Revenue Expenditure. The deficit is being met through grants.
AMC has not taken any loans or municipal bonds during the review period. Capital Expenditure (CE)
consists of regular capital works as well as capital works funded by specific grants / scheme e.g.
JNNURM. The AMC‟s capital expenditure increased from Rs. 3290 lakhs in 2008-09 to Rs. 15,807
lakhs in 2012-13, registering a CAGR of 68%.
[4]
City Development Plan Allahabad – 2041
Ministry of Urban Development
1. AMC: AMC would be responsible for planning, operation, and maintenance of water supply,
sewerage system, SWM, SWD, municipal roads, parks, and playgrounds. AMC would be the
implementing agency for the projects identified in the above mentioned sectors. In the overall
investment, AMC has to contribute 53% of total investment.
2. District Urban Development Authority: DUDA would be responsible for planning,
designing, and constructing slum households. In the overall investment, DUDA has to
contribute 6% of total investment.
3. Uttar Pradesh State Tourism Department: UPSTD would be responsible for construction,
operation and maintenance of tourist points within the state. Hence UPSTD has been
identified as responsible agency for the tourism development projects identified in the CDP. In
the overall investment, UPSTD has to contribute 0.2% of total investment.
4. Uttar Pradesh State Roadways Corporation: UPSRTC would be responsible for
procurement of buses, up gradation of bus stands, construction of new bus stands and bus
stops. Hence, UPSRTC has been identified as responsible agency for these projects in the
CDP. In the overall investment, UPSRTC has to contribute 10% of total investment.
5. State Public Works Department: PWD would be responsible for construction of flyovers and
bridges. Hence PWD has been identified as the agency for flyovers and bridges. In overall
investment, PWD has to contribute 18% of total investment.
6. State Irrigation Department: Irrigation Department would be construction for riverfront
on the three sides of the city. In overall investment, state Irrigation Department has to
contribute 6% of total investment
7. Department of Education and health: The state department for education and health would
be responsible for development of the education and health facilities identified as per the
URDPFI guidelines. In the overall investment, the education department has to contribute 1%
of the total investment and health department has to contribute 3% of the total investment.
The agency wise investment has been summarised in the table below:
2021 2041
Sr. Investment Investment
Name of Agency
No Estimated in % Estimated in %
Rs. Crore Rs. Crore
1 AMC 3385 53.3% 5748 53.8%
2 DUDA 641 10.1% 641 6.0%
3 PWD 1155 18.2% 1946 18.2%
4 Tourism 22 0.4% 22 0.2%
5 Irrigation 350 5.5% 700 6.6%
6 Health, education and fire 174 2.8% 360 3.4%
7 UPSRTC 570 9.0% 1154 10.8%
8 ADA 50 0.8% 100 0.9%
Total 6350 100.0% 10,675 100.0%
[5]
City Development Plan Allahabad – 2041
Ministry of Urban Development
AMC Investment
The overall the investment required for the year 2041 is Rs 5748 crores. However, AMC would be
responsible to take-up the projects worth Rs 3385 crores and the remaining investment to be taken-
up by the Parastatals/state government departments. The sector wise breakup of AMC‟s investment
for 2021 and 2041 has been presented in the table below.
Given the existing financial position of AMC, the revenue and capital accounts of AMC are projected
against the growth scenario. The FOP is generated from the sustainable investment point of view in
line with the current growth trends against the identified investment.
1
For the preparation of FoP for AMC, we have adopted the methodology as provided in the revised CDP toolkit.
2
Based on the past trends, it is assumed the funding structure would remain same as it was in the JNNURM;
[6]
City Development Plan Allahabad – 2041
Ministry of Urban Development
The overall investment estimated is Rs. 3385 crores (on constant prices). However, as per the current
prices, the estimated investment would be Rs. 4371 crores (which includes the cost escalation and
physical contingencies). It is observed that without any grant support, AMC can implement projects
worth Rs. 306 crores only. Based on the availability of grants, AMC can take up priority projects in the
area of sewerage and sanitation, solid waste management, and traffic and transportation.Thus there
is need to augment investment capacity by implementing revenue enhancement measure and
implement mandated reforms to enable it to access state and central grants i.e. achieve improved
case investment capacity.
Given the importance of Allahabad city in the region, it is very important to improve the basic
infrastructure facilities and tourism related to attract tourists and investment and industries in the city
and further to boost the economic development in the region.
Therefore, AMC should aim to implement the improved case investment capacity (Rs. 1923
crores) with grant support for state and central governments. Following key steps to be taken by
AMC to achieve the improved case scenario investment:
On immediate basis, reforms are to be implemented in property tax to improve the coverage
and collection efficiency; the reforms could be policy levels change to streamline the
department.
Water and sewerage tariff structure is to be revised immediately. AMC should explore the
volumetric tariff structure for the metered water connections.
AMC should levy the user charges on SWM services – AMC may explore this initiative as
part of property tax.
AMC should explore the outsourcing of certain function to reduce establishment
expenditure.
AMC should ensure that the contractor carries out the O&M of the assets (WTP, STP, and
SWM plant) for a period of 5-8 years after the completion of test run.
AMC should curtail the regular capital expenditure over the next 5-10 years. AMC should
take up only priority works in wards.
AMC should explore the PPP route to implement either the projects or project components.
Thus the CDP embodies the approach methodology and implementation action which can facilitate
the development of the Allahabad city. However to facilitate this there is also need to streamline and
strengthen the institutional arrangements to implement the development plan. In this context it is
important that requisite institutions system and capacities are in place. The AMC has over the years
undertaken several initiatives to reform the urban governance and implement reforms at the city level.
However there is need to further and deepen these initiatives, these and associated aspects are also
discussed in the report
[7]
City Development Plan Allahabad – 2041
Ministry of Urban Development
1. Project Background
1.1 Context
The need for an overall urban improvement and development to sustain the economic growth
momentum post the liberalization era first found its expression in the mandate of JNNURM launched
by the Government of India in 2005. The project endeavored to bring about an improvement in urban
quality of life and make them as investment destinations. The programme derived its initial rationale
from the “National Common Minimum Programme” of the Government of India that laid stress on
expansion of physical infrastructure and therefore, comprehensive urban renewal and slum
development could be taken up. The second rationale for such a large scale programme was derived
from India‟s International commitment to achieving the Millennium Development Goals and therefore,
the Government of India (GoI) proposed to:
In recognition to the above mandate, the JNNURM programme was conceived. The scale of the
programme was aimed to be in a mission mode primarily to make the cities to realize their full
potential and become engines for growth. It was opined that the urban sector contributes to over 50%
of the country‟s Gross Domestic Product (GDP) and therefore, focused attention is required for urban
infrastructure development.
As already mentioned above, the JNNURM is the first flagship national programme for urban
development of this nature and size by the Government of India. The programme sought to bring
about a change in the very manner of looking at urban development. It recognized the importance of
two major aspects for urban development in the country including:
the need for urban infrastructure improvement in order to improve quality of life and
sustain the local economy as well as to attract more investments; and
the need for investment for carrying out the urban infrastructure improvements.
In doing the above, the programme brought about the necessary awareness among the Urban Local
bodies (ULBs) for planning and implementation of projects, need for systematizing the urban services
and their management, the need for involving stakeholders in project planning and raising revenues
for the urban areas that can sustain the urban infrastructure. Significant emphasis was given to urban
governance reforms and the need to link reforms with investments. Assistance therefore, to the state
governments and ULBs was proposed to flow through a reforms linked plan. Introduction of such
reforms were considered crucial for developing sustainable infrastructure that would include:
Both these aspects were to be achieved through the agenda of reforms in the cities.
Progress
Over the past seven years, the programme has committed over Rs. 286 billion for 552 projects
involving a total investment of over Rs. 620 billion. Some of the key achievements of the project
include:
[8]
City Development Plan Allahabad – 2041
Ministry of Urban Development
The mission has been successful in catalyzing multi-year investments and reformed
development in urban infrastructure.
There has been visible improvement in the delivery of municipal services in many cities.
Some cities have prepared development/master plans for the first time. There is also greater
awareness in the ULBs for the need to develop systematic plans for improvement in
infrastructure. There is also an increase in aspiration levels among communities and there is
a demand for better infrastructure and services.
Several projects especially in transport sector have been taken up within the JNNURM
framework that has significantly improved the quality of life in the cities.
There has been good progress in implementation of reforms at policy level at state and
central level. Most of the states have framed their policies on reforms and started
implementing the same. ULBs are started implementing the reforms in the areas of
accounting and e-governance
While there has been significant change in the urban sector due to JNNURM at the same there has
been challenges which needs to be addressed going forward
CDP was seen as an investment plan for projects in the immediate term and not as a vision
document for the city with very limited cities revising the same.
While preparing the CDP, consultations with the stakeholders was limited and mostly
restricted to the line departments and parastatal agencies.
The pace of project execution has been found to be slow. Some states have been able to
take greater advantage of the programme than others.
Cities have also not been very successful in leveraging JNNURM funds to raise finances on
their own or to attract private or PPP-based investment.
The ULBs are not in a position to take over all the functions mentioned under 12th schedule
th
of 74 CAA at present. Most ULBs are also not in a position to take over functions like roads
and bridges, water supply sewerage, drainage and urban forestry due to their present
incapacity to do so.
Institutional strengthening and capacity buildings initiatives are yet to initiate in most of the
ULBs. Most of the ULBs are facing capacity related issues such as lack of staff (staff
recruitment has not been carried since long)
In order to give an impetus to reforms under JNNURM, the MoUD and Ministry of Housing and Urban
Poverty Alleviation (MoHUPA) have launched a new project called “Capacity Building of Urban
Development” (CBUD). The project has been launched with support from The World Bank (WB). The
GoI has received the financing from the WB /International Development Association (IDA) towards
[9]
City Development Plan Allahabad – 2041
Ministry of Urban Development
CBUD project. The broad aim of the CBUD project is to address the major constraints of urban
development and specifically focus on the capacity building requirements for successful urban
management and poverty reduction across the selected ULBs in India.
The project will contribute to GoI‟s overarching objective of creating economically productive, efficient,
equitable and responsive cities. Achieving this objective, will help sustain high rates of economic
growth, accelerate poverty reduction, and improve services, especially to the urban poor.
The project has following three components:
1. Capacity Building for Strengthened Urban Management. This component is aligned with
the infrastructure and governance sub-mission of JNNURM and will thus support technical
assistance across the several urban management topics.
2. Capacities Building for Effective Urban Poverty Monitoring and Alleviation these
capacity building initiatives are aligned with the basic services to the urban poor sub-
mission. They reflect the need for building information systems, sharing experiences, and
designing strategies on urban poverty alleviation.
3. Implementation Support. This component will support a national Project Management Unit
(PMU) for providing overall technical and managerial support during the implementation of the
Programme. The PMU will have a critical role in promoting and support the project.
1.2.1.2 Preparation of Revised CDP under CBUD Programme
In order to identify broader issues for intervention and areas of assistance pertaining to development
of city, City Development Plans (CDPs) which were already available for most of the cities under the
JnNURM is required to be revised as per the revised CDP Guidelines (April 2013) issued by Ministry
of Urban Development.
The MoUD has identified 30 cities across India under the CBUD project to facilitate the support. The
MoUD invited proposals and entrusted CRISIL Risk & Infrastructure Solutions with the responsibility of
preparing the City Development Plan.
[10]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[11]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[12]
City Development Plan Allahabad – 2041
Ministry of Urban Development
the sustainable development of the city. The CDP is the ULB‟s strategy that presents the vision of a
desired future for the city, and the mission statements on how the ULB, together with other
stakeholders, intends to work towards achieving this long-term vision. The City Development Plan
incorporates the assessment of city on majorly four levels: Socio Cultural and Economic Environment;
Physical Environment; Infrastructure Services and Institutions; Urban Poverty and Heritage.
The primary objective of this assignment is – to revise and update the existing CDP.
The scope of work in brief shall entail –
Profiling the present status of the city, giving an in-depth analysis of its demographic,
economic, financial, infrastructure, physical, environmental and institutional aspects
Based on the above analysis, the consultant shall develop a perspective and a vision for the
city, which would be prepared in consultation with its relevant stakeholders. In order to
achieve the vision, a formulation strategy for bridging the gap between where the city is at
present and where it wishes to reach need to be prepared.
The CDP should provide for a City Investment Plan (CIP), based on which the concerned
ULB will be able to access funds under central/ state government schemes as well as from
own and other sources based on priority actions and projects identified in the CDP.
The document should also provide Financial Operating Plan (FOP) to direct the ULBs for
mobilizing various financial resources to implement the identified projects. The inter-sectoral
and intra-sectoral issues need to be addressed by the CDP.
Preparation of the CDP will consist of city development strategies that will emerge out of a
structured consultative process. The process will enable elected representatives, key staff
of departments of Municipal Corporation/ Municipal Council, parastatal agencies and other
institutions, policy makers and the citizens to participate and plan for spatial, social and
economic development of the concern cities.
The CDP has to adhere to the latest revised toolkit prepared by the MOUD for CDP
preparation published on its website www.jnnurm.nic.in in Dec 2009 or later.
[13]
City Development Plan Allahabad – 2041
Ministry of Urban Development
The revised CDP has been prepared for the period of next 30 years, i.e. 2041. It is a forward-looking
consensus program for the city that outlines the path with respect to the following aspects:
Infrastructure Development – Assessment, gap analysis, arriving at investment requirement
(short term and long term) and prioritization of various services provided by Municipal Corporation
- water supply, sewerage, storm water drainage, roads, traffic & transportation, street-lighting, solid
waste management, firefighting, education, health, etc.
Slum Development – Preparation of programme for the development of slum pockets in the city.
This includes access to all the basic services as well as housing for urban poor.
Economic Development – The revised CDP focused critically on tapping the existing potential
and identifying key economic development opportunities for the city.
Social Development – The revised CDP has taken into account the social development needs of
the city such as the need for hospitals, education institutes, and recreational centers.
Institutional Development – Assessment of capacity-building required for ULBs to undertake
development of city.
Financial sustainability -The revised CDP has assessed the revenue sources, areas of
expenditure and current and future investment requirement of the city. Based on this, sustainable
investment capacity has been arrived and measures to improve revenues and control expenditures
have been suggested.
Reform Assessment Plan –The revised CDP also discussed status of various reforms
undertaken by the ULBs to bring about improvements. These reforms are in the areas of
accounting, e-Governance, property tax, user changes, building byelaws, etc. Moreover, the
approach is based on the philosophy of developing workable solutions. The methodology for
undertaking the work of preparation of revised CDP is presented in the figure below. Broadly five
steps in a sequential order have been undertaken in this work.
[14]
City Development Plan Allahabad – 2041
Ministry of Urban Development
st
Table 1.1 Review of 1 generation CDP
S.
Particular Details
No.
Demographic
1 Population (2001) 975,393*
[15]
City Development Plan Allahabad – 2041
Ministry of Urban Development
S.
Particular Details
No.
Population estimated in 2006, 2011, 2021 2006 2011 2021 2031
2
and 2031 13,36,891 16,37,269 20,43,735 24,63,893
3 Area of ULB (sq.km) 82
4 Population of Slums (2001/06) 3.30 lakhs**
Service Levels
Water Supply (Coverage, Supply Levels, Per capita supply – 200 lpcd, Source – 63% ground
1
Treatment adequacy) water, treatment plant – 135 MLD
Sewerage (Coverage, Treatment Coverage – 45%, collection – 50%, treatment
2
adequacy) adequacy – 27%
SWM (Door to door collection levels, Door to door collection – 0%, waste not treated and
3
scientific disposal, collection efficiency) dumped in dumping ground
Covers 40% of the city, but only 20% of the roads
have proper drainage network. Discharged into
4 Storm Water Drainage (coverage)
sewerage system and pumped into rivers Ganga
and Yamuna
5 Roads/ Traffic/ Transportation No indicators mentioned
*Population of area under jurisdiction of Nagar Nigam Allahabad
**slum population
3 Sewerage 416
4 SWM 53
8 Environment 15
[16]
City Development Plan Allahabad – 2041
Ministry of Urban Development
9 Tourism 122
10 Others 31
Total 3308
The estimated investment required for the identified projects would be Rs. 3308 crores. The housing
for urban poor accounted for 24% of the total investment, followed by roads and transportation sector
which accounted for 21% of the total investment.
Further, the urban renewal sector accounts for 18% of the investment; sewerage sector accounts for
13% of the investment; storm water drainage sector accounts for 11% of the investment; and water
supply for 7% of total investment. The rest of the investment is towards solid waste management,
tourism, institutional strengthening, and urban environment. The breakup of the proposed investment
has been presented in the figure below.
st
Figure 1.4 Sector wise distribution of investment proposed in 1 generation CDP
23.7% SWM
7.3% Storm Water Drainage
Others
[18]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[19]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[20]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Interim workshop:
Photographs
Final Workshop
[21]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[22]
City Development Plan Allahabad – 2041
Ministry of Urban Development
3
As per DUDA officials
[23]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[24]
City Development Plan Allahabad – 2041
Ministry of Urban Development
2.3.1 Railways
Allahabad is well-connected by railways with all major cities, viz., Kolkata, Delhi, Jaipur, Lucknow and
Mumbai, Hyderabad, Bhopal and Chennai. Several expresses as well as super-fast trains ply to and
from Allahabad.
Allahabad Junction is one of the main railway junctions of northern India. It is the headquarters of the
North Central Railway Zone. The four prominent railway stations of Allahabad are Prayag Station, City
Station at Rambagh, Daraganj Station and the main station is Allahabad Junction. Allahabad is also
connected to most cities in Uttar Pradesh such as Jhansi, Kanpur, and Lucknow. Allahabad also lies
in the path of the proposed eastern dedicated freight corridor (EDFC) which will be an economic boom
for the city in future.
[26]
City Development Plan Allahabad – 2041
Ministry of Urban Development
2.3.2 Airways
There is an airport at Bamrauli which is about 10 kilometers from Allahabad. Presently, limited flights
are available from this airport. The second nearest airport is at Varanasi that is 125 km from
Allahabad. Varanasi being another important pilgrimage is well-connected to the rest of India by daily
flights. Both private as well as public carriers operate these flights.
2.3.3 Waterway
Allahabad is the starting point of National Waterway No. 1 (NW-1), which was declared in 1986. NW-1
is a 1,620 km-long waterway between Allahabad and Haldia. Fertilizer and cement are two types of
cargos which could be transported from Phulpur, Rewa, Satna and Sidhi to the Allahabad terminal.
The alignment of the waterway is shown Figure 2.4.
[27]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[28]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[29]
City Development Plan Allahabad – 2041
Ministry of Urban Development
4
Figure 2.5 Geology map of Allahabad
Because of this topography of Allahabad, the city has grown across the rivers Yamuna and Ganga on
all the three sides, even though connectivity with the satellite towns is an issue. Though there are
settlements on the western flank of the city as well, the arterial network is weak as distance from the
core city increases. So the topography of the city has in a way hindered the growth of the city.
2.5.2 Climate
The climate of Allahabad is characterised by a long and hot summer, a fairly pleasant monsoon and
winters. The winter season usually extends from mid-November to February and is followed by
summer which continues till about the middle of June. The southwest monsoon then ushers in the
rainy season which lasts till the end of September. October and the first half of November constitute
the post-monsoon season.
4
Geology of Allahabad and assessment of recharge for sustainability by Saumya Singh and R.K.Srivastava
[30]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Temperatur 23.6 27. 33.6 39.4 42.3 40.1 34.1 32.7 33.2 33.1 29.7 24.8
e-Average 2
Maximum
Temperatur 8.7 11. 16.5 22.5 26.7 28.5 26.4 25.7 24.7 20.5 13.8 9.3
e Average 2
Minimum
Precipitation 19.2 15. 9.2 5.7 9.9 85.4 300. 307. 189. 40.1 11.7 3.4
(mm) 6 1 6 8
Source – Wikipedia.com
45
40
Temperature in degree celsius
35
30
25
20
15
10
0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Average Maximum Average Minimun
[31]
City Development Plan Allahabad – 2041
Ministry of Urban Development
5
Master plan2021
6
Statistical Handbook
[32]
City Development Plan Allahabad – 2041
Ministry of Urban Development
3. Demographic Profile
This chapter presents a detailed overview of the
Key facts in 1st generation CDP
demographic profile of the city and its overall
position with reference to the state and district.
It also describes population growth trends, AMC had a population of 9.75 lakhs as per
spatial distribution and other demographic Census 2001 and the population was
characteristics of the city. In addition to that, growing at a rate of 15.5%. The city had an
based on the past trends and potential of the average population density of 11,254
city, the future population has been estimated persons per sq. km, spread across an area
through various scientific methods. of 70.5 sq. km.
The sex ratio of Allahabad was 809 which
was lower compared to the prevailing sex
3.1 Background ratio of the state (898).
The CDP had put forward the following
Uttar Pradesh is India`s most populous state. As
observations:
per Census 2011, its population is 19.98 crore,
an increase of 20% from 2001. During 1991- High gross residential density of
2001 decade, the population increase was 26%. approximately 138 persons per ha.
In comparison, the population of Allahabad city Most of the densely populated wards were
grew from 9.75 lakhs in 2001 to 11.16 lakhs in around the railway station and the
2011 at a growth rate of 14%. The decadal peripheral areas had very low density.
population growth of Allahabad city during 2001-
11 was below the national average of 17% and state average of 20%. The population growth
gradually dropped down to 30% in 1991 and 14% in 2011. Allahabad is one of the most important
urban centres in the region because of Sangam, the high court, availability of health facilities and
employment opportunities.
[33]
City Development Plan Allahabad – 2041
Ministry of Urban Development
4,000,000
Lucknow
Varanasi
3,000,000 Meerut
2,000,000
Jhansi,
1,000,000 Gautam Buddha
Nagar
0
Allahabad (AMC limits)
Allahabad‟s decadal population growth in 2011 was 14.06% which was below the national average of
17.64%. The population growth dropped from 29.9% in 1991 to 15.5% in 2001. The population growth
is shown in the table below.
[34]
City Development Plan Allahabad – 2041
Ministry of Urban Development
1971 5,13,036
Allahabad city constitutes 20% of the district‟s population and 80% of the district‟s urban population.
Increase in population has been mainly because of migration. Migration to Allahabad city has
historically been on account of employment opportunities and for education, and this would continue
to be the most important factor.
1200000 35%
200000 5%
0 0% 0%
1971 1981 1991 2001 2011
Population Growth
When we look at Allahabad Urban Agglomeration (UA), the population in 2001 was 10.18 lakhs and it
grew to 12.12 lakhs in 2011 at a growth rate of 19%. A comparison of population growth has been
showcased in the table below. The population growth within the city limits is relatively less. So this
reflects the higher population growth on the outskirts of the city. If we look at the population of
Allahabad city and Allahabad UA, we realise that population growth is much higher outside the city
limits. So while projecting population, we will have to consider higher population growth for this area.
[35]
City Development Plan Allahabad – 2041
Ministry of Urban Development
2001 2011
Source – Census of India 1991-2011. Note: Figures in parentheses indicate CAGR of population
The list of towns in Allahabad UA along with the number of households and population are presented
in the annexure. Allahabad UA comprises the Subedarganj Railway Colony, Triveni Nagar
(N.E.C.S.W.), T.S.L.Factory, Mukta Vihar, Bharat Pump and Compressor Factory, A.D.A. Colony,
Doorbani nagar, ITI Factory and Res. Colony, Shiv Nagar, Gandhi Nagar, Manas Nagar, Industrial
Labour Colony, Gangotri Nagar, Mahewa West, Begum Bazar, Bhagal Purwa, Kodra, IOC Colony,
Deoghat, ADA Colony and Jhalwagaon, Allahabad (CB), Arail Uparhar and Chak Babura Alimabad.
8
Table 3.4 Population distribution - Ward wise
7
As per AMC records, the area of city is 70.05 sq. Km; however the area of the city as per the road map available with
Engineering Department, AMC is 71.01 sq. Km.
8
Due to non-availability of ward wise area, the ward wise population density could not be calculated
[36]
City Development Plan Allahabad – 2041
Ministry of Urban Development
27 16122 84 54 9612 67
[37]
City Development Plan Allahabad – 2041
Ministry of Urban Development
9
The population density of Allahabad is 158 persons per hectare and the number of households in the
city is 1.95 lakh, with the average household size being at 5.79. The area of the city has remained the
10
same at 70.05 sq. km . In 2001, the population density was 138 persons per hectare and average
household size was 6.70. In the 2001-2011 period, the number of households increased by 33% as
compared to 14% increase in population, thus depicting preference for nuclear families.
30000
Population Distribution
25000
20000
15000
10000
5000
0
1 3 5 7 9 1113151719212325272931333537394143454749515355575961636567697173757779
Average
Name Households Population
household size
9
As per data provided by AMC
10
As per information provided by AMC
[38]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Average
Name Households Population
household size
[39]
City Development Plan Allahabad – 2041
Ministry of Urban Development
2001 2011
Uttar Pradesh 898 912
Allahabad District 879 901
Allahabad UA 809 853
Allahabad city (AMC limits) 807 853
Source - Census of India
In spite of the city‟s high literacy rate and urbanization, the sex ratio has remained much lower than
that of the state. One of the reason for the same could be higher male in migration for employment to
the city. However, the reasons for the lower sex ratio need to be explored. The figure below shows
the sex ratio in Allahabad and Uttar Pradesh for the period between 1971 and 2011.
[40]
City Development Plan Allahabad – 2041
Ministry of Urban Development
80+
75-79
70-74
65-69
60-64
55-59
50-54
45-49
40-44
35-39
30-34
25-29
20-24
15-19
10-14
5-9
0-4
Male Female
11
Age sex pyramid for 2001 was adopted, as age-sex bifurcation as per age group was not available for 2011.
[41]
City Development Plan Allahabad – 2041
Ministry of Urban Development
3.7 Language
Since Allahabad is part of the Hindi heartland, most of the population is Hindi-speaking, i.e., ~ 88%.
The second-most common language is Urdu, which is spoken by 11% of the population.
3.9 Migration12
As per the Census of India, 2001, 15% of the total population in Allahabad UA comprises migrants.
Employment and moving with the household are two most prominent reasons for in migration to the
city. Of the 1.5 lakhs migrated into the city, 53,774 are from rural areas. They constitute 33% of the
total migrants to the city.
12
Migration details for the year 2011 are not available.
[42]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Arithmetic;
Geometric;
Incremental increase;
Exponential;
Power;
Log; and
Polynomial 2nd order.
It can be observed from the chart below that the projected population through all the methods is on
the lower side as compared to the Master Plan 2021 projections. According to the Master Plan 2021,
the growth in population for the 2011-21 decade has been assumed to be 20%. As mentioned above,
the base value in the Master Plan 2021 for 2011 was ~25% higher. So if the Census 2011 population
of 12.12 lakhs is increased by 20%, it translates into a population of 14.53 lakhs in 2021. Upon adding
the floating population (8% increase), the number works out to be 15.69 lakhs. Now if we compare
this population with the population projected by all the other methods, then it appears to be closest to
nd
the results of the Polynomial 2 Order Method. The projections by the Power, Log and Arithmetic
methods are lower than this. The projections by the Incremental and Geometric methods are higher.
The population projections made through various methods for the next three decades have been
presented in the chart and table below.
[44]
City Development Plan Allahabad – 2041
Ministry of Urban Development
35
30
25
x 100000
20
15
10
-
2021 2031 2041
[45]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Population
30
Population (x 100000)
25 24.26
20 20.13
16.48
15
Population
12.12
10 10.50
8.45
6.50
5 5.13
0
1971 1981 1991 2001 2011 2021 2031 2041
[46]
City Development Plan Allahabad – 2041
Ministry of Urban Development
4.1 Background
Allahabad has traditionally been well known for its educational institutions, the University, High Court
and centres of pilgrimage, intellectual and sociopolitical activity. The city‟s economy however, has for
the past many years been thriving on the tertiary sector activities.
With various educational institutes and university the city had been known for its publishing houses
and iron cast products like cabinets. It was highlighted during stakeholder discussions that these local
skills of the city have disappeared over time due to other high return opportunities in the city like
tertiary sector as mentioned earlier.
13
Uttar Pradesh: State Profile by PHD Chamber of Commerce and Industry
[47]
City Development Plan Allahabad – 2041
Ministry of Urban Development
In view of major transformation of industrial environment globally and within the country, the
Government of Uttar Pradesh has approved and announced the new Infrastructure and Industrial
Investment Policy-2012 with an objective of attaining the target of 11.2 percent industrial growth in
Uttar Pradesh. Significantly, to make policy execution transparent and effective all supporting
Government Orders, Notifications, amendments in Acts, rules and regulations have been made part of
14
policy document .
In the fast paced technology sector such as Electronics and Information Technology, the
characteristics which underpin the industry and services are fast technological developments,
reducing business cycle times, just-in-time and time to market. The key features include:
Interest Subsidy: 5 percent p.a for a period of 5 years on the rate of interest on loan obtained
from Bank/FIs would be reimbursed subject to a maximum of Rs 10 million per annum per unit
Stamp Duty: 100 percent exemption of stamp duty on purchase/lease of land/office space/
building
VAT: IT units having Capital investment of Rs 50 million or above would be allowed Interest free
loan equivalent to the amount of VAT and Central Sales Tax deposited every year for a period of
10 years, or 10 percent of annual sales, whichever is lower
Provision For Land: Land at rebate of 25 percent of prevailing rates at Tier II and Tier III cities;
Additional FSI :100 percent in TIER II/TIER III cities
Industrial Promotion Subsidy: Subsidy equivalent to 50 percent of incentives admissible for new
units would be admissible to existing units if additional capital investment is made for capacity
enhancement to an extent of 50 percent or more in a period of three years in Tier II/Tier III cities
Plant and Machinery for Captive Power Generation: Captive Power Generation Plants having
minimum capacity of 3 MW, and distributing the Power only within IT/ITeS/Mega Investment Unit
zones will be deemed as IT/ITeS units and they would get the incentives available for IT/ITeS units
Incentives on Case to Case basis: Projects proposed above Rs 2 billion shall be considered for
special incentives decided by the Empowered Committee
Employment Generation: 50 percent incentive on expenditure on account of contribution towards
Employee Provident Fund and Employee State Insurance schemes units employing at least 100
employees and retaining at least 75 percent locals for a period of 5 years, subject to a maximum of
25 percent of Fixed Capital Investment
Single Window Clearance: A Government Body under Chairmanship of Principal Secretary, IT &
Electronics, UP for clearances like Pollution, Power Allocation etc.
Uninterrupted Power Supply: IT unit‟s setup in IT Cities / IT Parks on Independent Feeder shall
be provided uninterrupted power supply from State Utility. The cost of provision of separate Feeder
from the Transmission substation will be borne by the Unit/IT City/ IT Park
IT Corpus: Each Department shall earmark a minimum of 2 percent or as per directions of
Government of Uttar Pradesh from time to time of its Plan budget for IT applications
[48]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Uttar Pradesh Energy Policy 2009 is structured with consumers as the focal point & aims at fulfillment
of the overall need for universal access and for providing reliable, quality & affordable power. The key
features include:
Access to electricity to all households in next 5 years
Power demand to be fully met by 2014. Energy and peaking shortages to be overcome and
adequate spinning reserve to be available
Supply of reliable and quality power of specified standards in an efficient manner and at
reasonable rates
Per capita availability of electricity to be increased to over 1,000 units by 2017
Financial turnaround and commercial viability of electricity sector thereby reducing the
financing burden on the state over a period of time while recognizing the fact that during the
initial transition period, state support would be a key determinant for the success of entire
exercise
To increase the availability of power by:
encouraging augmentation of environment friendly generating capacity
sourcing competitive and reliable bulk power from sources both within and outside the
state
encouraging developers to enter into MoU for generation and supply of power to the state
in cases where the developer has tied up or has taken steps to tie up coal, water and has
arranged land on his own or with the help of the state government.
Optimization of generation of existing plants by putting up additional units, through renovation
and modernization or by changing configuration of machines in case of plants under
commissioning or by allowing alternative fuel for seasonal generating units particularly those
based on bagasse or bio mass
To augment the transmission and distribution capacity and refurbish the existing capacity with
a view to improving efficiencies, reliability & quality of supply and reducing losses
To facilitate consumers benefiting from competition & towards this end encourage private
sector participation in all areas viz. generation, transmission, distribution, trading and R&M
To support the Uttar Pradesh Electricity Regulatory Commission with all policy and other
administrative measures with a view to ushering in a rationalized tariff framework with efficient
distribution of subsidies
[49]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Tourism: Allahabad has traditionally been a centre of pilgrimage. It is flocked by tourists from across
the globe. Millions of pilgrims congregate on the bank of these rivers during famous occasion of
twelve yearly Poorn Kumbh Mela and six yearly „Ardh Kumbh Mela‟ yearly Magh Mela and on many
other religious occasions at various sacred periods of the year.
The city is also a premier nucleus of urban, Judiciary, administrative, educational and industrial
activities of the state. The city enjoys a unique advantage within the transport network in the country
as it is well connected by the both surface and air transport modes with all major centers of the
country and the states.
Education: Allahabad becomes a premier educational centre with first along vernacular school
established in the year 1836. A number of colleges, the University of Allahabad, MNIT, IIIT and other
educational Institutions came in to being subsequently.
Majority of the existing units are agro, garment, metal fabrication, engineering units or transport
15
equipment repair based industries . Some of the large scale industries are –
BPCL
Reliance India Limited, Naini
15
District Industrial Profile of Allahabad District, Ministry of MSME, Government of India
[50]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[51]
City Development Plan Allahabad – 2041
Ministry of Urban Development
General Merchandise: The establishments dealing with general merchandise occur continuously as
a stretch along the GT National Highway, whereas in Johnstonganj these occur in association with
other shops.
Oil and Ghee Mandi: The wholesale mandi for oil and ghee is situated in Meerganj providing all sorts
of vegetable cooking oils and ghee. All these are of wholesale nature.
Timber/ Furniture Mandi: The furniture mandi as it is called extends right along the Tilak Road to
Bharati Bhawan Road crossing and from there to Suleman Sari Road. This area is also referred to as
Bans Mandi, for nearly all timber is supplied from here.
Fruits and Vegetables Market: The main vegetable wholesale market is located in Khuldabad
outside the core area of Chowk. It enjoys a strategic location lying on the GT National Highway.
Report on Conditions of Work and Promotion of Livelihoods in the Unorganized Sector, 2007 of the
National Commission for Enterprises in the Unorganized Sector (NCEUS), suggest that the vendors‟
earnings are very low although they vary from trade to trade and from location to location. The men‟s
average daily income is around Rs. 70 in most cities and women earn considerably less – Rs. 40 per
day.
Articles 39 (a) of the Constitution clearly mention that the State shall in particular direct its policy so
that - (a) the citizens, men and women equally, have the right to an adequate means of livelihood. To
improve the condition of urban street vendors, Government of India made numerous legislative
attempts starting from the regulation of hawker trade in Bombay Municipal Corporation in 1980 till The
Street Vendors (Protection of Livelihood and Regulation of Street Vending) Act, 2014.
[52]
City Development Plan Allahabad – 2041
Ministry of Urban Development
16
Of the major attempts made, The National Policy on Urban Street Vendors, 2009 was a
comprehensive attempt that promoted spatial, legal and participative means of improving the
conditions of the urban street vendors. According to this policy, a 'Street Vendor' is defined as 'a
person who offers goods or services for sale to the public in a street without having a permanent built-
up structure.' The policy was somewhat similar to its predecessor and got a feeble response from the
states, to overcome the shortcomings of this policy a draft bill entitled „Model Street Vendors
(Protection of Livelihood and Regulation of Street Vending) Bill, 2009 was introduced but
Governments did not take sufficient legislative action. However, the Bill was critiqued to have ignored
many pressing issues. The foremost problem that it overlooked was the issue of natural markets
which sprang up in places where consumers found them useful. Further, it ignored the vending rights
of those who were already selling on the street, still the policy was somewhat able to recognize
certain issues related to the street vendors and has provided certain powers to ULBs to regulate,
monitor and promote street vendors in towns / cities.
The policy recognized and explicated the positive role of street vendors in providing essential
commodities to people at affordable prices and at convenient places. It also recognized the need for
regulation of street vending by way of designated „Restriction-free Vending‟, 'Restricted Vending' and
„No Vending‟ zones based on certain objective principles. Overall the Policy meant to foster a
congenial environment for the urban street vendors to carry out their vocation and at the same time
ensuring that it does not lead to overcrowding or unsanitary conditions at public spaces and streets.
16
In 2004, the National Urban Street Vendors Policy (NSVP) was announced. It was the first national level regulatory
framework on street vending which was left to the States to adopt and implement. In 2009, the NSVP was revised and a Model
Draft Bill on the subject was presented by the Central government. The States and Union Territories were to implement the
National Policy for Street Vendors of 2004, taking into account this Model Bill. However, it received a feeble response from the
States and soon demands were made for a mandatory central legislation on the subject. (National University of Juridical
Sciences, 2012)
17
In spite of the government‟s fervent concern regarding public sanitation and safety, a number of public events, bazaars,
religious festivals and other activities take place on our streets with the whole-hearted approval of government authorities.
[53]
City Development Plan Allahabad – 2041
Ministry of Urban Development
carts, electricity, drinking water facility, protective covers to protect their wares as well as
themselves from heat, rain and dust and Storage facilities including cold storage.
III. Regulatory Process: The policy thrusts on having the system of registration of hawkers and non-
discretionary regulation of access to public spaces in accordance with the planning standards and
18
nature of trade/ service. The Town vending committee / Ward vending Committee has the
19
power to register the vendors . All vendors in each city should be registered at a nominal fee and
the registration should be renewed after every three years. The TVC should issue identity cards to
the vendors and it should charge a monthly fee for access to various services. For better system
of regulation, there should be direct linkage between the urban local bodies (ULBs) and hawkers
20
for collection of: registration fee, · monthly maintenance charges , fines, if any, etc. The Town
vending Committee / Ward Committee should monitor the hawking activity of a particular ward
and the quality of the services provided, take corrective action, if required, report to City level
21
Committee, if required and recommend revaluation / changes in specified norms for hawking.
18
The committee has no fixed tenure and there is no removal mechanism mentioned.
19
The National Policy on Urban Street Vendors, 2009. Under Provision 4.5.4 of this Policy, the Municipal Authority is under an
obligation to undertake a comprehensive census of the existing vendors in consultation with the Town Vending Committee for
the purpose of granting them lease to vend. Hence, we see that here the burden of registration is on the Municipality, which
significantly smoothens the exercise of registration and to a large extent simplifies the process for street vendors.
20
Every street vendor is under an obligation to pay periodic maintenance charges for the civic amenities and facilities provided
in the vending zone as may be determined by the local authority. Thus, these provisions impose a monetary burden on street
vendors.
21
Concentration of powers in the hands of the municipal authorities that do not have any representation of street vendors.
[54]
City Development Plan Allahabad – 2041
Ministry of Urban Development
15%
26% Main workers
Workers
Non-workers Marginal
74% workers
85%
The table below gives gender classification of workers in different categories. It shows that
approximately 22% of total workers are females, while approximately 58% of non-workers are
females. This shows lack of employment opportunities for women, as majority of the female workforce
are non-workers.
[55]
City Development Plan Allahabad – 2041
Ministry of Urban Development
50.00 42.64%
40.00
Growth rate in %
30.00 24.41%
20.00
10.00
-3.67%
0.00
1991 2001 2011
-10.00
Primary
200.00
158.04%
150.00
Growth rate in %
100.00
50.00
-2.21%
0.00
1991 2001 2011
-50.00 -70.12%
-100.00
Secondary
[56]
City Development Plan Allahabad – 2041
Ministry of Urban Development
60.00 50.77%
50.00
Gorwth rate in %
36.69%
40.00 32.32%
30.00
20.00
10.00
0.00
1991 2001 2011
Tertiary
Overall, there was a shift from the primary sector to the tertiary and secondary sector during the
decade 1981 to 2001. However, the trend has reversed in the present decade because of merging of
new areas which are primarily engaged in agriculture. Except for the decade 1991 to 2001, there has
been very high negative growth in the secondary sector. The tertiary sector has emerged as a major
contributor to the economy in the last three decades. As indicated in the figure below, the growth rate
in total main workers was nominal during 2001. This indicates that the city was on the verge of getting
saturated. The increase in jurisdiction would be an advantage for the city as it would open new
opportunities for exploration.
400000
350000
Workers distribution
300000
250000
200000
150000
100000
50000
0
1981 1991 2001 2011
Tertiary 120027 164061 217080 327286
Secondary 38522 37669 97200 29048
Primary 8110 10090 9720 13865
[57]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Allahabad is the pilgrim town for India with important religious destination such as Sangam
Ghat‟s, Ashoka pillars and other historic places of importance.
Lack of infrastructure facilities like quality of existing roads and tourist infrastructure (rest
rooms, hotels, information center, etc.
As the city is an important religious destination for Hindus and is likely to continue to attract
more visitors in future there is an opportunity to develop it as a tourism base for the region.
Lack of tourist infrastructure is a severe deterrent for the role of the city to play as a tourist
destination which needs to be looked into for the economic growth of the city.
[58]
City Development Plan Allahabad – 2041
Ministry of Urban Development
5.1 Background
Allahabad‟s reference is as old as the Hindu Puranas. In the „Padam Puran,‟ Prayad also known as
Allahabad has been referred to as the best among all pilgrimages, as Brahama, the creator god chose
this land to perform the „Prakrista Yog‟. Prayag is the birthplace of Som, Varuna and Prjapati. Prayag
has been associated with mythological personalities in Brahmanical (Vedic) and Buddhist Literatures.
It was the seat of the great sage Bhardwaj, sage Durvasa and sage Panas. Sage Bhardwaj lived here
circa 5000 BC and taught more than 10,000 disciples.
The earliest monument of antiques, the Ashok Pillar, has inscriptions of third century BC – the
inscriptions of his directions to his fellow rajas and praise of King Samudragupta. The Chinese
traveller Huan Tsang in 643 BC found Prayag to be inhabited by many Hindus who regarded the
place as holy.
[59]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[60]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[61]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[62]
City Development Plan Allahabad – 2041
Ministry of Urban Development
30000
25000
20000
15000
10000
5000
0
1 3 5 7 9 1113151719212325272931333537394143454749515355575961636567697173757779
Population
[63]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[64]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Land use proposals for commercial, industrial, recreational, transportation, health and education is
lesser than the proposed land use as per the draft URDPFI guidelines. The observations on
comparing the two master plans are:
Land allocation for industrial purposes is less than the proposed land use in Master Plan
2001. Even though the land allocated for industrial use is less, only 40% of this allocated land
is being used. This supports the claim that the industrial base of Allahabad is weak and steps
need to be taken to promote industry by addressing infrastructure and policy issues.
The land allocation for public utilities such as water supply, sewerage and electricity services
has been reduced from 16.60 sq. km to 6.90 sq. km. As per the master plan, the area has
been reduced as earlier proposals for sewerage which required more land have been
dropped. So the land requirement for public utilities has reduced.
Only 3% of the land use for recreational purpose has been developed.
Land allocation for health and education is less than the proposed URDPFI guidelines.
Land use under recreation is higher because the Kumb Mela area has been merged into it.
Table 5.4 Comparison of land use as proposed and actually developed during the 2001 master
plans
[54]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Widening of junctions - 40
Development of new roads as per Master Plan. A list has been enclosed as annexure
Three Ring road
Improvement of rail underpass – 7
Bridges on Yamuna – One for outer bye-pass road and the other for inner bye-pass road
Bridges on Ganga – 1
Rail and road bridge on Ganga
Bus terminal - 7
Truck terminal – 3
[55]
City Development Plan Allahabad – 2041
Ministry of Urban Development
6. Social Infrastructure
This chapter presents a detailed assessment of Allahabad‟s social and cultural environment, which
includes health services, education status, and role of various agencies involved in service
provisioning. The key findings of the analysis indicate the status of Allahabad city in terms of health,
education, and recreation service provision. The existing facility has been compared with Urban and
Regional Development Plan Formulation Implementation (URDPFI) guidelines to arrive at the gaps in
service provision.
6.1 Background
Allahabad is considered to be a hub for health facilities in the region. Due to the availability of better
facilities in Allahabad, the city healthcare facilities have a large catchment area. Also, the city is an
administrative headquarters, religious centre, and homes several educational institutions and the
state high court.
[56]
City Development Plan Allahabad – 2041
Ministry of Urban Development
The institutional arrangement of the healthcare department is illustrated below. At the division level,
the department is headed by the Additional Director and the administrative work of each district is
looked after by the Chief Medical Officer (CMO). The hospitals are headed by the Chief Medical
Superintendent (CMS).
Additional
Director
CMO CMS
Medical
Additional CMO
Superintendent
Medical Officer
Incharge
Primary healthcare
3 Dispensary 30
5 ESI Dispensary 7
[57]
City Development Plan Allahabad – 2041
Ministry of Urban Development
3 ESI Hospital 1
4 Railways Hospital 2
5 Defense Hospital 3
Private
[58]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[59]
City Development Plan Allahabad – 2041
Ministry of Urban Development
3 High school 44
5 Degree college 84
[60]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Fire Man
[61]
City Development Plan Allahabad – 2041
Ministry of Urban Development
6.5.1 Norms and Standard as per the UDPFI guidelines for Social
Infrastructure
The gap analysis below is on the basis of only government health institutions, as the break up for
private healthcare institutions is not available. All private nursing homes, hospitals etc. are classified
under one head.
Sr. No. Category As per draft URDPFI guidelines, 2014 Existing number Gap
1 dispensary for every 15,000 persons
1 Dispensary 37 125
Total dispensaries as per norm – 162
1 hospital for every 45,000 to 1 lakh
Small hospitals persons
2 15 39
(30 bed)
Total hospitals as per norm –54
1 hospital with a capacity of 200 beds
Multi-Specialty for every 1 lakh persons
3 12 12
Hospital
Total hospitals as per norm – 24
Sr. No. Category As per draft URDPFI guidelines, 2014 Existing number Gap
[62]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Education
A fire safety plan has been prepared; however, it has been pending for approval for a long
time with the state government.
A study was undertaken by UP fire services during the Kumbh mela and it came to the
forefront that the department would not have been in a position to provide sufficient service
had there been a disaster
The reaction time in the case of an emergency is high and may lead to loss of life and
property.
E-governance and automation are important. However, these have not been adopted.
Existing fire hydrants have failed to reach the spot in time due to encroachments and traffic
issues.
[63]
City Development Plan Allahabad – 2041
Ministry of Urban Development
According to the 74th Constitutional Amendment Act of India, three levels of local bodies have been
established; one of their objectives is to provide supply of pure drinking water and proper sewerage
facilities to citizens. AMC is responsible for the provision of basic services such as water supply,
sewerage, SWM, SWD and roads within the AMC limits. DUDA is responsible for the provision of
housing in slum areas and UP Jal Nigam is responsible for the planning and construction of water
supply, sewerage and storm water drains. This section provides a snapshot of the pre-JnNURM
scenario and the key highlights of each sector based on the earlier CDP. It links progress made under
each sector with the existing situation.
1 Lukerganj
3 Atala
6 Colonelganj
Tube wells
7 Daraganj
8 Rasoolbad
10 Naini
[64]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Allahabad is bounded by rivers i.e., by Ganga and Yamuna on three sides, hence, ample water is
available to the city. The city is supplied with 308 MLD of water, of which the majority is lifted by tube
wells and the remaining from river Yamuna. Ground water is the main source of water, which supplies
77% of the total water supply. 23% of the water is supplied by River Yamuna. An intake raw water
pumping station is located on the banks of River Yamuna at Kerela Bagh, where pumps transport
water to the Khusroobagh water works through pumping mains along the Nurullah Road. The water
supply per capita is 253 lpcd, which is much higher than the required norms. The high water supply is
available due to the perennial source, i.e., River Yamuna.
In slums, there are in all 1,273 public taps, 2,383 hand pumps, and 207 tube wells. In some slums,
AMC supplies water through 22 water tankers. However, there are no direct water supply
connections.
The city has a total storage capacity of 22.5 MLD. This storage capacity is provided by three
underground storage tanks and 15 overhead tanks. The location of these reservoirs and OHTs is as
given below:
[65]
City Development Plan Allahabad – 2041
Ministry of Urban Development
7 Allapur 2 OHT
12 Rajrooppur 1 OHT
18 Kalindipuram 2 OHT
Water is treated and fed into the distribution network of 1,122 km length. The quality of water is
reported to be of acceptable standard and as per Jal Kal officials it does not require any special
treatment other than standard treatment, like filtration followed by chlorination in the case of surface
water and only chlorination in the case of ground water, to bring the water quality to the potable
standard.
Existing raw water transmission arranged from the intake tower comprises two 500 mm dia C.I. mains
originating from towers and connected at a distance of about 60 m from towers and converted into
two C.I. transmission mains of the following sizes.
[66]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Jal Kal supplies water throughout the year with supply hours varying between 6 to 10 hours a day.
The following table gives a snapshot of the water distribution setup of Allahabad.
Currently, an operational water treatment plant is located in Khusroobagh and has a capacity of
treating 135 MLD of raw water. Presently, the plant is running at 50% capacity and it uses rapid
gravity filtration process for treatment.
7.1.1.3 Water distribution System Consumer connections and metering system and policy
There are over 1.51 lakh household, commercial and industrial connections in Allahabad; however,
only 1% of them are metered. This represents overall household-level coverage of 73%. The following
figure gives a snapshot of the overall sources, treatment, storage, and distribution network of
Allahabad water services.
1 Metered Connection
i Domestic - - - - - -
ii Non-domestic - - - - - -
iv Industrial - - - - - -
Total metered
2 1082 1100 1140 1180 1200 1230
connection (i to iv)
Total non-metered
3 139,686 142,473 144,298 146,213 147,993 149,863
connection
[67]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Though AMC has adopted a volumetric-based tariff structure, it has not been implemented yet. The
flat rate water supply bill is calculated based on ferrule size and different slabs of ARV for residential
and commercial property. Currently, water charge is calculated as 12.5% of ARV. This is based on a
notification issued in 1999 by the Government of Uttar Pradesh. Thereafter, user charges have been
increased by 5% at a regular interval of three years. Owing to such methods, water charges of old
properties have been reduced irrespective of water use.
15 mm 20 mm 25 mm
Sr. No. Property tax Slab
Water Tariff Rs. Per connection/Month
Sr. MOUD
Indicator Value Benchmark
No
Coverage of water supply connections
1 (Total no. of connections – 151,093; Total no. of properties – 73% 100%
206,784)
Per capita supply of water
2 253 LPCD 135 LPCD
(Total water supply – 308 MLD; Population – 1,216,719)
Extent of metering of water connections
3 (No. of metered connections – 1,230; Total connections – 1% 100%
151,093)
Extent of non-revenue water
4 30% 20%
(As per estimates of AMC)
5 Continuity of water supply 10 hours 24 hours
[68]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Sr. MOUD
Indicator Value Benchmark
No
*for both water supply and sewerage)
Efficiency in collection of water supply related charges
9 73% 90%
(Collection – Rs. 39.07 crores; Demand – Rs. 53.51 crores)
O&M Expenses (Rs. Lakhs) 3019.52 3242.49 3723.99 4239.78 4754.71 4832.45
Even though the cost recovery improved on account of an increase in revenue base, collection
efficiency has not improved over the same six-year period, as is evident from the table below.
[69]
City Development Plan Allahabad – 2041
Ministry of Urban Development
7.1.3 Critical Analysis of water Supply System post- 1st Generation CDP
Scenario
st
The 1 generation CDP was prepared in year 2006. The box below provides an overview of the water
st
supply system at the time of preparation of the 1 generation CDP.
Sources of water Total of 217 MLD water supplied within the municipal limits
supply Major source of water is the ground water
80 MLD – surface water, River Yamuna pumped at Karelibagh
raw water pumping station
137 MLD from tube wells (underground water)
54 MLD from private pumps (not in JS and JN records)
Water treatment Total capacity of treatment – 135 MLD
Water treatment plant at Khusroobagh
WTP serving 35% need for clear water
Storage and 15 OHTs
distribution system 4,550 stand posts
Total 1,099 km of pipeline
House service
1,16,954 domestic connections and 1,800 nondomestic water
connections
connections. There is no distribution network in the slum areas
Per capita
Water supply duration: 10 hours in three shifts
consumption /
duration of water Total water demand including losses and floating population –
supply 267 MLD
Per capita water supply – 200 LPCD
st
Key findings during 1 generation CDP
23% of the total water demand is from institutional, industrial and floating population.
Reconnaissance survey suggested there are leakages in the pipeline, causing low pressures
and losses.
Water supply losses accounted was very high at 40% (unaccounted-for water supply)
[70]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Fall in water level of Yamuna during summers. This has adversely affected the intake of two
wells of the Kareli bagh raw water pumping station.
There are frequent power failures for prolonged periods, causing severe damage to the water
supply system as well as the operational schedule.
A number of components in the system have inadequate capacity. This includes raw water
pumping mains, clear water reservoirs in Khushroobagh, water works, zonal overhead tanks,
and pipelines at various places.
Such deficiency in system provisions leads to poor level of supply to consumers.
Accordingly, to improve the water supply system, the CDP envisaged an investment of Rs. 243
crores, covering the following aspects: renovation of the existing system, network expansion of
transmission mains, and construction of storage tanks and water treatment plant.
[71]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[72]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Parameters Details
8 Tariff structure
8b If property does not have water supply connection Rs. 20 per month per seat
No details are available with the concerned departments (Jal Nigam and Jal Kal) with regard to the
size of the sewer lines, number and size of the manholes, length and diameter of pipes between the
manholes, condition of sewer pipes and their age, and the slope of the lines and their carrying
capacity. In areas where a sewerage system is not available, water flows through unlined, irregular
drains and ultimately joins the rivers Ganga and Yamuna at different locations. The households,
which have no access to a sewerage collection system, discharge their wastes directly into streets
drains and ultimately into the rivers through unlined nallas/ drains.
7.2.1.1 Sewage generation and collection system
Sewage generation depends on the water supplied and it is generally considered to amount to eighty
percent of the water supply. It is essential to look at the water supply situation within AMC to assess
[73]
City Development Plan Allahabad – 2041
Ministry of Urban Development
sewage generation. Since 308 MLD of water is supplied, it can be assumed that sewerage generated
is 260 MLD. However, Jal Nigam estimates sewerage generation to be 260 MLD.
Allahabad city has only 22% coverage by a sewerage network, with 44,300 households practicing
onsite sanitary disposal methods. Many households have septic tanks or kunddis. There is a lack of
sewage treatment facilities in the city and therefore most of the sewerage goes into open drains and
nallas.
In most of the households, the toilet flushes are not connected to soak pits and the water from septic
tanks goes directly into drains, which is very unhygienic. Most of the city drainage system is clogged
with polythene bags and is not cleaned regularly. The condition of the city drainage system is poor
and needs immediate repairs and regular upkeep/maintenance. Many large drains are being
encroached by dwelling units, milk diaries, shops, etc. and thus difficult to clean and maintain.
22
The system includes about 595 km of major sewers and branches of various sizes, shapes and
material. There are seven intermediate sewage pumping stations; one terminal pumping station is
located at Gaughat and the sewage farm areas are in Naini and Dandi. The sewer network system is
a combined sewer overflow system carrying both wastewater and storm water in most locations. Most
22
Jal Nigam, Allahabad
[74]
City Development Plan Allahabad – 2041
Ministry of Urban Development
of the existing sewers are old brick sewers which have outlived their design life. The hydraulic
capacities are insufficient even for the present flows and moreover existing lines have heavy silt
depositions. The pumping stations are also of various configurations, some of which are very old and
need major renovation. The areas under each of the seven zones are shown in the table below.
Goughat A 1321
Alopibagh B 874
Katra C 647
Naini E 928
Teliarganj F 186
Phaphamau G 1382
The total sewerage treatment capacity is 254 MLD. As per the City Sanitation Plan, Allahabad, there
is an acute scarcity of wastewater treatment plants in the city; but the quality of treated waste water is
not good. The condition of the existing pumping stations too is not good.
The list of the STPs along with their treatment capacity is given in the table below.
1 Numaha Dahi 50
[75]
City Development Plan Allahabad – 2041
Ministry of Urban Development
2 Naini 80
3 Rajapur 60
4 Kodra 25
5 Ponghat 10
6 Salori 29
Total 254
MOUD
Sr. No. Indicator Value
Benchmarks
Data not
1 Coverage of toilets 100%
available
Coverage of sewerage network services
2 22% 100%
(No. of connections – 44,000; No. of households – 1.95 lakhs)
Collection efficiency of sewerage network
3 (Sewerage treated – 254 MLD; Sewerage generated - 260 99%* 100%
MLD)
Adequacy of sewerage treatment capacity
4 (Sewerage treated – 254 MLD; Sewerage generated- 260 99%* 100%
MLD)
Data not
5 Quality of sewerage treatment 100%
available
Extent of reuse and recycling of Sewerage
6 0% 20%
(The treated sewerage is not of reusable grade. Hence, it is
discharged in water bodies)
Extent of cost recovery in Sewerage management
(Income – Rs. 39.07* crores and Expenditure – Rs. 48.32*
7 81% 100%
crores
*for both water supply and sewerage)
[76]
City Development Plan Allahabad – 2041
Ministry of Urban Development
MOUD
Sr. No. Indicator Value
Benchmarks
Data not
8 Efficiency in redressal of customer complaints 80%
available
Efficiency in collection of sewerage related charges
9 73% 90%
(Collection – Rs. 39.07 crores; Demand – Rs. 53.51 crores)
*Same volume of sewerage is collected and treated. Hence collection efficiency and adequacy of
sewerage treatment capacity is the same
Allahabad city has in all 131 urinals and 324 community/public toilets with 4,423 toilet seats in the
various zones. The number of users per toilet seat is 150 as against the stipulated norm of one toilet
23
seat in 35 users .
Alarmingly, there is no proper arrangement for septage management in the city; only one septage
suction machine is available with AMC which is insufficient considering the number of households and
public toilets (27) connected to the septic tank.
A significant part of the city's residential population along with the floating population which assembles
during various religious occasions is provided with community toilets. Such toilets are located mainly
in the mohallas inhabited by the people of economically weaker sections, in bus stands, ghats and
other religious centers where large assemblies of floating population occur.
24 community toilet complexes – 22 with 10 seats each and remaining 2 with 24 seats each – have
been constructed under the Ganga Action Plan. These are situated mostly along the river banks near
ghats.
23
City Sanitation Plan, Allahabad
[77]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Sewage Total waste water measured from open drains and STP was 213.3
generation MLD (2006).
Sewerage System
A total of 502.16 km length of sewer line is laid to cover the service
area.
Most of the sewer system is however very old and already lived its
design life.
Sewage
60% wastewater meets the two rivers without treatment.
Treatment Plant
56 wards are covered with this system making it 7,047 ha of service
area.
Network
The city has been divided into 7 sewerage districts.
Coverage
Each district is sub-divided into 1-2 sub-districts/ zones and has its own
sewage treatment works.
[78]
City Development Plan Allahabad – 2041
Ministry of Urban Development
45% of the city, mostly the old city, i.e., the densely populated core, has
been covered by 299.00 km-long sewerage network; the rest 55% area
does not have any wastewater collection system.
House service
In all, 65,028 houses have access to the system.
connections
The households, where sewerage collection system does not exist,
discharge their wastes directly to street drains.
57 unlined drains (kutcha nallas) carry sewage from the entire city to
the rivers Ganga and Yamuna.
st
Key issues identified in 1 generation CDP
The bulk of the branch sewerage system is at any time either completely blocked or its
capacity is severely reduced by silt and solid waste. Sewer maintenance is restricted to
emergency clearing of blockages and is given low priority.
It has been observed that sections of trunk sewers are heavily silted. Reduced capacity from
silting results in sewage overflows from manholes to surface drains during peak flow periods.
Problems may also be caused by structural damage in some sections.
Poor record-keeping and inadequate information for planning: The limited availability of
records relating to pumping stations and the sewerage system makes planning for extending
services and assessing the amount of sewage presently flowing into the sewer system
difficult. This also prevents effective maintenance and corrective actions.
Accordingly, to improve the sewerage system, the CDP envisaged an investment of Rs. 377 crores
covering the following aspects: renovation of the existing system, network expansion, and
construction of treatment plants, branch sewers and community toilets.
[79]
City Development Plan Allahabad – 2041
Ministry of Urban Development
The main focus of the Plan was on Interception & Diversion and treatment of sewage through 261
schemes spread over 25 Class I towns of U.P., Bihar and West Bengal. Nearly 34 Sewage Treatment
Plants (STPs) with a treatment capacity of 869 MLD have been set up under the Plan, which was
completed in March 2000 at a cost of Rs. 452 crores. The Schemes completed under GAP-I in the
district of Allahabad city are summarized below:
Renovation of Gaughat Main Sewage Pumping Station
Renovation of Intermediate Sewage Pumping Stations
Relieving sewer in Kydganj area
Daraganj sewer and Sewage Pumping Station
Relieving sewer in Daraganj area
Tapping of Mumfordganj nala
Tapping of Chachar nala
Partial tapping of Ghaghar nala
60 MLD sewage treatment works at Naini based on Activated Sludge Process
[80]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[81]
City Development Plan Allahabad – 2041
Ministry of Urban Development
managing the treatment plant and AMC is now making efforts to operationalize the treatment plant
and ensure scientific dumping of waste.
The slaughter house in Allahabad is situated at Atala is an open slaughter house and almost 100 year
old. At this place about 90 animals are slaughtered every day in the open and then the raw meat is
being transported to other places. The slaughtered animal‟s solid waste is thrown and dumped in the
open and the liquid waste is washed away and discharged in the kuccha Nallas around the
slaughtering area. This area is totally polluted with foul smell, filth and flies all around. The state of this
area is so pathetic that one cannot stand there. In the whole area no separate drainage for waste
generated in slaughter house and the condition of this place become worse during the rainy season.
There is no systematic arrangement of cleaning/maintenance. The waste is dumped in the open; AMC
is entitled with the management of this slaughter house. There is no detail record maintained and
available with AMC for quantity of waste generated from slaughter house
Under the Municipal Act, road/ street sweeping and drain cleaning are the obligatory responsibilities
of the AMC and the solid waste generated in the town shall be collected and removed by the sanitary
workers. Street sweeping in AMC area is carried out through 2200 sanitation workers.
The waste from drain silt and waste heaps from roadsides are collected and disposed-off at nearby
open dumps. These unorganized disposal methods have resulted in accumulation of solid waste on
roadsides and vacant plots and in low lying areas and storm water drains
24
The solid waste of slaughter houses can be broadly classified into two categories i.e., vegetable matter such as rumen,
stomach and intestine contents, dung, agriculture residues etc., and animal matter like inedible offal’s, tissues, meat
trimmings, waste and condemned meat, bones etc.,. Slaughter house waste contains mostly biodegradable matter
[82]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Primary collection
Door-to-door collection is not being carried. Waste is thrown outside the property from where
sweepers of AMC collect waste by means of rickshaw trolley and dump the same into the dustbins or
onto streets (open dump). In some of the cases, generators themselves dispose-off waste in nearby
waste collection points/ containers, onto the streets, or in the nearby drains.
The practice of throwing the wastes into the streets and drains is more prevalent in case of many
households in the city as well as within the community of small restaurants and eateries; this
unhygienic practice has resulted in clogging of drains. Excessive polythene has also emerged out to
be one of the reasons for frequent clogging of drains.
Secondary collection
The waste collected from each of the primary collection
points mentioned above is transported to designated open
dump areas and DP containers (mostly on the main roads),
which are the secondary collection points. There are nearly
50 such points and about 160 bins spread over all 80 wards
of the city. The waste collection from the secondary
collection points starts by Dumpers and Tractor trolleys from
8 A.M and goes on till 5 PM in the evening.
There are 800 CP bins and 90 DP bins across the city.
However, the secondary collection points are not maintained
property. Many a times, the bins are overflowing with waste
or waste is littered around the bin.
Transportation
Waste is being transported by AMC from selection collection points to a treatment site located at a
distance of 19 Km from the city. The vehicles available for transporting waste are as follows –
1 Tippers 10
2 Dumper placer 4
3 Compactor 12
Total 26
Source - AMC
The waste transportation vehicles are operated, supervised and maintained at workshop located in
front of railway station (south side). The workshop is supervised by workshop in charge. At present
this responsibility is given to Junior Engineer. The transportation vehicles make two to three trips per
day to transport the waste to the treatment site. It takes about 1.5 to 2.0 hours to make a trip
depending on the traffic conditions. The waste is transported in open vehicles and this creates
unhygienic conditions in the city.
[83]
City Development Plan Allahabad – 2041
Ministry of Urban Development
User charge schedule has been approved by AMC. However, AMC is facing resistance from the users
in paying is user charges. Due to this, the revenue generated is very less. Details in this regard are
not available. The user charge schedule is as follows-
Residential Commercial
Source-AMC
MOUD
Sr. No. Benchmark details Current status
benchmark
[84]
City Development Plan Allahabad – 2041
Ministry of Urban Development
MOUD
Sr. No. Benchmark details Current status
benchmark
[85]
City Development Plan Allahabad – 2041
Ministry of Urban Development
areas.
Accordingly, to improve the solid waste management system, the CDP envisaged an investment Rs.
28 crores covering following aspects: bins, containers, vehicles, treatment plant and landfill.
25
City Sanitation Plan, Allahabad
[86]
City Development Plan Allahabad – 2041
Ministry of Urban Development
The storm water flows with the sewage through sewerage network and is pumped to rivers Ganga
and Yamuna. This causes extra burden over the sewage pumps during rains and extra expenses due
to consumption of electricity. This causes a substantial quantity of silt and debris into the sewer
system which is detrimental to its life and proper function. In addition, it leads to flooding and hydraulic
overloads at treatment plants. The nala-tapping arrangements are essential for intercepting
wastewater during dry weather and reducing pollution loads, however the present tapping
arrangements are inadequate. Such nala tapping arrangements are considered as interim measures
only and should be phased out gradually with the improvement in sewerage coverage into all urban
areas. Furthermore each tapping point should have a means of automatically regulating the inflow
during wet weather.
[87]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Network Primary: six major drains passing through the municipal area, viz. –
Ghaghar, Chachar, Morigate, Allenganj, Rajapur, and Mumfordganj
Only 20% of the roads and gullies in residential localities have proper
drains.
The silt in these nallas is usually cleaned once every year while the
normal prescribed practice is to clean them twice.
Treatment plant Large quantities of storm water cause flooding and hydraulic overloads
on the treatment plant.
Due to the combined system of sewerage and storm water drainage, a
substantial quantity of silt and debris is drained into the sewer system
Institutional City has been divided into the six storm water planning zones and each
arrangement zone is identified by the pumping station or the channel dealing with its
discharge.
st
The 1 generation CDP proposed projects worth Rs 355 Cr. However, the projects were not
undertaken.
[88]
City Development Plan Allahabad – 2041
Ministry of Urban Development
In monsoons the sewerage system also acts as storm water drainage, thus substantial quantity of
silt and debris is drained into the sewer system, which is detrimental to its life and efficiency.
Also the increased inflow of storm water into the sewerage treatment plan cause flooding and
hydraulic overloads on the system
[89]
City Development Plan Allahabad – 2041
Ministry of Urban Development
26
City Mobility Plan 2012
[90]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[91]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[92]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Tarred/Black Topped/Bituminous
1 2,277
Topped 96.61
3 Earthen 77 3.27
Total 2357
Footpaths
As per the draft Comprehensive Mobility plan, within Allahabad, an insignificant 1% of the road
network has walkable footpath. There are mud shoulders on road edges, but they are encroached
and are un-walkable and hence do not fall under the category of footpaths due to their dilapidated
conditions. Some of the streets without footpaths are MG Road, SP Marg, NH-2, Nurullah road, SH-
96, Kamla Nehru road etc.
[93]
City Development Plan Allahabad – 2041
Ministry of Urban Development
In Civil Lines the gridiron pattern of road network generates a large number of intersections. The
majority of these intersections have a small traffic rotary at the intersection. Rotary intersection is
present on some of the major roads in the city like MG Road, Jawaharlal Nehru Marg etc. The main
junctions in the city are –
Railway station city side
Shubash Chowk
Pani Ki Tanki
Traffic lines
Mayohall Crossing
Balson Chowk
MNIT
Kotha Parcha
NH-2/NH-27 junction
Bairana crossing
[94]
City Development Plan Allahabad – 2041
Ministry of Urban Development
the trips (35%) are walk trips; however, almost 100% of the road network do not have footpath.
Sixteen percent (16.2%) of the trips in Allahabad are made by cycles. To encourage and cater to
these trips, dedicated bi-cycle lanes should be provided.
The peak hour traffic at the Mid-Block locations is presented in table below. The morning peak hour
volume varies from 1,032 PCUs at G.T. Road flyover to 4,556 PCUs at Lord Curzon Bridge and
evening peak hour volume varies from 953 PCUs at G.T. Road flyover to 3,595 PCU‟s at Johnsonganj
underpass.
1 Old Naini 2641 11.63 3844 12.09 2340 10.31 3221 10.13
Bridge
[95]
City Development Plan Allahabad – 2041
Ministry of Urban Development
7 Lord Curzon 4556 13.59 5733 13.50 3293 9.82 4459 10.50
bridge
[96]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[97]
City Development Plan Allahabad – 2041
Ministry of Urban Development
from these depots. Apart from owned buses UPSRTC also operates 121 hired buses.
The state bus terminals are located in the city‟s high density residential areas. Due to lack of
inadequate parking spaces at Civil Lines bus terminal, Zero Road Bus Terminal and Leader Road bus
terminal (Railway station), a large number of visiting vehicles get parked on the roads leading to
congestion. Also there is no provision for parking of private buses. Also, Civil Lines, Leader Road,
Rambagh Railway station and Kutchery have no areas for private bus parking.
As per CMP, alternative sites for bus depots were suggested in the Detailed Project Report by UMTC
for City Bus Services in Allahabad, but none of them have been sanctioned as of now. As per
UPSRTC Regional Workshop, which also caters as the Bus Depot, there are dead kilometers under
every route which may be avoided if a dedicated depot location is suggested
The following table gives a brief of bus depots and no. of buses:
Under JnNURM SPV was formed by AMC, UPSRTC and ADA with Municipal Commissioner, AMC as
its commissioner. This SPV had the responsibility to operate city buses in Allahabad. In the CMP it
was realized that the city needs 500 city buses to cater the needs of intra city public transport. But as
discussed during stakeholder consultation, it was mentioned that the city has only 130 city buses that
are still being operated from the UPSRTC bus depots and no separate land has been allocated for
operating city buses. Also there are no shelters developed for city buses.
Allahabad has three bus stands catering to different routes. The buses from western destinations like
Delhi, Agra, Lucknow and Kanpur halt at Leader Road Bus Stand. The Zero Road Bus Stand serves
the buses going on the southern route i.e. Mahoba and Satna. Buses from Varanasi and other
eastern towns arrive at M.G. Road Bus stand. The following table shows the local bus routes of
Allahabad.
[98]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[99]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Major intra-city trips are catered to by the 3-wheelers (shared-tempos) which operate on 13 routes
within the city as given in table below. Lack of parking spaces and absence of defined stops leads to
traffic jams.
6 Kutchery to Govindpur 50
[100]
City Development Plan Allahabad – 2041
Ministry of Urban Development
13 Dhoomaganj to Jalwa 50
Total 975
[101]
City Development Plan Allahabad – 2041
Ministry of Urban Development
In case of old city area there are no parking provisions. The vehicles are parked on the carriageway
resulting in traffic jams and congestion. There is no proper demarcated cycle rickshaw stand, which
occupies a significant share in the public transport.
In Katra, the situation is more complicated because of narrow streets. The vehicles are parked on the
streets resulting in frequent traffic jams. Encroachment on the ROW and absence of footpath forces
the pedestrians to walk on the carriageway resulting in conflict between pedestrians and vehicular
traffic. The shifting of the Katra Sabzi Mandi has reduced this problem in small stretch of the market.
1 2012 250 72
2 2011 158 81
Source – National Crime Records Bureau, Ministry of Home Affairs, Government of India
[102]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Regional NH-2 (Grand Trunk Road) divides the city into two parts.
connectivity Allahabad Bypass, connecting NH-2.
City lies on Delhi-Calcutta rail route of Eastern Railways and has direct rail
connections with important cities viz. Kolkata, Delhi, Patna, Guwahati,
Chennai, Mumbai, Gwalior, Meerut, Lucknow, Kanpur and Varanasi.
Road network Road hierarchy varies in different areas:
Old city - 2-3 lane undivided carriage way, connecting to the GT road.
GT road passes through the heart of the city.
Civil lines – grid iron pattern
Outer city – 2 to single lane undivided carriage way
Travel Old city area – average travel speed as low as 5-25 kmph
characteristics Cycle rickshaw contributes almost 70% of the modal share, followed by 2-
[103]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Public transport There are three bus terminals in Allahabad – Civil Lines, Leader Road and
Zero Road.
UPSRTC operating with fleet of 450 buses.
Mainly serving long routes travelers (inter-city)
UPSRTC buses operation on 4 routes
IPT (3 wheelers) operating and serving the local transport needs.
Mini buses operating on 10 different routes in the city.
Cycle rickshaw on routes where 3 wheelers not present.
Parking On-street parking on 30m wide network in Civil lines area.
Old city – no parking provision, vehicles parked on the carriage way
Katra area – streets are narrow, parking is done on the streets
st
1 generation CDP initiatives
The objective was to achieve a sustainable transport system that is adequate, safe, comfortable,
equitable and efficient, providing relief to the city from the through traffic and special arrangements to
meet out the traffic demand during the Kumbh mela.
Project with a total cost of Rs. 700.60 crores were identified under the broad heads as follow:
[104]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[105]
City Development Plan Allahabad – 2041
Ministry of Urban Development
27
Household size of 5 has been assumed for calculating housing shortfall in the Master Plan, 2021
[106]
City Development Plan Allahabad – 2041
Ministry of Urban Development
like water supply, sewerage, drains, roads, and streetlights in housing projects and hands these over
to AMC and Jal Kal.
Jal Nigam is responsible for providing water supply, sewerage network, drains, etc., in slum areas,
which on completion are handed over to Jal Kal. AMC is responsible for providing roads and
streetlights in slums. Jal Kal maintains the water supply and drains developed by DUDA and Jal
Nigam. Currently, DUDA is in the process of undertaking a household-level survey. Once the survey
is complete, a database will be created. Specific service standards like water supply connections and
sewerage connections, pertaining to the urban poor, are not available with DUDA.
Based on primary interactions with self-help groups, the urban infrastructure does not appear to be
satisfactory enough to bring homogenous development in new areas. The growth of housing stock
has not been commensurate with the population growth, resulting in an increase in the housing stock
deficit ultimately leading to the origination and growth of slum dwellings.
Housing projects
At the state level, the Government of Uttar Pradesh has launched several schemes for providing basic
services to the urban poor, which include security of tenure and improved housing at affordable
prices. Schemes that are being implemented are Sarv Jan Hitay Gareeb Avas (Slum Area) Malikana
Haq Yojna, Manywar (MKDBBSVY), and Shri Kanshi Ram Ji Shahri Avas Yojna. The District Urban
Development Authority (DUDA) is responsible for the implementation of such schemes. After
implementing these schemes, DUDA hands over the responsibility of providing services to AMC and
Jal Kal. Under the Shri Kanshi Ram Ji Shahri Avas Yojna scheme, 1,500 houses have been
constructed and allotted to beneficiaries by DUDA. Another 511 dwelling units are under construction.
28
Data related spatial distribution of slums in the city, land tenure and housing details are not available
29
City Sanitation Plan, Allahabad
[107]
City Development Plan Allahabad – 2041
Ministry of Urban Development
households has made their own private arrangement of hand pumps. The supply of water supply
varies between one and six hours.
Sewerage/Sanitation
Focused group discussions revealed that most of the slums do not have sewerage connections. Many
of the households‟ dispose-off waste directly into river/pond/nallah and majority of them do not have
individual toilets.
RAY aims at Slum Free India by Improving and provisioning of housing, basic civic infrastructure and
social amenities in intervened slums and enables policy intervention to facilitate the supply of
affordable housing and developed plot so as to arrest the formation of new slums.
DUDA, AMC is in process of preparing Slum Free City report under RAY. Once the report is finalized
and approved. DUDA will take up projects under RAY. DUDA will take up a pilot project for slum on a
Defense Land.
Under this program, 1558 flats were planned to be constructed, however only 1140 flats were
constructed and construction on the remaining 417 is yet to begin. Of the DU‟s which have been
constructed, only 929 have been occupied and the remaining are lying vacant.
The program was launched in 2008 to construct houses for urban poor. Projects were planned in two
phases. In the first phase 1500 flats were constructed and allocated with preference to destitute
widows, disabled and people below poverty line in the same sequence. In the second phase 511
dwelling units are being constructed.
9.2.4 Critical Analysis of housing and urban poverty under 1st Generation
CDP Scenario
st
As per 1 generation CDP, there were 185 slums and 3.3 lakh people living in slums in Allahabad. 43
slums were located along the railway lines and in the CB areas where basic services were both very
poor. Only about 25% to 30% slum people (authorized slums + unauthorized slums) had individual
water supply connections and rest 70% to 75% people were dependent either on the public stand
post and hand pumps or did not have accessibility to the potable water/ municipal water.
There were 111 community toilets across the city, but their number was inadequate which led to open
defecation. The responsibility of construction of these CTCs was with the AMC and DUDA. As per the
[108]
City Development Plan Allahabad – 2041
Ministry of Urban Development
CDP majority of slums had very poor sanitation facilities; most were either without sewer or with
partially sewer, with disposal of household waste water and solid wastes directly being dumped into
open nallas, which adversely affected drainage in these areas, leading to water logging. The poor
environmental conditions within the slum areas had adversely affected the health of the residents.
The average household size in slums in Allahabad was about 6 versus 4.5 for the city as a whole.
Only 3% houses were pucca (20% semi pucca and 77% kutcha) in unauthorized slums whereas this
is 70% in authorized slums. There were about 40% pucca houses in urban villages.
Four slum improvement schemes were launched Slum Improvement Scheme, Swaran Jayanti Shahri
Rozgar Yojana, National Slum Development Program and Valmiki Awas Yojna. However, only 70
houses were built under these schemes and major component of the funds were spent on constriction
of drains. No money was spent on improving water supply and sanitation facilities.
As per the first generation CDP, there were 185 slums with 3.3 lakhs people living in them. Only
20-25% of the people living in slums have access to individual water supply connections. There
were 111 community toilets with most of them connected to sewer line and only 3% of the houses
were pucca.
[109]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Ambient conditions 60 20 30
[110]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Desired Total
Location/ Actual Desired
Sr. Desired BOD Coliform Coliform
Source collection DO BOD
No. DO (mg/l) (mg/l) (MPN/10 (MPN/100
point (mg/l) (mg/l)
0 ml) ml)
River
1 Downstream 8.4 3.63 24,250
Ganga
River
2 Upstream >=6 8.6 <=2 3.58 <=50 20,667
Ganga
River
3 Allahabad 8.1 2.13 3,333
Yamuna
DO-Dissolved oxygen
BOD - Biochemical oxygen demand
Source – Uttar Pradesh Pollution Control Board
[111]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Table 10.3 Location and Catchment Area of Gauge Station in Allahabad district
Sr. No. River Location of gauge Danger mark (m) High Flood Level (m)
[112]
City Development Plan Allahabad – 2041
Ministry of Urban Development
At the time of heavy rainfall due to the poor drainage system many low-line areas get flooded. While
at the time of heavy flood due to the damage done by the local population to the embankment much
more country side area gets flooded.
[113]
City Development Plan Allahabad – 2041
Ministry of Urban Development
PWD
6. Procurement of sand bags and boulders
Revenue Dept.
3. Alleviation of the villages
Revenue Department
6. Construction of warehouses & shelters at safer places
Health Dept.
6. Strengthening of Medical & Health Facilities
[114]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Forest Dept.
8. Plantation in the Catchment area of the rivers basin
Relief Commissioner
1. Nomination of Nodal and Flood Coordination Officer
Relief Commissioner
3. Nomination of Nodal Officer for mitigation of Inter State
Flood Problems, if any
The Uttar Pradesh disaster management plan for flood, proposes the following institutional and
administrative preparedness –
Formation of Crisis Management Groups/disaster Management Committees at Region,
Macro and Micro Level
Formation of District Crisis Management Group (DCMG) at the district level under
Chairmanship of District Magistrate or his Nominee not below the rank of ADM, Tehsil Crisis
Management Group (TCMG) at sub-division/tehsil level under Chairmanship of officer not
below the rank of SDM and Village Disaster Management Committee (VDMC) level for
[115]
City Development Plan Allahabad – 2041
Ministry of Urban Development
disaster management. This organization at sub divisional level should include representatives
of Irrigation/Revenue/P.W.D./Health/police and public representatives
Emergency Expansion Plan for Hospitals and Health Centres
Emergency expansion plan for hospitals and health centres both for Centres, States Govt.
and for private hospitals and nursing homes, in flood prone areas are required where
Schemes for mobile medical teams for post-disaster situation are needed.
A Team of Medical Expert/Specialist for identifies diseases and its treatment, specially
developed in flood prone areas and adjoining areas.
Identification of hospitals owned by Army in the vulnerable areas and adjoining areas where
flood victims shall be treated. Prior reservation must be done, considering the hazard
assessment. Medicines like oxygen, saline water, OT and life-saving drugs should be kept
ready. Doctors and Para medical staff should be identified and posted in these hospitals.
Training of Doctors and Para medical staff on flood incidence must be done. So far as flood is
concerned, a trauma center should be developed to normalize the mental condition of the
victims. Assessing the nature and number of injuries the bed facility, medicines, oxygen,
bottles of saline water, life-saving drugs and medical expertise should be made available at
the time of need. The Air-force should be made alert to transport the seriously injured victims
which require more care in Medical Colleges, Command Hospitals, AIMS and PGIs
Identification of Warehouses
Identification of warehouses of Supply Department as centres for storage of relief material
and its distribution
Emergency Communication Systems
Planning, updation and mobilization of existing radio communication resources in emergency
and acquisition of satellite phones to make them available at the Tehsil or block level in the
districts. Establishment of strong Telecommunications Network, for Mobile & Satellite Phone
[116]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[117]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[118]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[119]
City Development Plan Allahabad – 2041
Ministry of Urban Development
The estimated water flow changes in some important river basins of India have been worked out in
the IPCC-2007 reports and are reflected in the table below.
Cauveri 21 -2.8%
[120]
City Development Plan Allahabad – 2041
Ministry of Urban Development
need to address multiple sectors and dimensions. This includes, for example, land use planning,
energy management, ecosystem services, housing and transport, water supply and sanitation, health
services, and waste management, inter alia.
11.4.2 Strategies
Being a tourist city and economic centre of the region, there are many autos and taxis plying
in the city. So introduction of CNG would reduce the carbon emissions or introduction of
battery operated vehicles.
Internalize climate change and disaster management in the strategies and processes of
resource and asset management and their maintenance, and in general development
planning in order that these may become sustainable, equitable and inclusive.
Conservation and protection of resources like air, land, water, forests, energy and
biodiversity, combined with a planned shift to a low or no-carbon economy; maximize uses of
renewables for energy production and improving of energy efficiencies at all levels -
generation, transmission, distribution and end uses
At the State level, a highly empowered Climate Change Policy and Response Group needs
to be set up in the Dept. of Planning, with the involvement of the State Department of
Environment and other concerned government departments, institutions and agencies,
specialists and the State Relief Commissioner's set-up, to identify strategies, resources and
[121]
City Development Plan Allahabad – 2041
Ministry of Urban Development
measures required to be taken at the State/ regional/ local levels to meet the challenges of
likely climate changes and the hazards of disasters and their consequential effects. Within the
Directorate of Environment (UP), a Climate Change Action Strategy and Disaster Mitigation
Cell needs to be set up to assist in and co-ordinate policy, programme and action measures
in this context. A State Action Plan on Climate Change (SAPCC) needs to be evolved to
address UP's specific problems that are likely to arise
Capacity building for meeting new challenges of climate change and disasters which would,
among other things, imply training of manpower (governmental and non- governmental),
launching broad-based awareness programmes, sensitizing all sections of people including
students, taking on board communities, institutions, youth groups, women, voluntary
organizations and media, and raising both preparedness and response levels
As of now, no climate resilience framework has been prepared or adopted by AMC for Allahabad.
[122]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[123]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Sangam
Allahabad fort The massive fort built by emperor Akbar in 1583 A.D., the
fort stands on the banks of the Yamuna near the
confluence site. In its prime, the fort was unrivalled for its
design, construction and craftsmanship. This huge,
majestic fort has three magnificent galleries flanked by
high towers. At present is used by the army and only a
limited area is open to visitors. The magnificent outer wall
is intact and rises above the water' edge. Visitors are
allowed to see the Ashoka Pillar and Saraswati Kup, a
well, said to be the source of the Saraswati river and
Jodhabai Palace. The Patalpuri temple is also here. So is
the much revered Akshaya Vat or immortal Banyan tree.
The fort is under Army‟s control, so is inaccessible to
general population. A very small section is open to public.
Patailputra Temple
[124]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Akshaya Vat
Hanuman Mandir
Shankar Viman Mandapam 130 feet high with four floors, it has the idols of Kumaril
Bhatt, Jagatguru Shankaracharya, Kamakshi Devi (with
51 Shaktipeethas around), Yogsahastra Sahastrayoga
Linga (2ith 108 Shivas around).
[125]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Minto Park
Swaraj Bhawan The old Anand Bhawan, which in the year 1930 was
donated to the Nation by Moti Lal Nehru, to be used as
the headquarters of the Congress Committee. Moti Lal
Nehru renamed it as Swaraj Bhawan. Late Prime Minister
of India, Mrs. Indira Gandhi was born here.
Facility of light & sound show from 11:00 am to 5:30 pm is
available at Rs.5.00 per head.
Visiting hours: 09:30 am to 05:30 pm. Closed on
Monday's.
Ticket: Rs.2.00
Anand Bhawan The erstwhile ancestral home of the Nehru family. Today
it has been turned into a fine museum. Here, many
momentous decisions, events, related to the freedom
struggle took place. The main building houses a museum
which displays the memorabilia of the Nehru family.
Visiting hours: 09:30 am to 05:00 pm. Ticket: Rs.2.00.
Closed on Mondays and Government holidays.
[126]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Jawahar Planetarium
Allahabad University
Allahabad Museum
Muir College
[127]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Khusro Bagh
[128]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[129]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Department &
Department establishment / Major functions Sources of fund
jurisdiction
[130]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Department &
Department establishment / Major functions Sources of fund
jurisdiction
Tourism formulation of policies and infrastructure Budgets and grants
programs and for the development from the Ministry of
coordination of activities of Hotels, restaurants Tourism and Ministry
various agencies, State UTs and other logistics of Culture for projects
and the private sector for arrangements and schemes.
the development and Publicity, marketing
promotion of tourism in the and promotion of
State heritage
Market research and
statistics
National and
International
cooperation
Human resource
development
[131]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Department &
Department establishment / Major functions Sources of fund
jurisdiction
about archaeology
[132]
City Development Plan Allahabad – 2041
Ministry of Urban Development
The Purna (complete) Kumbh or Maha Kumbh: the biggest and the most auspicious fair,
which falls once every 12 years, is always held at Allahabad, for the 'Sangam' or the
confluence of rivers is considered to be exceptionally sacred;
Ardh Kumbh: held in the 6th year after Kumbh Mela, i.e. it falls between two Kumbh Melas. It
has got the same religious value and attracts millions of people. It has the same main bathing
days as in Kumbh Mela;
Kumbha Mela: the mela is held every three years, rotating through the four cities of Prayag,
Nasik, Haridwar and Ujjain;
Magh Mela: the annual mini Kumbh is held every year except the years of Kumbh Mela and Ardh
Kumbh Mela. Magh Mela is held in the month of Magh (Jan-Feb); hence the name. During this period,
about two or three million devotees throng this place.
1954 60
1966 70
1977 100
1989 150
2001 1050
2013 >1000
st
Source – 1 generation CDP and National Geographic
Sangam has huge potential for development and needs an Integrated Sangam Area
Development Master Plan (ISADM) to reduce the continuous outflow of the cash from state
exchequer in the name of Kumbha Expenses
Lack of tourist information centres. There is only one tourism information centre
Fort and Ashoka‟s pillar are not open to public as they are under Army‟s control
[134]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[135]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Mayor in
council
Deputy
Mayor
Sanitation Health
committee committee
AMC has been divided into 80 wards, which are grouped into five zones. In all, 80 councilors are
elected, who form the general body of AMC and work in tandem with the executive staff. The
organization structure of AMC is as follows.
The functions of the AMC according to the UP Municipal Corporations Act of 1959 are executed
through a number of departments. Below are the details out the list of departments and their key
functions.
[136]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[137]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Auditing of accounts
Animal husbandry
Maintenance & provision of Animal peens & slaughter houses
Catching of street animals
Issue of licences for commercial use of animals
GoUP constituted a committee under the chairmanship of the Director of Local Bodies (DLB) in 2006
to establish norms for categorization, up-gradation, reorganization, and rationalisation of the human
resources in ULB.
The committee has already submitted its report to GoUP. The Finance Department of GoUP has
approved the recommendations of Directorate of Local Bodies (DLB). Approval from the Cabinet is
awaited. Upon approval from the Cabinet, many posts such as those of the accounting, revenue, and
IT cadres; environment engineers; and city managers shall be created at the ULB level.
[138]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Functions
Draw water from the Yamuna River and tube wells
Provide water supply and undertakes operation and maintenance of water supply network
Undertakes operation and maintenance of sewerage network (Except STP)
Construct new water supply and sewer lines at micro level
Solely authorized to collect taxes and user charges for water supply and sewerage
Redressal of complaints regarding its services
Installation of new hand pumps, tube wells etc., in certain rare cases, with help of MP and
MLA LAD funds
13.1.3 Parastatals
[139]
City Development Plan Allahabad – 2041
Ministry of Urban Development
To review annually the technical, financial, economic and other aspects of water supply and
sewerage system to every Jal Kal or local bodies which has entered into an agreement with
the Nigam under Section 46 of the act
To establish and maintain a facility to review and appraise the technical, financial, economic
and other pertinent aspects of every water supply and sewerage scheme in the state
To operate, run and maintain any water works and sewerage system if and when directed by
the State Govt. on such terms and conditions and for such period as may be specified by the
State Govt.
[140]
City Development Plan Allahabad – 2041
Ministry of Urban Development
The UP Avas Vikas Parishad (AVP) is the nodal agency for housing in the state. It was established in
April 1966 to work towards housing solutions. Besides housing projects it has diversified its activities
to planning, designing, construction and development of almost all types of urban development
projects throughout the state. In addition, AVP plans and executes projects for the development of
health and education. It is also handling new district headquarters projects with the execution of large
number of schemes. AVP has constructed multi storied office buildings and commercial towers for its
own and public use. Providing public facilities is also a priority function of AVP. It develops market
areas and convenient shopping. AVP also indulges into housing for the shelter-less.
AVP is a professionally managed organization with specialists working in different fields viz –
Architecture, Town Planning, Construction Technology, Infrastructure Design, Execution and
Maintenance, Estate and Financial Management etc. The AVP has an Engineering, and Architecture
& Planning wing.
The State PWD is primarily responsible for construction and maintenance of roads, state government
institutions and state government housing in the city. The CPWD is responsible for the construction
and maintenance of only central government buildings and institutions.
PWD operates under the State PWD Minister and State-level Secretary and Principle Secretary. At
the district level the Superintending Engineer heads either one or two districts. There is one Executive
Engineers (Ex En) for every 3 to 4 election constituencies.
The PWD is responsible for the maintenance of the main city roads with the AMC responsible for the
internal roads. There are no criteria for categorizing the roads to be maintained by PWD or AMC. The
Distract Magistrate assigns the responsibility to either of the departments based on the primacy of the
road stretch.
[141]
City Development Plan Allahabad – 2041
Ministry of Urban Development
th
Table 13.3: Status of 74 CAA
Sr.
Reform Remarks
No.
Urban planning including
1. In progress
town planning Functions like urban planning, regulation of
Regulation of land-use land-use, and planning are carried out by
2 and construction of In progress ADA.
buildings
AMC has no role to play in the performance
Planning for economic
3 In progress of these functions, since the planning
and social development
activities are all handled by ADA.
The Jal Sansthan has been dissolved and
Water supply – merged with the Nagar Nigam. A detailed
5 domestic, industrial, and Completed government order dated 04.02.2010 has
commercial been issued regarding the functioning of the
Jal Sansthan.
Fire services are currently managed by the
Police Department. The discussions with
state-level officials revealed that this function
7 Fire services In progress is likely to remain with the Police Department.
On the contrary, AMC has been asked to
prepare a fire hazard response and a
mitigation plan for its jurisdiction.
AMC would perform this function in
Urban forestry,
consultation with the State Forest
protection of
8 In progress Department. Tree plantation on dividers,
environment, and
road-side land, and other available open land
ecology
is done by AMC.
Safeguarding the AMC would perform this function in
interests of weaker consultation with the Social Welfare
In progress with
9 sections of the society Department of the state, by earmarking
delay
including the physically funds; the scheme would be executed by
and mentally challenged SUDA/DUDA.
10 Slum improvement and Completed Various departments under AMC are
[142]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Sr.
Reform Remarks
No.
up-gradation performing this function, and allocations have
been made in the budgets of the local bodies.
DUDA is responsible for all slum housing
projects and for providing service
infrastructure in them.
AMC has been empowered to select
beneficiaries for special projects for the urban
housing and employment programme. AMC
Completed has also been empowered to undertake
11 Urban poverty alleviation infrastructure development in the urban poor
areas. The Commissioner has a
representation on the governing body of the
DUDA, which undertakes special projects
relating to urban poverty alleviation.
[143]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Integration of City
2 Planning and Delivery In progress
Functions
Rationalization of
4 Completed
stamp duty
Community
6 Completed
Participation Law
In progress
Four modules, viz. Birth and Death Registration, Property Tax,
Grievance Readressal, and Personnel Information System, have
1 e-Governance already been developed and are under the testing mode. These
modules will be rolled out soon at the ULB level once the testing
is completed. The remaining modules are simultaneously being
prepared and will be rolled out soon at the ULB level as well.
Basic services to
7
urban poor
[145]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Some of the optional reforms were focussing on improving the existing process of building plan
approval process and byelaws for rain water harvesting, recycle and reuse of wastewater, etc.
Following table provides status of mandatory reforms.
Completed
Revision of Building bye-laws to
2 Building permissions for proposed construction of
streamline approval process
less than 300 sq. mts is provided in 24 hours
Completed
Revision of Building bye-laws to
3 make rainwater harvesting Rainwater harvesting has been made mandatory
compulsory for building with built-up areas beyond 300 sq.
mts
Completed
Earmarking of 20-25% land for Earmarking of 20% land has been made
4
economically weaker sections mandatory for townships and projects beyond
prescribed minimum area
Completed
Introduction of computerized
6 process for land and property The land and property registration process has
registration already been computerized under the revenue
department
Completed
Bye-laws for re-use of recycled
7 Amendments have been made to the Building
water
Rules to incorporate the same
In progress
The Financial Responsibility and Budget
8 Administrative Reforms Management Bill has been prepared and is being
considered by the Finance Department for
approval
There has been fair progress with regard to the implementation of standalone software modules such
as the Property Tax Module, Birth & Death Module, and Personnel Information System. Initiative has
[146]
City Development Plan Allahabad – 2041
Ministry of Urban Development
been undertaken for the development of a citizen‟s grievance module. The e-procurement module
does not offer end-to-end solutions including online bid submission.
Implemented
The module is implemented since Nov 2006.
Registration of births Online registration can be done. However, online issuance of
1 birth and death certificates requires digital signature. The
and deaths
system is not in place presently.
Digitization of archives for birth and death registration has been
completed.
Completed
rd
The module has been operational from 23 May 2010. Both
Public grievance
2 web and window based application is being used. Currently,
readressal window based registration or SMS based complaints are
lodged, which are directly fed into the module after generating a
complaint ID.
In progress
Public can download new water/sewage connection forms from
Water supply and
5 the website: www.allahabadjs.in.
other utilities
All data has been computerized. Computerized bills and
receipts are being issued. All municipal zone offices are
connected for billing & collection system, however, online
[147]
City Development Plan Allahabad – 2041
Ministry of Urban Development
In progress
7 e-Procurement Vendors can only download tender documents from the
website; complete e-tendering process is not available as it
requires state-level initiatives.
In progress
Monitoring of projects is being done by the Performance
8 Project/ward works Monitoring and Evaluation System (PMES) System of Ministry
of Urban Development (MoUD) for JNNURM projects only.
This software has been developed by UP Electronics and
monitoring is done by computerized database
In progress
Building plan approvals are provided manually by the Allahabad
Development Authority (ADA).
Building plan
10 Presently there is no such system. This has to be developed at
approval
state level.
The software for issuance of NOCs has been developed by UP
Electronics, and computerized NOCs are being issued.
In progress
11 Licences Food and trade licences are issued manually. Data entry is
done in Excel.
In progress
the services. Further, GoUP issued a government order to each ULB for the development of the
following facilities on PPP basis, viz., parking places, modernization of slaughterhouses, and an
electric crematorium.
In the past, AMC has undertaken various PPP initiatives:
AMC signed a contract with M/s SPML Infra Limited to undertake collection, transportation,
treatment, and disposal of municipal solid waste.
AMC has signed a contract for the construction and operation of bus shelter in Allahabad city.
Several initiatives under PPP have been undertaken by AMC such as electric crematorium, public
toilets, park beautification, etc.
[149]
City Development Plan Allahabad – 2041
Ministry of Urban Development
The absence of criteria for classification of roads to be maintained by the AMC and the PWD is not an
enabling framework for efficient functioning by either agency. As a corollary to the above, neither
agency (AMC/ PWD) is able to plan its work in advance leading to a reactive mode of functioning.
The functions of the AVP, the ADA and the AMC are similar. All the three agencies are involved in
planning and development of land for residential and commercial purposes. The linkages of these
agencies with the TCPD are also indicative of overlaps.
[150]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Water charges
During the analysis period, the water charge collection was at 71% per
collection efficiency
annum, indicating a significant scope for improvement.
(85%)
This indicator provides the details of ULB‟s reliance on its own sources
of income. This indicator also shows the stability of the revenue stream
Share of own sources for ULB; higher the percentage better is the stability. AMC‟s own
in Revenue Receipts revenue sources account for about 17% of its total Revenue Receipts
during review period, indicating a very high dependence on grants and
contributions for its regular O&M and establishment cost.
The growth in per capita property tax income indicates the performance
of AMC with respect to its performance in tax realization. It is directly
Growth in Per Capita dependent on property tax assessment, which is a direct function of
Property Tax Income population increase and collection efficiency. The per capita property
tax income of AMC has increased from Rs. 98 in 2008-09 to Rs. 112 in
2011-12, at a CAGR of 7%.
Per capita tax income has grown at a CAGR of 9% during the analysis
Growth in Per Capita
period from Rs. 91 in fiscal year 2008-09 to Rs. 117 in 2011-12. The
Tax Own Income
major contribution came from property tax.
Growth in Per Capita Per capita non-tax income has declined during the review period from
Non-Tax Own Income Rs. 61 in 2008-09 to Rs. 46 in 2011-12, at a CAGR of about (9)%.
Share of The share of establishment expense of Revenue Receipts has
Establishment marginally increased from 77% in 2008-09 to 78% in 2011-12. The
Expenditure to Total establishment expenditure (including salaries and wages, pension,
[151]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[152]
City Development Plan Allahabad – 2041
Ministry of Urban Development
30,000.0
25,000.0
20,000.0
15,000.0
10,000.0
5,000.0
0.0
2008-09 2009-10 2010-11 2011-12
-5,000.0
-10,000.0
Total receipts Total expenditure Surplus/deficit
.
Table 14.2 Financial Statement of AMC for analysis period (2008-09 to 2011-12) in Rs. lakhs
Revenue receipts
Revenue expenditure
[153]
City Development Plan Allahabad – 2041
Ministry of Urban Development
2011-12
2010-11
2008-09
18% Taxes
72%
[154]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Tax revenue
Property tax
Tax on animals
Publication tax
Theatre tax
Tax of pilgrims
Non-tax revenue
Rent from municipal properties
Stamp duty
License fees
Registration fees
Road cutting
Notice and warrant fees
Water and sewerage tax
Assigned revenue
General programs
Life insurance fees for government employees
Grant for floods
Grant for payment of salaries due
The main component of Revenue Receipt is state finance commission grant and property tax.
Together these two components constitute 73% of the Revenue Receipts. The increase in Revenue
Receipts is primarily on account of state finance commission and property tax. There was a healthy
increase in state finance commission grants from Rs. 41 Cr. in 2008-09 to Rs. 58 Cr. in 2011-12 and
property tax increased from Rs. 10 Cr. in 2008-09 to Rs. 14 Cr. in 2011-12.
Over the years, the revenue contribution, in percentage terms, has remained largely the same. The
contribution of assigned revenues, grants and contribution has been remained about 78% and tax and
non-receipts has remained close to 22%.
During the period under review, the tax income grew at a CAGR of 12%. The main components of tax
income are property tax, publication and pilgrim tax. Tax income contributes to 6% of the total income.
The tax receipt increased from Rs. 10 Cr. in 2008-09 to Rs. 15 Cr. in 2011-12, indicating a CAGR
growth of 12%. The table below shows the breakup of tax income during the period under review. The
maximum increase in absolute terms and percentage terms was observed in property tax. A
substantial increase was seen between 2011-12 and 2011-12, on account of increase in number of
properties under tax net.
Advertisement Tax 0 0 0 0 -
[155]
City Development Plan Allahabad – 2041
Ministry of Urban Development
On an average non-tax receipt has contributed 11% of total revenue income over the period of
analysis years. For AMC, non-tax receipts decreased from Rs 7 Cr. in 2008-09 to Rs 6 Cr. in 2011-12
growing at CAGR of (5)% in the analysis period, major contribution coming from stamp duty.
Assigned grants and contribution constitute the largest part of the revenue receipts. Over the period of
analysis, on an average it constitutes 72% of the revenue receipts and grew at a CAGR of 20%. State
finance commission grant constitute the largest part of the assigned grants and contributions.
[156]
City Development Plan Allahabad – 2041
Ministry of Urban Development
3.58%
Finance and Revenue
6.43% Department
General Administration
Maximum salary expenditure is by the public health department, which includes sanitation, street
sweeping and health. It has increased at a CAGR of 17%.
[157]
City Development Plan Allahabad – 2041
Ministry of Urban Development
For operation & maintenance, expenditure incurred by different department of AMC, is shown in the
table below. Major share of 52% in O&M expenses has been incurred by Public Works department.
Second Major share of 270 is of Public Health Department. O&M expenses of other departments are
in the range of 1% to 17%.
2%
General Administration
6%
Public Works
37%
23% Education, Sports amd Youth
Welfare
Public Health Department
1% Others Departments
Expenditure incurred by AMC in the analysis period is shown in the graph shown below. In absolute
terms, expenditure under general administration increased the most. Due to which, the O&M expense
increased at a CAGR of 38%.
[158]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Water Works 82 45 83 44
Sewerage/Sanitation 12 1 1 0
2011-12
2010-11
Capital expenditure
2008-09
[159]
City Development Plan Allahabad – 2041
Ministry of Urban Development
MP/MLA LADs 22 7 28 68
Kumbh 0 0 0 1,223
Computerization 0 0 0 0
The increase in capital income is on account of projects being implemented on account of JNNURM
programme and projects undertaken for Kumbh mela.
[160]
City Development Plan Allahabad – 2041
Ministry of Urban Development
MPLAD 0 11 33 55 103.9
Public Health,
100 660 0 0 -100.0
Conservancy/SWM
Kumbh Mela 0 0 0 0 -
[161]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[162]
City Development Plan Allahabad – 2041
Ministry of Urban Development
15.2 SWOT
Table 15.4 SWOT Analysis
Strength Weakness
Opportunity Threat
[163]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Opportunity Threat
[164]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[165]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Meeting Agenda Inception meeting for Revised City Development Plan of Allahabad city
th
Place/ Location/ Allahabad Nagar Nigam Office on 26 September 2013 at 3:00 PM
Date/ Time
Mayor, ANN
Municipal Commissioner, ANN
Secretary, ADA
Additional Municipal Commissioner, ANN
General Manager, Jal Sansthan
Executive Engineer, Jal Nigam
Representatives from VDA
Member of PIU, ANN
CRISIL Risk and Infrastructure Solutions Limited:
Mr. Tapas Ghatak, Sector Expert
Mr. Rahul Sethi, Consultant
The meeting was chaired by the Honourable Mayor and attended by the Municipal
Commissioner, department heads, and representatives of various parastatals.
Mr. R K Dwivedi, HR Officer briefed the officials about the agenda of the meeting and all the
members present introduced themselves.
The CRIS team initiated the meeting by giving a brief about the CBUD programme and the
need to revise the CDP. Thereafter, the CDP preparation process was detailed to the officials
present, including key CDP highlights, guidelines, and our approach and methodology for the
revision of CDP.
During the discussion, CRISIL team requested the officials to share their experiences during
the preparation of the old CDP. In addition, CRIS also asked the officials present if they could
st
comment why some other projects in the 1 generation CDP were not taken up and their
current status.
The senior officials have changed over the last five years, so the officials present were not
aware of the details of the CDP preparation process followed earlier. However, on the
projects identified in the CDP, they mentioned that some of the projects were not a priority at
that time. But these projects may be considered in the revised CDP.
Stakeholder workshop is the central idea around which the preparation of CDP revolves. The
CRIS team requested the officials present to ensure stakeholder participation by identifying
stakeholders to be present in the workshops to share their views.
The Secretary, ADA was of the view that stakeholder interactions should be initiated an on-
going process and not just during the workshops.
The Honourable Mayor was also of the view that importance should be given to the
stakeholder workshops and suggestions provided by the stakeholders should be taken into
[166]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Thereafter, the CRIS team requested the Honourable Mayor and Municipal Commissioner to
appoint a nodal officer for coordinating in all aspects of CDP, form CDP policy and technical
committees, and identify stakeholders to participate in the stakeholder meetings/workshops.
To this it was agreed, that CRIS will share a tentative list of committee members and share
with ANN. Thereafter, ANN will finalize the members of the committees and appoint a nodal
officer.
It was also decided that list of stakeholders for the workshops will be prepared in the due
course of time.
Interim Workshop
th
The Stakeholder Meeting was held at AMC meeting room on 11 March 2014, AMC office, Allahabad.
The meeting was chaired by Municipal Commissioner, Allahabad Municipal Corporation and attended
by several senior officials from AMC, ADA, Jal Nigam, UPSRTC, DUDA and several councilors. A
presentation of the preparation of Revised City Development Plan and findings of the city wide sector
wise key issues was delivered by CRISIL.
Prior to the stakeholder workshop, CRIS undertook individual discussions on various issues faced in
the city today. The discussion were held with the following –
CAFO, AMC
General Manager, Jal Kal
Project Officer, DUDA
Executive Engineer, Jal Nigam
Executive Engineer, AMC
Regional Tourist Officer, UP State Tourism Department
Station Officer, UP Fire Service, Kasturba Gandhi Road, Allahabad
Chief Health Officer, AMC, Allahabad
Dy. Chief Medical Officer, Allahabad
Assistant Engineer, ADA
Deputy Education Officer, AMC
Mr. Anil Kesarwani, Head, Civil Defence, Allahabad
Mr. Kamlesh Singh, Ex-councillor, Allahabad
Mr. A K Jain, Eastern Chamber of Commerce, Allahabad
Prof. Tiwari, Civil Engineering Department, MNIT, Allahabad
Mr. Anand Mohan, Advocate, Allahabad
[167]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[168]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Sector Issues
Unequal supply of water to many parts of the city. Low lying areas have
high water supply pressure but areas on higher ground do not
Going forward dependence on ground water needs to be reduced
The operations and maintenance cost is high for tube wells
Water supply Water quality is an issue, as many pipelines have been damaged.
Water treatment plants not sufficient
Because of heavy dependence on ground water and very little ground
water recharging water table is declining
Metering has not been implemented yet
[169]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Sector Issues
About 70,000 new vehicles are sold every year, due to which there is
heavy movement of vehicles in the city. As of today, there are close to 8
Roads and lakh vehicles in Allahabad. Old city area witnesses maximum traffic jams
transportation Parking facilities are inadequate in all commercial areas
Unified Metropolitan Transport Authority (UMTA) is not functional
Existing number of buses is inadequate
The existing bus depots are inadequate
Social Lack of paramedical staff in all hospitals and primary health centres
infrastructure There is shortage of land for schools
The response time for fire brigades to reach the spot is on the higher side
as lanes are narrow
The availability and quality of basic services like water supply, sanitation
Slums facilities, solid waste management etc. are poor
Unavailability of reliable data on slums is hampering development plans
for slum areas
[170]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Strategies
Sector
The source of water at water works in Naini should be surface based
Old pipelines need to be replaced
Water treatment plant capacity needs to be increased
Implementation of rainwater harvesting for ground water recharging
Metering of all water supply connections
[171]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Strategies
Sector
Widening of roads and junctions in old city area
The number of autos should be limited in the city
Provisions shall be made for paid taxi stands
Traffic signals should be put up on all junctions
Footpaths should be constructed along roads for pedestrians
There should be regular anti-encroachment drives
[172]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Responding to the keenness of the stakeholders in knowing about various mission programmes, the
CRIS team presented, an overview of various mission programmes viz., Smart Cities, Urban
Development Mission and Swacch Bharat Mission and mentioned that while under each of the
programme the relative aspects would be dealt in more detail, however the initiative and projects
identified in the CDP for addressing present and future needs of Allahabad would serve as a means
of co-ordinated planning. The team further provided details to the stakeholders on the key emerging
challenges, opportunities and strength of the city and invited suggestions to the various aspects
identified in the CDP. The total investment identified and sector wise details were discussed with the
stakeholders. The consultants also highlighted the role of each agency for undertaking a coordinated
development.
The stakeholders were appreciative of the fact that Allahabad city has been selected by
MoUD for developing as a Smart City and suggested that all other programmes should be
implemented in a coordinated manner and with holistic planning approach.
The stakeholders also felt that as part of Smart City development initiative localized
innovative workable approach should be adopted which are doable and manageable in
context of Allahabad city.
The development in Allahabad, at present is beyond the Municipal Jurisdiction, the
stakeholders enquired whether the projects and planning covers the area beyond their
jurisdiction. The also expressed the need to connect the growth happening across the river
[173]
City Development Plan Allahabad – 2041
Ministry of Urban Development
through construction of flyovers and managing planned growth in the outgrowth areas. The
consultants confirmed that the CDP has taken into consideration the Allahabad Master Plan
which covers AMC and outgrowth areas and also affirmed that the CMP of Allahabad has
identified such projects and have been included in the CDP.
th
The stakeholders expressed strongly that all the functions as envisaged under 74 CAA, for
city governance and management should be transferred to the Urban Local Body for
planning, implementation and operations. Unless, this are transferred, the ULB remains as a
fund transferring agency and does not has any role in planning for its citizens. They
suggested that the new mission should condition the development by giving powers to ULB to
undertake and implement this projects.
The stakeholders also made important emphasis on development of slum areas inclusive of
livelihood and social and other infrastructure facilities. There is a key challenge they face in-
situ development due to limited land availability. The consultants provided examples and
innovative practices of other cities where such issues has been handled and suggested ULB
to undertake a visit of such good practices.
The stakeholders felt that although Allahabad has taken about Rs 734 crores of projects
under the previous mission, however, suggested that the incomplete works especially
sewerage system in the city should be taken up at priority. This would specially need
providing sewerage connections to household, all other trunk infrastructure and treatment
facilities are already in place.
In a follow up meeting up the Municipal Commissioner and ULB officials, it was discussed that
waste management in the city also needs significant improvement. Where majority of the
cities are facing challenges in collecting segregated waste, it was discussed and suggested
that the corporation can explore separate collection mechanism for bio-degradable waste
from hotels, markets (fruits, flower markets, mandi‟s etc.) which if collected separately can be
put to use directly for vermin-composting. Significant awareness campaigning is also needed
to bring awareness about waste segregation and such initiative can be started from schools,
colleges and in localities. It was also discussed creating scientific landfill site to avoid pollution
and move towards zero emission envisaged under Swacch Bharat Mission.
The Municipal Commissioner and Mayor also emphasized on enhancing the capacity of ULB
to manage all aspects of municipal service delivery in a better way and handle challenges of
city management going forward.
It was also discussed that drawing of water through tubewells is affecting the ground level and
increased maintenance cost, where a perennial source of water is already available in the
form river Ganga in the city. The city should hence, plan moving away from tubewells to
drawing water from river itself, which will also bring significant cost saving in operations.
Various measures for controlling NRW and bulk metering were discussed to bring more
efficiency in water supply management.
It was suggested that although the CMP has not identified rapid transport system for the city,
however, it is important that with the growing densities and population, the city would in future
require express connectivity and strong public transport system. It was also discussed to
explore existing railway network passing through the heart of the city as means of local
transport. This would need permissions from railway authorities and also would require doing
a financial feasibility.
The stakeholders and officials are determinant to take development of Allahabad in a rapid
manner and making it a smart city.
The meeting concluded with vote of thanks to all stakeholders.
[174]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Media coverage
[175]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Improve drainage network across the city to prevent water logging and
safeguard quality of roads.
Storm Water Constructing new drains shall be integrated with the new roads
Drainage
development.
Perforated tiles footpaths to allow penetration of rain water into ground.
[176]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Sector Goals
Separate collection system from bulk producers.
Kumbh area, Sangam and Fort to be beautified and provision of all basic
Heritage amenities
Initiate coordinated approach to heritage area conservation and planning
River Ganga
Completely stop waste and sewerage disposal into the rivers
and Yamuna
Environment Increase the green spaces in the city and integrate them
Management Pollution control through multi-pronged strategies
Sector Goals
[177]
City Development Plan Allahabad – 2041
Ministry of Urban Development
The project identification has been carried out through a demand-gap analysis and the stakeholder
consultation. Further, project prioritisation and strategizing of the investments/phasing of investment
are based on the strategies listed out under each service sector as identified through stakeholder
consultations. The projects derived are aimed at ensuring the optimal and efficient utilisation of
existing infrastructure systems and enhancing the capacity of the systems/services to cater to the
demands of future population additions. Certain projects have been identified in consultation with the
stakeholders.
[178]
City Development Plan Allahabad – 2041
Ministry of Urban Development
The CIP and forecasted future needs for provision of capital facilities under each identified sector are
presented below. These assets will help to universalise services for the current population as well as
accommodate the expected increase in population.
In sectors where long-term planning is required (for example, source development for water supply,
sewerage, etc.), a 25-year planning horizon is considered. Assets created in such sectors consider
the projected population in this horizon. These infrastructure assets would not only guarantee
services to the citizens but also signal a proactive commitment to potential investors considering the
region.
In order to estimate the investment priorities in this sector, the gap analysis has been carried out to
analyse the current deficit in the system and future requirement for the design year 2041. The sector
plan for water supply improvement in the city has been presented in the table below.
Design
Base year as 2013 and design year as 2041
parameters
Demand estimation based on the projected population for Allahabad and
additional 10% of the population considered as floating population.
Daily water supply demand (172.5 LPCD) calculated on the basis of daily
per capita water supply norm (150 LPCD +15% Un accounted for Water)
Quality of water as per CPHEEO standards
100% treatment capacity
33% of water supplied as storage capacity
Distribution network coverage – 100% in habitable areas.
Cost recovery through user charges (100% O&M expenses)
30
With the completion of ongoing works, there will not be any demand for water supply source augmentation
[179]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Water Supply
This focuses on partial or complete refurbishing of the existing water
System
Rehabilitation distribution pipeline.
Plan The old, defunct, and inadequate piping system needs to be replaced by a
proper distribution network.
Comprehensive
This focuses on source augmentation, adequate storage, and distribution
Water Supply
Plan network and treatment facilities for future requirement.
Operation and
This focuses on development of the asset inventory
Maintenance
Plan Introduction of flow meters, bulk meters and consumer end metering
system will ensure judicious usage of water
Implementation of service information improvement plan
31
The life of tube wells is estimated to be till 2031. Hence, to meet the water demand in addition to 70 MLD (from intake well)
new water source will have to be developed.
[180]
City Development Plan Allahabad – 2041
Ministry of Urban Development
32
Since, the breakup of replacement and new network for ongoing works is not available. Hence, it has been assumed that
50% of the existing network needs to be replaced in phase I.
33
Metering was a component of the on-going JNNURM project; however procurement of meters has not been done. So, a
provision equivalent to the cost of meters has been made in revised CDP.
[181]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Distribution network
The distribution network is the most critical component in the water
supply system for Allahabad city
To achieve the desired service level of 100% road coverage, 708 km
of new distribution network is required.
As the distribution network is very old, a substantial part of the
network needs to be replaced. Based on discussions with officials,
the length of distribution network to be replaced has been assumed
that 50% of the existing distribution network needs to be replaced.
However, the exact length of the distribution network to be replaced
may be less.
Treatment capacity
The treatment capacity needs to be increased by 149 MLD to treat
100% water supplied.
Water quality
To monitor the quality of water, water quality assessment units have
been proposed
Training
Institutional level training needs of Jal Kal need to be assessed.
Accordingly cost provision has been made.
[182]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Implemen 202
Tot 2015- 2016- 2017- 2018- 2019-
Sector/Component ting 0-
al 16 17 18 19 20
agency 21
G Institutional training Jal Nigam 10 2 2 2 2 2 -
Under PPP, AMC would undertake implementation of O&M of water supply system which involves the
following steps:
AMC shall fix the tariff for water user charges.
Handover the assets to the operator for operation and maintenance
Billing and collection of the water charges should be done by the private operator.
The assets would be maintained by the private operator, and AMC shall pay revenues to the
private operator.
Under the PPP model, the developer would have the following responsibilities
The entire project can be awarded for a period of 30 years
Developers can bid on either tariff required to operate and maintain the project or annuity
support from AMC
Key service level parameters
AMC need to set performance parameters for the private developer to be obliged during the contract
period. The performance parameters would in the area of;
daily hours of supply
supply levels as stipulated by AMC
quality of water as per CPHEEO norms
Improvement in coverage of water supply connections
Reduction in non-revenue water
Improvement in collection efficiency
Frequency of billing of water bills
No. of complaints received
Key note:
AMC would require to appoint a transaction advisor to undertake a detailed feasibility assessment,
preparation of bid documents (request for qualification – RFQ, request for proposal – RFP), and bid
process management leading to award of contract to private developer
[183]
City Development Plan Allahabad – 2041
Ministry of Urban Development
AMC is treating most of the sewage generated in the city, however the quality of treated water is not
up to the mark. At present, an additional 82 MLD treatment plant and 972 Km of sewerage network is
proposed to be implemented under various government schemes. This will lead to augmentation of
treatment capacity to 336 MLD and sewerage network across the city to 1924 Km. To meet the future
demand for treating the waste water, these STPs will be sufficient till 2041, however some of the
STPs will require refurbishment.
Likewise, the coverage of the existing sewage collection network is low and augmenting the UGD
network to provide 100% coverage was also envisages in the master plan. However, the ongoing and
proposed projects will be sufficient to meet the gap and achieve 100% coverage.
2021 2041
Demand-gap Ongoing Current
Component 2013 (Short term) (long term)
assessment projects gap
Demand Gap Demand Gap
Refurbishment
- - - - - - 357
of UGD
network (km)
Pipelines for
treated waste - - 478 478 478 1435 1435
(km)
Community
toilets in 324 - - 499 175 499 175
slums
Improvement
of community - - - 324 324 499 499
toilets/public
toilets
Action plan Activities
Comprehensive
sewerage plan Segregation of sewerage and storm water drainage
[184]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Institutional To develop sludge management in initial phase and phase out onsite sewage
strengthening disposal mechanisms.
and capacity Increase the sewerage user charges to meet the O&M expenses for new
building infrastructure to be developed
Faecal sludge Carry out mapping of onsite sanitary disposal systems in the city
management Faecal sludge management to be carried out at regular intervals
Development of public 35
Construction of community toilets
sanitation facility
[185]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[186]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Undertake O&M of STP and construction and maintenance of public toilets/community toilets
The project can be awarded for a period of 10 years
AMC can ask private developer to consider selling of treated water as part of contract
Developers can bid on annuity support from AMC
AMC needs to set performance parameters for the private developer to be obliged during
the contract period. The annuity payment should be a factor of performance parameters
achieved by the developer
The performance parameters would be quality of treated water
The above model is indicative. AMC would require appointing a transaction advisor to undertake
detailed feasibility and preparation of bid documents (request for qualification – RFQ, request for
proposal – RFP) and bid process management leading to award of contract to private developer
The Navi Mumbai Municipal Corporation took several initiatives. In the first instance, three sewerage
treatment plants using the latest technology were commissioned in 2011-12. This was later expanded
through use of JnNURM funds. The whole system was revamped to move towards a 100% UGD system for
sewage collection and adopting advanced technologies for sewage treatment. The quality of the treated
water from the sewage treatment plants is better than the norms prescribed by the Maharashtra Pollution
Control Board. The increased spending on waste water treatment has gone hand in hand with aggressive
campaign on the part of the corporation to spread awareness about the importance of sanitation. The NMMC
has built several low maintenance toilets. The cleaning, operation and maintenance of the public toilet blocks
has been outsourced to NGOs. 75% of toilets are connected to UGD network and it is a city free of open
defecation. The city won the Best City Award for Improvement in waste water and sanitation services from
GoI in 2009-10.
Source: Ahluwaia, Isher Judge, Transforming our Cities: Postcards of Change, Harper Collins India, 2014
[187]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Door-to-door
An NGO needs to be engaged for door to door collection of waste
waste collection
Source
The segregation of biodegradable and non-biodegradable wastes should be
segregation and
done at the source level.
collection of
commercial This segregation of waste would improve the recovery from waste collected
34
The existing fleet for secondary transportation is about 5 to 10 years old. Hence the existing capacity has not been
considered while estimating demand for 2021 and 2041.
[188]
City Development Plan Allahabad – 2041
Ministry of Urban Development
waste since the calorific value of the dry waste is not affected.
Scientific landfill
The on-going work on scientific landfill needs to be completed to ensure
complete scientific disposal of waste
IEC
For effective solid waste management in the city, regular awareness
campaigns have to be conducted in the city on 4R strategy (reduces, reuse,
recycle, and recover).
Unit rates Component Unit Unit Cost (Rs in Lakhs)
A. Fleet augmentation for Secondary Procurement of new vehicles to replace the existing ones
transportation and additional vehicles. Total requirement will be 971 tonnes
[189]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Impleme 202
Tot 2015 2016 2017 2018 2019
nting 0-
al -16 -17 -18 -19 -20
Sector/Component agency 21
Fleet augmentation for AMC
31 3 15 12 - - -
A Secondary transportation
B Other equipment AMC 3 0.3 1.5 1.2 - - -
Total 34 3 18 13 - - -
AMC would require appointing a transaction advisor to undertake detailed feasibility and preparation
of bid documents (request for qualification – RFQ, request for proposal – RFP) and bid process
management leading to award of contract to private developer.
[190]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Design
Storm water network on all roads and link to major channels.
parameters
Storm water drains as percentage of road length is considered as 100%.
Roads with dividers should have drains on either side of the road.
80% of the storm water drains as pucca closed
Size of drains to be designed according to the rainfall and runoff.
Demand gap Component 2013 Current 2021 2041
assessment gap (Short term) (long term)
Demand Gap Demand Gap
Pucca closed 585 1988 2126 1541 2126 1541
drains (km)
Desired 2013 2017 2019 2021 Remarks
outcomes Storm water 27% 30% 60% 100% -
drainage network
coverage
Rehabilitation of - 40% 60% 100% -
existing drains
Action Plans Activities
Storm water
Assessment of percentage of pucca and kutcha surface drains within AMC
drainage
limits
rehabilitation
plan Identification of water logging areas, contour survey of areas
Development of pre-monsoon maintenance plan to include cleaning and
desilting of the surface drains
Rehabilitation
Unregulated constructions and siltation along these channels hamper the
and
drainage system during the monsoon.
strengthening of
nallahs Hence, it is important that these nallahs to be mapped and developed with
retaining walls
Up-gradation of
Upgrade and extend the road side surface drains across the city
roadside storm
water drains
[191]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Sector goals Develop public transit system in conformity with the land use that is
accessible, efficient, and effective
[192]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[194]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[195]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Bi-cycle lanes Along with foot paths bi-cycles lanes of 180 Km to be created
[196]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[197]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Sector goals Improve the access to physical and social infrastructure to slum dwellers
Develop livelihood strategies to improve the work force participation
Design New houses to households living in kutcha houses and dilapidated
parameters structures in merged areas
Water Supply – Individual house service connections to all the slum
households or group connections
Sewerage - Individual house service connections
Sanitation – Community toilets
Solid Waste Management - Coverage of all slum households under door-to-
door collection and awareness campaigns on source segregation
Desired 2013 2017 2019 2021 Remarks
outcomes Pucca housing for the 20% 40% 70% 100% -
urban poor
Allied infrastructure 20% 40% 70% 100% -
Action Plans Activities
Categorization The slums in new areas are to be surveyed to understand the status of
of slums infrastructure
Integrated Slum networking strategies to be adopted to improve the services in the
development of slums.
slums This would help in building the low cost service in the slums (especially in
water supply, sewerage, and SWM sector).
Rehabilitation of Pucca housing with infrastructure facilities to be developed in feasible
slums locations.
Construction of The slums in low lying areas and along the natural drains could be proposed
housing for relocation.
A suitable financing strategy could be developed to minimize the burden on
the beneficiaries.
The beneficiaries could be provided access to banks for availing the long-
term housing loans.
Access to health The health action plan should control the prevalent diseases and reduce the
and education infant mortality rate.
Access to emergency medical services should be provided to the BPL
population.
The education action plan should involve renovation of existing municipal
schools and regular awareness campaigns to limit the dropout rates.
Livelihood Activity centres to be established for skill development programmes
[198]
City Development Plan Allahabad – 2041
Ministry of Urban Development
restoration
Unit Rates Component Unit Unit Cost (Rs in Lakhs)
Estimated cost
Project Sub project
in Rs. Crores
A. Development of affordable
1. Construction of 8,852 dwelling units for
Housing and infrastructure 586
the Urban poor in the city
development
1. Establishment of vocational training
B. Livelihood development in
institutes enhance the skill of slum 9
the city slums
dwellers
1. Construction of Anganwadi and primary
schools in slums of the city
C. Development of Social 2. Construction of primary health centres in
46
infrastructure in the city the slums of the city
3. Establishment of community halls in the
slums
Total investment required for 2041 641
[199]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Social infrastructure
Design Schools, hospitals, socio cultural and parks and playground requirements
parameters assessed as per URDPFI guidelines
2021 2041
Component Existing
Demand Gap Demand Gap
Pre-primary
240 659 419 970 730
Demand gap school
assessment for Primary school 240 330 90 485 245
education Senior
secondary 57 220 163 323 266
infrastructure
school
School for
mentally - 2 2 2 2
challenged
2021 2041
Demand gap Component Existing
Demand Gap Demand Gap
assessment for
Dispensary 37 110 73 162 125
healthcare
Polyclinic 12 16 4 24 12
[200]
City Development Plan Allahabad – 2041
Ministry of Urban Development
infrastructure General
6 7 1 10 4
hospital
Multi-Specialty
Hospital 6 16 10 24 18
(NBC)
Veterinary
Hospital for
- 3 3 5 5
pets and
animals
Dispensary for
pet animals - 16 16 24 24
and birds
2021 2041
Component Existing
Demand Gap Demand Gap
Community
hall, mangal
karyayala, 10 330 320 485 475
barat ghar/
library
Music, dance
Demand gap and drama - 110 110 162 162
assessment for centre
Socio cultural Meditation and
infrastructure spiritual - 16 16 24 24
Centre
Recreational
2 16 14 24 22
Club
Old age home - 3 3 5 5
Temporary
resting sheds - 5 5 5 5
for boatmen
Cattle shelters
Identification of areas for development of new schools and hospitals.
Development of schools with hostel facilities and schools for specially
abled children.
Action Plans
Development of ward level community centers
Development of night shelters, old age home in the city limits.
Mapping of health care facilities in the city
Establishment of heritage cell at AMC headed by an architect to carry
out listing of heritage structures.
Undertake preparation of DPRs for restoration and refurbishment of
Heritage listed heritage structures on priority basis.
Management Creation of heritage fund to undertake small scale restoration works of
the identified heritage structures.
Installation of direction signage and information boards at appropriate
locations in the city.
Component Unit Unit Cost (Rs Lakhs)
Pre-primary LS 4
Primary school LS 6
Senior secondary school LS 10
School for mentally challenged LS 8
Unit rates General hospital LS 1300
Multi-Specialty Hospital (NBC) LS 600
Veterinary Hospital for pets and animals LS 30
Dispensary for pet animals and birds LS 30
Temporary resting sheds for boatmen LS 10
Community halls LS 8
[201]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[202]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[203]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Preservation of water
bodies as listed in Nil 40% 70% 100%
Desired following section
outcomes Mapping of water
bodies, urban forests,
Nil 60% 80% 100%
and buildings along
Ghats
Ducts/Conduits Nil 30% 60% 90%
Action Plans Activities
Mapping of
Mapping of water bodies and urban forests to be carried out to assess the
water bodies,
physical extent, cultural, natural and social value
urban forests
Pollution
Increasing the green cover and buffer zones in the city to mitigate air
mitigation
pollution in the city
strategies
Regular monitoring of air quality, water quality (surface and ground), and
Impact
noise pollution
assessment and
Carrying out environmental impact assessment prior to implementation of
monitoring
infrastructure projects
Developing Allahabad as disaster resilient city
Disaster Development of control room or city level service center
Management Development of emergency control responsive system
Mapping of water inundation areas in the city
Component Unit Unit Cost (Rs in Lakhs)
Studies to be undertaken Lump Sum per study 500
Tree plantation Lump Sum 50
Unit Cost
Ducts/conduits Per Km 15
Disaster management
Lump Sum 500
cell
[204]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Estimated cost
Project Sub project
in Rs. Crores
A. River Front 1. Construction of embankment, footpaths, streetlight, 350
Development on benches, drinking water facilities and toilets on three
three sides of the sides of the river. The alignment is-
river o North (towards Phaphamua) – Mehdaori
Goan, Teliarganj, Allahabad till irrigation
colony – approximately 3.6 Km
o South – From Kakrahaghat to new Ganga
flyover (NH-2) – approximately 4 Km.
o East – From Daraganj Ghat road to Bakshi
Band road – approximately 2 Km.
A. Studies to be 1. Emergency Management Plan and Disaster 15
undertaken Management and Mitigation Plan
2. GIS mapping of water bodies within AMC limit
3. Mapping of urban forests within the city
B. Disaster 1. Establishment of Disaster management cell at AMC 5
management cell with Emergency response system
C. Tree cover 1. Plantation of trees 1
D. Ducts/conduits 1. Ducts/ Conduits to house various cables 118
Total investment required for 2041 921
[206]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Project Details
Sound and light show, and laser show at Khusro Bagh, Allahabad fort, and
Developing new All Saint Church
attractions Audio-guides for all historical monuments
Water sports
Providing basic infrastructure on Sangam
Floating jetties on Ghats
Resting sheds for tourists
Improving Tourist information centres at Sangam and railway station
infrastructure Prepaid counters at Sangam, Railway Station and Bus Stand
Aesthetic lighting of Allahabad Fort, Khusro Bagh, All St Cathedral church
and Azad Park
Floating jetties
35
The detailed list of the tourist locations has been provided in the sector assessment.
[208]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Infrastructure Procurement of hardware and software for AMC and its zonal offices
Capacity Preparation of training needs assessment, training curriculum, identification
building and of training institutions. Support is also required in preparation of IEC material
training on various subjects.
Trainings to be imparted for preparation of note sheets, measurements book
and various business rules.
About 49% of the investment has been identified for traffic and transportation, 11% towards storm
water drains, 9% each of the investment has been identified towards water supply and urban
environment and disaster management; 8% of the investment has been identified towards sewerage
and sanitation; 6% towards housing for urban poor, 2% of the investment is towards solid waste
management.
The rest of the investment is towards local economic development and urban governance. The sector-
wise breakup of investment identified for 2021 is presented in the graph below.
[211]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Urban Governance
Tourism
Urban poor
Drains
Water Supply
[212]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[213]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[214]
City Development Plan Allahabad – 2041
Ministry of Urban Development
18.2 Methodology
For the preparation of FOP for AMC, we have adopted the following methodology as provided in the
revised CDP toolkit. The stage-wise methodology and the key references have been presented in the
table below.
[215]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[216]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Not Applicable
Step10 Component- Not Applicable
wise allocation
of combined
investible
surplus
servicing
mechanism,
etc.
[218]
City Development Plan Allahabad – 2041
Ministry of Urban Development
36
Overall the investment required for the year 2021-22 is Rs 6,350 crores. However, AMC would be responsible to take-up the
projects worth Rs 3385 crores and the remaining investment to be taken-up by the Parastatals/state government
departments. Therefore, the financial operating plan has been prepared for AMC with an estimated investment for Rs
3385 crores.
[219]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[220]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Head Assumptions
2015-16
Collection Performance 85% (Improvement on yearly basis considered from FY
2013-14 to FY 2025-26 from 74% to 85%)
New Taxes In order to achieve financial sustainability, improve the city‟s
(considered as improved case) infrastructure, and improving civic administration. The new
taxes which are possible to be levied has been identified
based on the applicable act.
Increasing the tax base of existing In order to achieve financial sustainability, improve the city‟s
taxes infrastructure, and improving civic administration.
(considered as improved case) Increase/revision of tax base which are possible has been
identified based on the applicable act.
Income Items- Water Supply
Individual Water Connections To achieve 100% individual water connections provision in all
the properties in Allahabad
Water Tariff revision 5% annual hike in water user charges
Next Revisions Annual revision as per current practice of AMC
Collection Performance 85% by FY 2025-26 (Improvement in current collection on
yearly basis by 5% considered from FY 2013-14 to FY 2025-
26)
80% by FY 2025-26 (Improvement in arrears collection on
yearly basis by 5% considered from FY 2013-14 to FY 2025-
26)
Income Items- Sewerage
Sewerage Connections To achieve 100% coverage by providing sewerage
connections
Sewerage Tax 12% of the ALV value for property value.
Collection Performance 85% by FY 2025-26 (Improvement in current collection on
yearly basis by 5% considered from FY 2013-14 to FY 2025-
26)
80% by FY 2025-26 (Improvement in arrears collection on
yearly basis by 5% considered from FY 2013-14 to FY 2025-
26)
37
The investible surplus = “(Revenue (own sources of income) income + capital (own sources of income) -
Revenue expenditure”. And, excluding the revenue and capital grants received for specific purpose
[221]
City Development Plan Allahabad – 2041
Ministry of Urban Development
180
160 97
140
80
120 62
62
Rs in Cr
100
80 39
56
60 48 26
35
39 14
34
40 28 26
24
20 12
The spread sheets of the FOP are presented in the Annexure. The following are the results drawn
with respect to investment capacity of AMC. Various possible scenarios for AMC towards sustainable
investment for short-term investment have been generated. Also two predetermined cases built, which
are Base case and improved case are explained as below:
Base investment capacity – This scenario is built on the past trends as the case is.
Improved investment capacity – This scenario is built on the presumption that AMC is going
to undertake reforms leading to its improved financial sustenance capacity. The reforms are
especially in the areas of property tax and water charges.
Further, within the above mentioned both cases, various options have been looked at, like AMC‟s
contribution without any grant support or debt; and AMC‟s contribution along with various government
grants. These scenarios have been tried and tested for both the discussed cases and based on the
FOP projected and various financial assumptions, the Property Tax
following results have been drawn with respect to the AMC should take maximum benefit from
investment capacity of AMC. “improvement of property tax collection”
project under CBUD project.
Total investment requirement (Short-term) – Rs 3385 Widening/ improving the coverage of
crores the property tax and maximise the no
of properties under property tax net
Based on the availability of grants, AMC can take up Widen the tax base and change in
priority projects in the area of urban transportation, storm revision of property tax policy
water drainage, water supply and housing for urban poor. 100% computerization of all the
Different possible sustainable investment scenarios to records and database
maximise the project implementation capacity for AMC Introduction of online assessment and
payment gateway
have been worked out and the details of each provided Introduction of robust monitoring and
below. dispute resolution mechanism
Restructuring of the administrative
system of department
[222]
City Development Plan Allahabad – 2041
Ministry of Urban Development
In this scenario, without any grant support from its own sources AMC can contribute Rs. 306
crores for the implementation of projects. The regular growth rate in property tax assessment
and property tax collection reforms achieved by AMC under JnNURM phase I will improve the
financial status of AMC.
The sustainable investment capacity is 7% in this scenario for AMC.
The income and expenditure growth would follow past trends. The regular capital expenditure
would grow at 8% on a year-on-year basis. AMC will have a financial commitment towards the
implementation of projects under JnNURM Phase I and new projects taken up recently under
the extended phase of JnNURM. Also, looking at the sustainable investment capacity in this
scenario, it was assumed that the minimum closing balance of Rs. 10 crore on a regular basis
is maintained.
Business-as-usual scenario with grant support: In this scenario, it is assumed that AMC shall do
business as usual and receive capital grants from the state and Central governments. This scenario
will indicate the overall capacity of AMC to take up projects in a business-as-usual scenario with grant
support.
[223]
City Development Plan Allahabad – 2041
Ministry of Urban Development
sustainable investment capacity in this scenario, it was assumed that the minimum closing
balance of Rs. 30 Cr. on a regular basis is maintained.
It is also very important that AMC should take into consideration the increasing operation and
maintenance expenditure. AMC has implemented a sewerage and SWD project and will be
implementing projects of STPs, collection network and underground drainage in next few years.
These investments will result in higher operation and maintenance expenditure.
In order to manage the increased O&M expenditure, implementation of reforms as mentioned below is
recommended, which will help AMC to meet 100% O&M cost recovery;
[224]
City Development Plan Allahabad – 2041
Ministry of Urban Development
priority projects in the areas of traffic and transportation, water supply, sanitation, and storm water
drainage.
Business as usual scenario: Rs. 306 crores
Base case scenario with grant support: Rs. 699 crores
Improved investment capacity with grant support: Rs. 1923 crores
Graph 2: Various scenarios for financial operating plan for short-term investment (2014-2021)
5000
4500 4371
4000
3500 3385
Rs in Crs
3000
2500
1923
2000
1500
1000 699
500 306
0
Total InvestmentTotal Investment Business as Business as Improved Case
- Constant - Current usual - Without usual - With Scenario : with
grant and Debt grant and Debt Grant +Debt
Estimated Revenue
Area Existing revenues Task
potential
[225]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Estimated Revenue
Area Existing revenues Task
potential
Outsourcing of certain functions: AMC should explore outsourcing of some functions in order
to reduce the establishment expenditure.
Moreover, AMC can outsource the clerical posts such as those of data entry operators and
clerks to reduce the establishment cost.
Reduction in capital expenditure
AMC is implementing projects through their municipal funds on a regular basis and also has a
financial commitment of 30% towards projects being implemented under JnNURM.
AMC has explored the PPP option for implementation of SWM project in the past. It is
recommended that the PPP option should be explored further for projects in the social sector
and other sectors.
AMC should focus on department wise budget preparation for O&M cost for newly created
assets, and provide the best practice to reduce the O&M cost on sewerage and solid waste
management
Carry out water and energy audit to reduce the O&M cost and water leakages (NRW)
[226]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Study the existing status of the assets of key sectors, prepare a tangible action plan for the
maintenance of assets, and provide the replacement list for the assets
Conduct workshops/trainings for the staff on management of O&M and best practices across
the states
Organize study tours for the staff and elected representatives for effective implementation of
reforms, for full O&M recovery
Latest techniques and technology to be adopted for management (inventory, maintenance
cycle, replacement time, etc.) of municipal assets
Conduct trainings in the area of asset management, new techniques for operation and
maintenance of assets
Project appraisal Alternations in project midway The appraisal agency should device a
format (MIS) listing all the necessary
criteria for evaluation and smooth
implementation of the project
Land acquisition Land related issues especially in The project map should highlight
case of water, sewerage and the infrastructure and the ownership
SWM projects for setting up of the land where it is to be
WTP, STP and landfill site established.
In case of land acquisition, the local
body should produce the consent of
the project displacement in advance
to the appraisal agency.
In case of land to be transferred
from one government authority to
another the consent of the same
should be taken in advance.
NOCs For instances a water pipeline All NOCs required should be
obtained before sanctioning of the
[227]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Packaging of Project is split into multiple sub- The project split should be in
project projects thereby awarding the accordance with the capacity of the
project to various contractors. ULB staff to monitor and manage.
These results in increased paper
work, complexity of managing
different contractors with fewer
staff, approvals by Executive
committee for every package.
For instance a water supply
branch network in the city is
awarded to various contractors.
[229]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Project financing
Lack of own contribution in Investment capacity of ULBs is
infrastructure projects crucial before sanctioning of any
project
Making budgetary provision in
advance for the capital expenditure
to be incurred
Separate bank account for the
project (all receipts and payments
should be managed separately; any
transfer of funds from other sources
should be highlighted and
reconciled accordingly)
Data base
One of the most common issues Any deviation from DPR
management
in most of the projects is lack of Planned and actual schedules
collation of database. Database Disbursement and utilization of
are important from two funds/ loans
perspectives -
Details of escalation payments
firstly it forms an evidence for made classified into quantity
addressing any related escalations and rate escalations.
dispute; Pre and post inventory of assets
secondly such database are with age and other relevant details
useful for deriving lessons Record of design, drawings and
which could be used for materials used for construction
similar projects Details of quality control tests, press
articles, disputes, photographs
during construction phase etc.
Maintaining Minutes of all the
meetings and proceedings for all
the projects
First and foremost, the accounts department of AMC should maintain a separate account for
all projects. Financial transactions such as deposits, grants and release of payments should
be carried out through the project account.
Carry out all the above-mentioned functions through e-governance modules developed by
AMC.
Transfer a part of the revenue surplus (own source of revenues) to the project account to
implement the project. A record of such transactions should be maintained.
Internal audit of the project accounts should be carried out on a quarterly basis. External audit
has to be carried out on an annual basis.
[230]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Possible PPP
Sector Development Key Aspects
interventions
38
Example of Mumbai flyovers - which are constructed and managed by private operator through collection of tolls. AMC can
levy toll or user fee on the heavy traffic entering the city or parking of trucks in the goods terminal and same revenue to be
used by the private operator for managing the infrastructure. Review of the model adopted by MSRDC should be carried
out.
[231]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Possible PPP
Sector Development Key Aspects
interventions
AMC should initiate an inventory of land parcels available in the city. Further, AMC should
create a database of the same and a land bank
AMC should crosscheck the proposed land use as per the development plan. If required,
AMC needs to initiate land use revision in the records
AMC may explore available land parcels that can be used for development of affordable
housing projects, parking projects, real estate projects and convention centers. Even these
projects can be implemented on PPP basis
New tax and revision of base for existing taxes: AMC should explore or propose the levy
of a new tax, which will be as per the applicable act. Also, regular revision of the tax base of
existing taxes and rates for rent should be exercised.
Property tax: On an immediate basis, the reforms to be implemented in property tax to
improve the coverage and collection efficiency; the reforms must start with restructuring of the
department.
[232]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Water and sewerage: Water and sewerage tariff structures must be revised immediately.
AMC should explore the volumetric tariff structure for metered water connections
SWM charges: AMC should levy user charges on SWM services – AMC may explore this
initiative as part of property tax.
Establishment expenditure: The outsourcing option should be explored in the establishment
department as well as in the operation and maintenance of assets. If possible, reduction of
staff and optimum resource utilisation through the use of sophisticated technology should be
explored
PPP route: AMC should explore the PPP route to implement either the projects or project
components.
O&M new assets: AMC should ensure that the contractor/private operator appointed will
carry out O&M of the assets (WTP and STP plant) for a period of 5-8 years after completion
of the test runs.
Regular capital works: AMC should curtail its regular capital expenditure over the next 5-10
years. AMC should take up only priority works first and also projects possible on PPP basis.
Capacity-building: It is very important that AMC should keep on imparting training to the
staff on various aspects, from technical to managerial skills.
Study tours: AMC should organise study tours to know the best practices carried out for
some of the core services and also to understand the challenges faced by other cities in the
implementation of projects and reforms
[233]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Process Design
Analyzing and
discussing the process
Action Plans and Action Plans and
and results achieved at
Implementation Implementation
all stages
Translating the vision, Gathering all stakeholders‟
goals and priorities into views on what needs to be
achievable programs and done
projects
Vision, Goals and
Objectives
Developing a clear, shared
vision plus agreed goals and
priorities for action.
[234]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Table 19.1: Framework for Monitoring and Evaluation of various components in the CDP
Sr. No. Framework for Updating and Reviewing City Development Plan (CDP) to make it a living
document
Year
Year
Year
Year
Year
Year
Year
Activity
1
7
1 Reviewing CDP Document √ √
2 Community and Stakeholder √ √ √ √ √ √ √
Consultation
3 Data Update and Mapping the √ √
City
4 Capacity Building √ √ √ √ √
5 Planning Building Regulations √ √
Reforms
6 Property Tax Reforms √ √ √ √ √ √
7 Institutional Reforms √ √ √ √ √
8 Financial Reforms √ √ √ √ √
9 Sectoral/Ward Development √ √
Plans
10 Review of Project Priorities √ √ √
11 Financial Operating Plan √ √
12 Capital Investment Plan √ √
Source: Revised City Development Plan toolkit
[235]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[236]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[237]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Bibliography
[238]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Annexure
Participants
CRISIL Risk and Infrastructure Solutions Limited (CRIS)
Mr. Ravi Poddar, Director, Urban Practice
Mr. Brijgopal Ladda, Urban Planning Expert
Mr. Abhay Kantak, Municipal Finance Expert
Mr. K.K Shrivastava, Municipal Engineering Expert
Mr. Tapas Ghatak, GIS Expert
Mr. Appeeji Parasher, Associate Director
Ms. Monika Bahl, Manager
CRISIL Risk & Infrastructure Solutions Limited (CRIS) has been appointed by Ministry of Urban
Development (MoUD) for the Preparation and Revision of City Development Plans for 13 Selected
Cities under Package 1 and 17 selected cities under Package 2. A kick-off meeting was organized by
MoUD to review the work plan and approach for the assignment. The meeting was chaired by Ms.
Nisha Singh IAS, Joint Secretary and Project Director and was attended by senior officials from
MoUD, PMU from CBUD and officials from TCPO, CPWD.
CRIS Team made a presentation on the following aspects
Our Experience in Preparation of CDPs
Details of Assignment Coverage
Our Approach - Revised CDP toolkit
Proposed Teaming
Work Plan
Support from MoUD
Following were the key points suggested by MoUD /CBUD PMU team and other key officials present
during the meeting
[239]
City Development Plan Allahabad – 2041
Ministry of Urban Development
1. Various recommendations were made by the participants for preparation of CDP. The Mission
Director however suggested that the CDPs shall be prepared in line with the revised tool kit
issued by MoUD and also mentioned that MoUD has prepared a comparison of variance
nd
between the first generation and 2 generation CDPs and it shall provide a copy of the same.
2. It was also mentioned that an inclusive approach should be adopted as specified in the tool kit
and sufficient emphasis should be made on strategies addressing urban poverty issues.
3. It was also suggested that cities have prepared other plans like CSP, CMP, disaster
management etc. The interventions, projects, costing etc. suggested in this studies should be
incorporated in the CDP. MoUD also suggested for sharing information from ISNA study to
consultant for CDP such to synchronize the two reports.
4. The Mission Director also stressed on to focus on efficiency improvement related aspects
while identifying projects in cities.
5. It was discussed that the population projection in all the CDPs shall be for a period of 30
years i.e. 2041 whereas the FOPs can be made for a period of 20 years to be realistic. All
CDPs should have same time line for projections and should be based on Census 2011.
6. Some other aspects discussed were as follows
24x7 Water Supply and implementation of SCADA and other new system to bring in
efficiency, 100% metering etc.
Linkages with existing Development Plan or Master Plan
CDP should also endeavor to mention of suitable technologies based on the geographical
condition of the cities.
Local Economic Development – Enlist the key thrust areas of economic development and
broad level strategies
Map preparation
Smart cities concepts should be explored
7. It was suggested that CDPs should be made through rigorous stakeholder consultations and
the ownership should be ensured at the city level.
8. It was suggested to have the executive summary to the Final CDP in vernacular language.
9. The timelines proposed for the assignment were found to be in line with that mentioned in the
RFP.
During the presentation CRIS suggested the following points for support from MoUD
1. The team would require a letter of Introduction from MoUD to ensure that all the ULBs can
assist the team in the following
Designate an “Officer-In charge” responsible for management and coordination of
consultants
Constitute multi-stakeholder City Level Steering Committee and working groups.
Nominate officers from relevant sections of ULB to participate in the process of
stakeholder consultation and CDP preparation.
Provide the consultant with information, maps and relevant data and documents on ULB.
Provide the consultant with necessary authorization to procure information from the line
departments
1. Introducing the consultants to the Urban Local Bodies
2. Facilitate and expedite approvals from ULB.
The meeting ended with a vote of thanks to all participants.
[240]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Inception meeting
Minutes of meeting
Meeting Agenda Inception meeting for Revised City Development Plan of Allahabad city
th
Place/ Location/ Allahabad Nagar Nigam Office on 26 September 2013 at 3:00 PM
Date/ Time
Mayor, ANN
Municipal Commissioner, ANN
Secretary, ADA
Additional Municipal Commissioner, ANN
General Manager, Jal Sansthan
Executive Engineer, Jal Nigam
Representatives from ADA
Member of PIU, ANN
CRISIL Risk and Infrastructure Solutions Limited:
Mr. Tapas Ghatak, Sector Expert
Mr. Rahul Sethi, Consultant
The meeting was chaired by the Honourable Mayor and attended by the Municipal
Commissioner, department heads, and representatives of various parastatals.
Mr. R K Dwivedi, HR Officer briefed the officials about the agenda of the meeting and all the
members present introduced themselves.
The CRIS team initiated the meeting by giving a brief about the CBUD programme and the
need to revise the CDP. Thereafter, the CDP preparation process was detailed to the officials
present, including key CDP highlights, guidelines, and our approach and methodology for the
revision of CDP.
During the discussion, CRISIL team requested the officials to share their experiences during
the preparation of the old CDP. In addition, CRIS also asked the officials present if they could
st
comment why some other projects in the 1 generation CDP were not taken up and their
current status.
The senior officials have changed over the last five years, so the officials present were not
aware of the details of the CDP preparation process followed earlier. However, on the
projects identified in the CDP, they mentioned that some of the projects were not a priority at
that time. But these projects may be considered in the revised CDP.
Stakeholder workshop is the central idea around which the preparation of CDP revolves. The
CRIS team requested the officials present to ensure stakeholder participation by identifying
stakeholders to be present in the workshops to share their views.
The Secretary, ADA was of the view that stakeholder interactions should be initiated an on-
going process and not just during the workshops.
The Honourable Mayor was also of the view that importance should be given to the
stakeholder workshops and suggestions provided by the stakeholders should be taken into
[241]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Thereafter, the CRIS team requested the Honourable Mayor and Municipal Commissioner to
appoint a nodal officer for coordinating in all aspects of CDP, form CDP policy and technical
committees, and identify stakeholders to participate in the stakeholder meetings/workshops.
To this it was agreed, that CRIS will share a tentative list of committee members and share
with ANN. Thereafter, ANN will finalize the members of the committees and appoint a nodal
officer.
It was also decided that list of stakeholders for the workshops will be prepared in the due
course of time.
[242]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Attendance sheet
[243]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Mayor, ANN
Municipal Commissioner, ANN
Add. Municipal Commissioner, ANN
Secretary, Allahabad Development Authority
Project Officer, DUDA
General Manager, Jal Kal
Chief Engineer, Jal Nigam
Regional Manager, Transport
Health Officer/CMO, Health Department, ANN
Chief Engineer, ANN
Regional Tourist Officer, Tourism Department
Regional Officer, UP Pollution Control Board
Dy. Controller Civil Defense, Disaster Management Department
Chief Treasury Officer, Accounts, ANN
CTAO, Taxation, ANN
ADMC, District Administration
SP, Traffic
Chief Fire Officer
Any other representatives which ANN may wish to include at a later stage, for example local
NGOs.
CDP Technical Committee
[244]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Interim workshop
Minutes of workshop
[245]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[246]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[247]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[248]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[249]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Attendance sheet
[250]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Final Workshop
Minutes of meeting
Meeting Agenda Final workshop meeting for Revised City Development Plan of Allahabad city
th
Place/ Location/ Allahabad Nagar Nigam Office on 20 March 2015 at 2:00 PM
Date/ Time
Mayor, ANN
Municipal Commissioner, ANN
Secretary, ADA
Additional Municipal Commissioner, ANN
General Manager, Jal Sansthan
Executive Engineer, Jal Nigam
Representatives from ADA
Member of PIU, ANN
Corporators
CRISIL Risk and Infrastructure Solutions Limited:
Mr. Appeeji Parasher, Associate Director
Mr. Jyoti Prakash Majhi, Associate Consultant
The meeting was chaired by the Honourable Mayor and corporators, department heads, and
representatives of various parastatals.
Mr. R K Dwivedi, HR Officer briefed the officials about the agenda of the meeting and all the
members present introduced themselves.
The CRIS team initiated the meeting by giving a brief about the CBUD programme and the need
to revise the CDP. Thereafter, the CDP preparation process was detailed to the officials present,
including key CDP highlights, guidelines, and our approach and methodology for the revision of
CDP.
Highlight of the meeting was discussion on the development of smart cities and its way forward.
Mr. Appeeji Parasher from CRISIL gave a brief of various other schemes such as Swachh
Bharat Abhiyan, New Urban Development Mission and Smart Cities.
CRISIL team presented the overall fund allocation across various sectors, project costing‟s and
departmental division of fund requirements.
The Honourable Mayor was also of the view that importance should be given to the stakeholder
workshops and suggestions provided by the stakeholders should be taken into account while
preparing the CDP.
[251]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Attendance Sheet
[252]
City Development Plan Allahabad – 2041
Ministry of Urban Development
% growth in
Population as per Census Population as per
Name of district population
2001 Census 2011
(2001-11)
Uttar Pradesh 166,197,921 199,812,341 20%
Allahabad 4,937,266 5,954,391 21%
Moradabad 3,810,983 4,772,006 25%
Ghaziabad 3,314,070 4,681,645 41%
Azamgarh 3,939,916 4,613,913 17%
Lucknow 3,647,834 4,589,838 26%
Kanpur Nagar 4,167,999 4,581,268 10%
Jaunpur 3,911,679 4,494,204 15%
Sitapur 3,619,661 4,483,992 24%
Bareilly 3,618,589 4,448,359 23%
Gorakhpur 3,769,456 4,440,895 18%
Agra 3,621,702 4,418,797 22%
Muzaffarnagar 3,543,362 4,143,512 17%
Hardoi 3,398,306 4,092,845 20%
Kheri (Lakhimpur Kheri) 3,207,232 4,021,243 25%
Sultanpur 3,214,832 3,797,117 18%
Bijnor 3,131,619 3,682,713 18%
Budaun 3,069,426 3,681,896 20%
Varanasi 3,138,671 3,676,841 17%
Aligarh 2,992,286 3,673,889 23%
Ghazipur 3,037,582 3,620,268 19%
Kushinagar 2,891,667 3,564,544 23%
Bulandshahr 3,009,860 3,499,171 16%
Bahraich 2,701,478 3,487,731 29%
Saharanpur 2,896,863 3,466,382 20%
Meerut 2,973,877 3,443,689 16%
Gonda 2,765,586 3,433,919 24%
Rae Bareli 2,872,335 3,405,559 19%
Bara Banki 2,673,581 3,260,699 22%
Ballia 2,760,667 3,239,774 17%
Pratapgarh 2,731,174 3,209,141 18%
Unnao 2,700,324 3,108,367 15%
Deoria 2,714,179 3,100,946 14%
Shahjahanpur 2,464,930 3,006,538 22%
[253]
City Development Plan Allahabad – 2041
Ministry of Urban Development
% growth in
Population as per Census Population as per
Name of district population
2001 Census 2011
(2001-11)
Mahrajganj (Maharajganj) 2,173,878 2,684,703 23%
Fatehpur 2,308,384 2,632,733 14%
Siddharthnagar 2,040,085 2,559,297 25%
Mathura 2,074,516 2,547,184 23%
Firozabad 2,081,752 2,498,156 20%
Mirzapur 2,074,709 2,496,970 20%
Faizabad 2,088,928 2,470,996 18%
Basti 2,084,814 2,464,464 18%
Ambedkar Nagar 2,026,876 2,397,888 18%
Rampur 1,923,739 2,335,819 21%
Mau 1,854,950 2,205,968 19%
Balrampur 1,682,350 2,148,665 28%
Pilibhit 1,728,108 2,031,007 18%
Jhansi 1,744,931 1,998,603 15%
Chandauli 1,643,251 1,952,756 19%
Farrukhabad 1,570,408 1,885,204 20%
Mainpuri 1,596,718 1,868,529 17%
Sonbhadra 1,504,852 1,862,559 24%
Amroha (Jyotiba Phule Nagar) 1,499,068 1,840,221 23%
Banda 1,501,602 1,799,410 20%
Kanpur Dehat 1,563,336 1,796,184 15%
Etah 1,531,645 1,774,480 16%
Sant Kabir Nagar 1,420,226 1,715,183 21%
Jalaun 1,454,452 1,689,974 16%
Kannauj 1,388,923 1,656,616 19%
Gautam Buddha Nagar 1,105,292 1,648,115 49%
Kaushambi 1,291,993 1,599,596 24%
Etawah 1,338,871 1,581,810 18%
Sant Ravidas Nagar (Bhadohi) 1,353,705 1,578,213 17%
Hathras (Mahamaya Nagar) 1,336,031 1,564,708 17%
Kasganj (Kanshiram Nagar) 1,228,705 1,436,719 17%
Auraiya 1,179,993 1,379,545 17%
Baghpat 1,163,991 1,303,048 12%
Lalitpur 977,734 1,221,592 25%
Shrawasti (Shravasti) 855,985 1,117,361 31%
[254]
City Development Plan Allahabad – 2041
Ministry of Urban Development
% growth in
Population as per Census Population as per
Name of district population
2001 Census 2011
(2001-11)
Hamirpur 993,792 1,104,285 11%
Chitrakoot 801,957 991,730 24%
Mahoba 758,379 875,958 16%
Source – Census of India
11 Laouder Road 24
14 Phaphamau Marg 45
16 Bank Road 18
17 Mission Road 18
[255]
City Development Plan Allahabad – 2041
Ministry of Urban Development
19 Leader Road 24
20 Khusrobagh Marg 30
22 Nurullah Marg 24
25 Zero Road 18
26 Tilak Marg 18
28 Triveni Road 24
32 Suleman Marg 18
33 Mutthiganj Marg 18
38 Old GT Road 24
41 Faizabad Road 60
[256]
City Development Plan Allahabad – 2041
Ministry of Urban Development
[257]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Right of way
18 GT Road 20-31
[258]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Allahabad Fort
1. Allahabad
(i) Ashoka Pillar (Inscribed stone pillar)
Khusru Bagh :-
3. Allahabad
(i) Enclosure wall and Gateway of Khusru Bagh
[259]
City Development Plan Allahabad – 2041
Ministry of Urban Development
9. A rocky hall on the south face of the top bearing an Ginja Hill
inscription of three lines of Indo-Scythian period in red
paint with some rude drawings of men and animals
[260]
City Development Plan Allahabad – 2041
Ministry of Urban Development
Municipal Finance
Avg (2008- CAGR (2008-
2008-09 to 2009-10 to 2010-11 to 2011-12 to
S. No. Account Head 2008-09 2009-10 2010-11 2011-12 2008-09 2009-10 2010-11 2011-12 09 to 2011- 09 to 2011-
2009-10 2010-11 2011-12 2012-13
12) 12)
Rupees Lakh Percentage Percentage per Annum
Summary - Municipal Account
Opening Balance 4,362.5 6,936.8 3,267.2 3,795.0
Revenue Income
General Account 5,990.8 6,057.8 8,730.5 9,347.4 100.0 100.0 99.9 99.4 99.8 1.1 44.1 7.1 -100.0 16.0
Water Account 0.0 0.0 12.1 54.3 0.0 0.0 0.1 0.6 0.2 - - 350.2 -100.0 -100.0
Sewerage Account 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 - - - - -
Revenue Expenditure
General Account 6,183.0 6,772.0 8,919.3 9,131.1 98.4 99.2 98.9 99.4 99.0 9.5 31.7 2.4 -100.0 13.9
Water Account 81.8 44.7 82.9 44.3 1.3 0.7 0.9 0.5 0.8 -45.4 85.6 -46.6 -100.0 -18.5
Sewerage Account 19.6 11.1 12.7 12.2 0.3 0.2 0.1 0.1 0.2 -43.3 14.1 -3.8 -100.0 -14.6
Debt Servicing 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 - - - - -
Capital Account
Capital Income 6,158.1 12,939.6 12,285.4 15,362.8 100.0 100.0 100.0 100.0 100.0 110.1 -5.1 25.0 -100.0 35.6
Capital Expenditure 3,290.3 15,839.2 11,485.3 15,807.0 100.0 100.0 100.0 100.0 100.0 381.4 -27.5 37.6 -100.0 68.7
Sloe Chapters/Contents Appraisal Comments and Remarks - Interim ATR by Consultant Comments on Draft CRISIL Response
Report CDP
1 Project The Chapter should have reviewed the 1st A brief snapshot of the Review of 1st Generation Section 2.6 has
Background generation CDP and clearly explained in terms 1st CDP and envisaged been updated with
of investments in urban infrastructure in the city investment have been detailed information
generation CDP has st
envisaged vis-a-vis actual investments under given. on the 1
been
the JNNURM Ph-I. Generation CDP.
However, no status of
mentioned in Table 1.
projected needs to
The projects proposed quantify % of projects
Further in table 3
in undertaken and physical
and table 5
and financial progress
the 1st generation CDP physical and
with estimated completion
have been mentioned in financial
or commission timelines.
Table 2 and projects progresses of the
approved along with JnNURM projects
their current status are mentioned.
have been mentioned in
Table 3.
2 Physical settings The Chapter may include information on Data pertaining to Comments broadly Regional location
relative humidity, rainfall, wind direction and rainfall incorporated Regional with respect to the
circulation in a city determines the level of location of centres w.r.t distance is
and humidity has been
comfort and factors conducive for developing distance and time may be discussed in
various activities. Further, how the topography provided in section given in grades of section 3.1. The
has influenced the spatial growth of the city. 2.5.2. significance. Sec 2.4 location of centres
Section 2.3 heading Study area may be w.r.t to time would
Details of geology along
elaborated by the be incorporated.
mentions about Geology, however, there is no
with along with a temporal spread of the
description of the same. Further, description on
geology town and area inclusions.
water and forest resources may also be
The Study area
included. map has been provided which is considered
in section 2.5.1 Sec 2.5.3 could have as the
given a broad share of agglomeration area
Primary- is defined as per
Sloe Chapters/Contents Appraisal Comments and Remarks - Interim ATR by Consultant Comments on Draft CRISIL Response
Report CDP
the growth factors
Details on water Secondary-Tertiary
and spread of the
resources and forest breakup with the leading
town which is
resources have been economic drivers of
discussed in
provided in sections development.
chapter 6 of the
2.5.4 and 2.5.5 revised draft.
respectively.
Water and other natural
resources needs to be Not Incorporated.
Details on wind more quantified in terms The share of
direction of Primary-
Secondary-Tertiary
will be included in availability and use
breakup would be
revised draft CDP. percentage. incorporated.
Sloe Chapters/Contents Appraisal Comments and Remarks - Interim ATR by Consultant Comments on Draft CRISIL Response
Report CDP
be desirable to analyse changes from census Graph is not appropriate,
Age-sex distribution has
2001 in terms of occupation pattern and other needs to be reworked
indicators like work participation ratio along with been provided in with proper graphics and
projections for horizon period and contribution section legend.
Not incorporated.
of the city to district domestic product.
3.6.1
Occupational pattern not
The Chapter may also assess the impact of discussed in broad terms. The WPR of the
floating population on the infrastructure of the Population on the basis two decades is
of religion has been WPR or economic effects discussed in in
city. The Chapter needs to include density map.
discussed in section 3.7 of demographic changes section 5.4
If data for parameter concerned is not available and language in section in CDP has not been
for Census 2011 especially for migration, then 3.8. mentioned.
Census 2001, figures may be indicted.
Peak and Average
Floating has been
Migration as per mentioned, but they have
Census 2001 has been
not been assessed for
discussed in section
growth patterns over the
3.10. Change in
period of study.
occupational pattern
has been discussed in
section 4.4
Sloe Chapters/Contents Appraisal Comments and Remarks - Interim ATR by Consultant Comments on Draft CRISIL Response
Report CDP
mentioned. Secondary-Tertiary
Future estimated working population may also Future estimated
share of
be included in accordance with the population working Economic growth trend
employment is
projections. and promising sectors
population will be incorporated.
have not been highlighted
included in accordance
for strategic focus.
with the population
projections in the No sectoral analysis with Various State
revised draft CDP. identification of lead Policies which
projects for economy has supports the
been undertaken. economic growth
have been detailed
No identification of future
in section 5.2.
needs of land or
Further based on
infrastructure for 3
the SWOT Tourism
sectors of economy in the
is one of the sector
CDP.
that has been
Informal sector has not highlighted as the
been included in the promising sector.
report.
In section 5.3.1 of
the revised draft
report the
requirement of the
land for various
industries is
incorporated.
Sloe Chapters/Contents Appraisal Comments and Remarks - Interim ATR by Consultant Comments on Draft CRISIL Response
Report CDP
the city
5 Land use and The existing land use has not been discussed Spatial growth trends Critical appraisal of Not incorporated
Urban where as Table 16 provides proposes land use have been discussed in Master Plan has been
which should be compared with prescribed land section 5.4. undertaken but is not
Planning
use as per URDPFI Guidelines, 2014. enough quantified or
As mentioned in the
substantiated for
How city has grown spatially over the past and report, the city is
assessing the need of
what are the constraints being felt in planned growing on all the three
change in Plan or
development should clearly be highlighted. The sides. The
redirection of growth
availability of developed land at appropriate
ongoing infrastructure strategies.
locations and the potential for further
development through extension of infrastructure projects encompass the
also needs to be explained clearly.
Decentralization of Land use comparison to
How the city can really be planned and the Landuse
developed in a metropolitan planning economic activities in
the URDPFI Guidelines, 2014 comparison with
perspective should also be discussed. the URDPFI
is needed to find the
city will be highlighted Guidelines is
How decentralization of economic activities can shortcoming of the
in the revised report. already
be thought off also highlighted while discussing proposed share of
core (CBD) areas of the city. landuse and suggest incorporated in the
changes to the TCPD for Table 26. Further
A section on land dynamics/land market of the A section on land analysis on the
revision of Master Plan.
city may also be included. Spatial along with landuse is briefly
temporal growth of the city to be shown of map. market will be
discussed in
included in revised draft section 6.6.1.
CDP. Some comments
will be discussed with
stakeholders during
workshop.
6 Social and The Chapter has to realistically assess the The shortfall in None of the comments Not incorporated
Cultural availability of the social facilities in terms of availability of health, have been incorporated based on the
Environment shortfalls which further has to be compared with education and fire and the chapter needs to limitations of the
Sloe Chapters/Contents Appraisal Comments and Remarks - Interim ATR by Consultant Comments on Draft CRISIL Response
Report CDP
norms and standards prescribed by URDPFI services has been be revised as per the available
Guidelines, 2014. No description on availability calculated on the basis CDP toolkit and information/data.
of recreation facilities. Further, being the of URDPFI guidelines, addressing all sectors of
important religious centre of the country , how 2014. The gap analysis the
the city offers conducive social and cultural has been provided in Maps showing the
Social and Cultural
environment in terms of social inclusion, gender table 27. location of health
sensitivity and human rights are to be Infrastructure needs of and education
Recreational facilities in
discussed in detail. How tourism contributes to the town. facilities
the city have been
the regional economy should also be clearly incorporated.
discussed in section
reflected in the Chapter.
6.5.
Without that the CDP is
Maps showing the location of health and
incomplete.
education facilities to be included.
There is no source of
information in terms of
social and cultural
environment in terms of
social inclusion, gender
sensitivity and human
rights.
In the absence of
documented
information, it would be
difficult to qualify the
contribution of tourism
to total economy of the
city.
Sloe Chapters/Contents Appraisal Comments and Remarks - Interim ATR by Consultant Comments on Draft CRISIL Response
Report CDP
7 Assessment of The Chapter is well written highlighting the Waste water generation Comments of Water
Urban Services changes in the availability of services since the on the basis of source supply appropriately
status at the time of preparation of 1st is not available. incorporated.
Generation CDP. Table 20 mentions about
Areas with less hours of Sewerage: Future
Future requirement
Water supply in terms of service level water supply will be requirement at the are accessed
benchmark and the per capita water availability mentioned in the horizon to be stated with considering the
is 253 LPCD against the benchmark of 200 revised draft CDP achievement strategies existing and
LPCD which signifies better scenario in terms Better maps have been w.r.t the existing and the ongoing
upgradation
of water supply, however it has to be enclosed along with the ongoing upgradation
projects.
ascertained the intra city variation in water report. projects.
supply. Similarly in Section 9.2.4, category of
SWM: Plant description
sources of waste water generation –domestic,
does not specify
industrial and commercial may be indicated.
technological details and
The water supply augmented from ground
space requirements for The space
water sources may be also be included requirement had
the Plan horizon have
especially in terms of ground water extraction been addressed in
been given.
vis-a-vis ground water recharge. table 106 of the
revised draft further
Maps showing the water network /sewerage details are
network are not clear. Storm Water Drainage: addressed in
section needs the current section 18.4.3
coverage of Drain along
roads and future needs
Table 110
for adequate drainage addresses the
and servicing low lying current coverage
areas. and future
requirements for
the adequate
drainage.
Sloe Chapters/Contents Appraisal Comments and Remarks - Interim ATR by Consultant Comments on Draft CRISIL Response
Report CDP
8 Roads and Section 10.1 may be discussed in terms of road A section on road The City does have a Modal share is
hierarchy (Arterial/Sub-arterial/ Collector hierarchy has been Draft CMP that has been addressed in figure
Transportation
roads.) A section on modal share may also be included; section 8.1.1. referred. 33.
included. Deficiency in the transport However, Parking Road Hierarchy is
infrastructure to be clearly highlighted in terms facilities /Street discussed in
Model share has been
improvement / Urban section 9.1.1 of the
of strengthening of roads/public transport. Need provided in section
Design needs have not revised draft.
for preparing. Comprehensive Mobility Plan 8.2.2.
been specified.
may also be emphasized. A section on Parking facilities is
Other comments not discussed in
integration of transport and land use also to be
Public transportation incorporated. section 9.2.4 of the
included and along with presence of mixed land has revised draft report.
use/commercial streets and its impact on traffic
discussed in section
circulation 8.2.3
This section would
The road network map as per the hierarchy and issues have been be updated on the
may be included. URDPFI, Guidelines, 2014 to integrated landuse
highlighted
be referred. and transportation
planning
9 Housing and Section 11.2 has to be discussed clearly with Total number of houses Housing requirement has Section 10.1
the total number of houses vis-a-vis in Allahabad Population been specified for 2041, mentions the area
Urban Poverty
households. What is the proportion of living in slums has been but no analysis has been allocated in the
population living in slums also to be indicated. provided in section done in term of land master plan for
Maps showing the locations of slums be 9.2.1. requirement and housing purpose.
included in the Chapter. allocation @ 2041. Land requirement
Map with location of
would be further
slums is not available.
incorporated.
Section 10.2.5 in
the revised draft
addresses the
Urban poor have found
supply measures
mention but not
Sloe Chapters/Contents Appraisal Comments and Remarks - Interim ATR by Consultant Comments on Draft CRISIL Response
Report CDP
addressed with quantified taken up by Gov.
need of EWS/LIG or other for EWS and LIG
housing. category.
10 Urban The Chapter has only discussed the existing Environmentally Chapter has not Not incorporated
Environment status of the air and water pollution; however, it sensitive undertaken any
as detailed
has to be ascertained to what extent the quantitative assessments
areas have been Information not
environment of the city has been deteriorated of all aspects of Urban
discussed in section available.
over a period of time. The Chapter may also Environment and pollution
10.4
discuss areas of natural heritage and and the planning
environmental sensitivity. Sections on disaster strategies or needs to
management have improve.
The Chapter is silent on disaster management.
been included. Sections
10.5 and 10.6.
Mere listing does not
Natural heritage has
provide for
been discussed in comprehensive plans.
chapter 12.
Proper quantitative
There are no analysis may be
environmental studies undertaken and reported.
taken up to ascertain
the damage to
environment over a
period of time.
11 Climate Change No issues related to the Not incorporated as
and Sustainable city have been discussed relevant
Development and no action plan for
Information not
mitigating the adverse
available.
effect of Climate Change
has been discussed.
12 Cultural The Chapter has to highlight major problems The status of HCC and No comments have been Strategies
Resources and being faced in restoring /maintaining the historic steps needed to restore incorporated, no incorporated in
Heritage and cultural significance and what value non-ASI protected quantitative analysis table 122 of the
Sloe Chapters/Contents Appraisal Comments and Remarks - Interim ATR by Consultant Comments on Draft CRISIL Response
Report CDP
addition they provide to the city and the heritage sites in the city forwarded revised draft report.
surroundings. It may also be mentioned will be mentioned in the
Issues and strategies
whether Heritage Conservation Committee revised draft CDP.
have to be worked out for
(HCC) has been constituted and what steps are
Conservation and
required to restore the non ASI protected
promotion. Listing of non-ASI
heritage sites/buildings/precincts in the city. Problems being faced
in restoring will be This chapter may be monument and
mentioned under key totally reworked for rehabilitation of
issues. revised submission. Heritage Structures
is taken up in
projects.
13 Assessment of The status of implementation of 74th CAA may Category wise number 74th CAA functions have not incorporated
be discussed in terms of constraints being of employees has been been discussed.
institutions, information not
faced in the effective implementation of the provided in table 72.
systems Projects under JnNURM available
same.
Status of JNNURM not included but the
and capacities
Status of JNNURM Ph-I projects and reforms projects has been reform status has been
undertaken may be included in the Chapter. provided in table 3 and reported.
status of reforms has
How the urban governance needs to be
been provided in
streamlined to be discussed in view of E-
section 13.2. Streamlining of
Governance initiatives by the local body.
Governance: Need of
Actual positioning of Staff in local body may be technical and support
indicated in order to assess the capacity to manpower and TNA
implement various programmes. needs @ horizon of 2041
has to be included.
14 Municipal In overall, Chapter has given the detailed A section comparing Chapter does not address All the comments
Finances information on revenue account vis-a-vis capital the % efficiency of had been
municipal finances with
account of the local body, however it would be collection of Tax or Non- incorporated
1st generation scenario
desirable to compare with the 1st Generation tax revenue.
will be provided in
CDP scenario and to what extent the local body
revised draft CDP.
Sloe Chapters/Contents Appraisal Comments and Remarks - Interim ATR by Consultant Comments on Draft CRISIL Response
Report CDP
has improved its financial position although the
Sustainable accounting of
same seems to be in deficit with total revenue
the ULB has to be shown
in 2012-13 was Rs.. 441 crore against the The CIP and FOP
in the CDP
expenditure of Rs. 476 crore. The Chapter may envisaged in the 1st
also review the CIP and FOP envisaged in the generation CDP will
1st Generation CDP. also be reviewed.
15 SWOT Chapter is incomplete Section 17.7.1
without ranking and addresses the
prioritization of sectors focus and
and projects prioritized sectors.
16. Stakeholders The Chapter needs to mention about The chapter will be Consultation outcomes The Consultation
Consultations, Organization revised in line with the are to be listed in outcome would be
comments. priorities approved by the relisted based on
Framework for the CDP process duly
CPC or the CTG. the priority.
mentioning about constituting CDP Policy and
Technical Committees and Groups. The SWOT This may be undertaken
SWOT analysis will be
Analysis appears to be sketchy and needs by the CDP team
elaboration. detailed out in the
revised draft CDP.
The Chapter requires much improvement
especially the inputs received during the
consultations and how to prioritise the projects
to cater to the needs of the city.
17 Vision formulation The chapter misses out Incorporated in the
on the Sectors of a CDP 4 development
Goals & Strategies
like; goals of Section
17.8.
Economic Development,
Social Infrastructure,
Municipal Assessment,
Urban Environment
Heritage Management
Bengaluru Ahmedabad
W-101, Sunrise Chambers, 706, Venus Atlantis,
22, Ulsoor Road, Near Reliance Petrol Pump
Bengaluru - 560 042 Prahladnagar,
Phone : 91-80-2558 0899 Ahmedabad - 380 015
Fax : 91-80-2559 4801 Phone : 91-79-4024 4500 Visit us at:
Fax : 91-79-2755 9863 www.crisil.com
CRISIL Infrastructure Advisory is India‟s premier advisor focusing on policy issues, as well as commercial and contractual issues in
the areas of transport, energy and urban infrastructure. We also provide support to international firms planning investments in
India. Over a period of time, CRISIL Infrastructure Advisory has built a unique position for itself in these domains and is considered
the preferred consultant by governments, multilateral agencies and private-sector clients. We have extended our operations beyond
India and are present in other emerging markets in Africa, Middle East and South Asia.
CRISIL Limited
CRISIL House, Central Avenue, Hiranandani Business Park, Powai, Mumbai – 400076. India
Phone: + 91 22 3342 3000 Fax: + 91 22 3342 3001
Email: dummytext@crisil.com (optional)
www.crisil.com