Project: CP02-H-Complete Miscellaneous items of works for the District Cooling network in Fox Hills PROJECT NO 9435
Company : OMEGA ENGINERERING W.L.L Applicable to use: Date: 27 JULY 2020
01. ❖ Unsafe Job location. ❖ Ensure HSE induction/walkthrough/ talk through, to identify any unsafe
Preparation. ❖ Unsafe/ Restricted ❖ Workers. conditions and layout of the cable installation area, so as to plan
means of access ❖ Foremen/ accordingly.
a. Site. and egress to work Supervisors. ❖ In case of Unsafe/ Restricted work access routes, ensure accesses are
location. ❖ Engineers. created/made safe as far as reasonably practicable and plan
❖ Presents of Other ❖ Inspectors. accordingly.
activities from other ❖ Any person in the ❖ Ensure proper job coordination with other work groups who might
work Groups vicinity. be/cause harm.
❖ Inadequate 4 3 7 ❖ Ensure appropriate level of lux & ventilation are planned and provided. 1 3 3
Illumination/ ❖ Decide suitable temporary storage area as per material size& shape to
Ventilation. ensure free accesses.
❖ Poor Housekeeping. ❖ Ensure installation location are at an acceptable standard of
❖ Presences of housekeeping.
Unprotected ❖ Ensure all falling Hazards, protruding Rebars /sharp objects are protected
edges/open holes, and floor surfaces treated, to eliminate tripping, slipping hazards.
Protruding Rebar/ ❖ Ensure all health unfriendly environmental factor are under control
sharp objects, including dusts.
Uneven/ Smooth or
Contaminated floor.
❖ Inappropriate
storage
❖ Pollution
❖ Use of Unsuitable ❖ Ensure provision of suitable, reliable and inspected
b. and Uninspected ❖ All other people in tools/equipment/instruments, including 3rd party, periodic &pre-use
Tools/Equip Tools/ Equipment the vicinity. 4 4 8 inspections (3rd party& calibration certificates) as per main contractors’
1 4 4
ment/Instru and instruments. procedure.
ments. ❖ Noise and vibration. ❖ Potentials for high noise/vibration during equipment use shall be
identified and provided for..
1|Page
GENERAL & SPECIFIC RISK ASSESSMENT
Project: CP02-H-Complete Miscellaneous items of works for the District Cooling network in Fox Hills PROJECT NO 9435
Company : OMEGA ENGINERERING W.L.L Applicable to use: Date: 27 JULY 2020
❖ Incompetent ❖ Any person in the ❖ Develop & implement behavioral changing programs such as awareness
c. Personnel workers. vicinity. campaigns, award/incentive scheme and disciplinary actions.
❖ Poorly cultured ❖ Ensure all workers are provided necessary trainings (induction and Job
1 3 3
workforce. 5 3 8 specific trainings such as working at height, confine space entry, use of
❖ Lack of specific power tools, etc.) and ensure availability of all required certifications.
required training/ ❖ Provide & ensure use of required PPEs and watch out for negative
induction Training behaviour during personnel selection.
for new workers.
❖ Unavailability of
PPEs.
❖ Presences of unsafe
personality traits.
❖ Manual handling. ❖ Workers ❖ Follow QD-SBG procedure for material, equipment/instrument and
❖ Lack of/ ❖ Pedestrians personnel mobilization to the site.
02. Mobilization/ inappropriate ❖ Supervisors/forem ❖ Ensure all tools and equipment should be in good condition and
Demobilizati proximity of welfare en. inspected by responsible QD-SBG authorized dept. prior to commence
on of facilities such as ❖ Inspectors. mobilization.
materials, drinking water. ❖ Client ❖ Ensure TPC for operative if required.
workers and ❖ Provision of representatives. ❖ Traffic management shall be under control such as proper barricade, use
Equipment’s uncalibrated/ of flagmen, warning lights and warning sign and obeying site traffic rules 1 4 4
incorrectly calibrated 5 4 9 such as speed limit, no using of ear phone while driving and use of seat
instruments leading belts.
to use of incorrect ❖ Ensure only calibrated/inspected instruments/tools are mobilized and
instrument. certificates kept within reach.
❖ Mobilization of ❖ Ensure required welfare facilities such as drinking water thermos and
workers without lunch container are provided to the workers before proceeding for
inducted. induction training.
2|Page
GENERAL & SPECIFIC RISK ASSESSMENT
Project: CP02-H-Complete Miscellaneous items of works for the District Cooling network in Fox Hills PROJECT NO 9435
Company : OMEGA ENGINERERING W.L.L Applicable to use: Date: 27 JULY 2020
❖ Obstructing the ❖ Ensure only inducted workers are allowed to the site.
access with ❖ Ensure Tools/equipment are mobilized into the site not causing access
mobilized obstructions.
instruments, ❖ Ensure that the weight of instruments & equipment are appropriately for
equipment, and/or worker to handle, otherwise apply team lifting and shifting.
materials. ❖ Ensure the manufacturers instruction on instrument and equipment
❖ Slip, Trip and fall at handling and usage, are understood and followed.
same level. ❖ Ensure tools are provided with tool boxes.
❖ Ensure the availability of emergency respond equipment are mobilizes in
the work area including the availability of a first aider.
❖ Ensure each worker has been provided required PPEs including water
thermos bottle.
❖ Ensure that heavy material manual lifting and transfer are carried out
under appropriate level of supervision by a competent supervisor.
❖ Ensure all mobilized materials are stacked properly in a safe manner not
more than 1.5m height but otherwise, ensure the materials are suitably
secured.
❖ Provide correct manual handling techniques training.
03. Survey ❖ a. Wild life such as ❖ Surveying team ❖ Ensure medical emergency contact no and first aid kit available on site
work venomous snakes, and all workers ❖ Clear all vegetation shrubs away from the working area
rodents, dogs etc... ❖ Stay away from rodents, snakes and dogs etc.…
❖ Do not feed dogs or cat.
3 5 8 ❖ If any case reports do not allow patient get panic or sleep and wash 1 5 5
bitted area with soap water and immediately seek adequate medical
attention which is nearest place.
❖ Ensure appropriate PPEs such as gumboots and other mandatory PPEs.
3|Page
GENERAL & SPECIFIC RISK ASSESSMENT
Project: CP02-H-Complete Miscellaneous items of works for the District Cooling network in Fox Hills PROJECT NO 9435
Company : OMEGA ENGINERERING W.L.L Applicable to use: Date: 27 JULY 2020
❖ b. sliding or falling of ❖ Surveying team ❖ Ensure fall arrest system and 100 % tied off in a firm place while
workers due to the and all workers surveying in surround of leading edge area
steep area ❖ Avoid surveying work near by the leading edge of excavation pit.
❖ Keep 2 mtr clearance from leading edge.
❖ Ensure concrete barricade and proper hand rail for all excavated area
4 5 9 with appropriate warning sign and warning lights. 1 5 5
❖ Do not allow unauthorized entry to work area
04. Work during ❖ All workers ❖ Significance and consequence of extreme temperature/ weather shall be
Extreme ❖ Exposure to high ❖ The Foremen/ a topic in every toolbox talk & pre-start briefing.
Weather temperature which Supervisors/ ❖ Monitor and follow the humidity index.
Conditions. could lead to: others staffs and ❖ Advise employees to take more fluid.
❖ Dehydration people in open ❖ Take rest at regular intervals as recommended by the humidex chat.
a. Working ❖ Heat stress, places. ❖ Provide enough ventilation or air conditioned and appropriate cool
in high ❖ Heat stroke, resting places.
temperature, ❖ Physical exertion, ❖ Ensure that the significance of the temperature-humidity monitoring flags
climate. ❖ Fatigue and is implemented.
❖ loss of control ❖ Wear appropriate clothing.
4|Page
GENERAL & SPECIFIC RISK ASSESSMENT
Project: CP02-H-Complete Miscellaneous items of works for the District Cooling network in Fox Hills PROJECT NO 9435
Company : OMEGA ENGINERERING W.L.L Applicable to use: Date: 27 JULY 2020
❖ Use proper PPEs to protect oneself from radiant heat (light colored
5 4 9 coveralls.) 1 4 4
❖ Provide cold drinking water at the place of work with the workers
provided personal thermos water bottle
❖ Proper supervisory control.
❖ Confined space entry shall be avoided unless confined space
temperature and other hazardous parameters are under maximum
control.
❖ Ensure workers are provided with electrolyte.
❖ Disallow working between 11.30am -3.00pm as per Qatar regulation.
b. Working ❖ Over exposure to ❖ All workers ❖ Ensure proper awareness to the workers on proper dressing (insulating
during unhealthy cold weather ❖ Foremen/supervis dresses) to be protected during cold weather.
extreme leading to, nonfreezing ors. ❖ Ensure appropriate rest breaks in a warm rest area
(chilblain, emersion
cold. All employee 4 4 8 ❖ Provide heating facilities for food and hot drink purposes. 1 4 4
foot and trench foot)
freezing (frosting, ❖ ❖ Ensure regular weather monitoring to identify quickly when it is not safe
frostbite) and to work and take the necessary action of stopping the work.
hypothermia injuries. ❖ Provide heat loss resistant container for workers food.
❖ Inability to hold objects ❖ Provide appropriate level of supervision.
firmly which could lead ❖ Make available in the site emergency arrangement.
to losing hold of held ❖ Obtain PTW prior to start activity & TBT training to operatives
materials, sometimes ❖
at height from height.
c. ❖ Poor visibility, eye ❖ All workers ❖ Immediately stope activity if there observed heavy wind condition.
Working injury, property ❖ Foremen/supervis ❖ .Ensure all materials stacked as per wind weather consideration.
during damage, vehicle ors. ❖ Ensure follow up and updating of wind condition to all project crew.
extreme collision with ❖ All employee in ❖ Do not operate any vehicle or equipment in extreme wind condition and
wind. people/vehicle, vicinity park that in safe place.
crane collapse, ❖ When reaching wind 25 mph/46.3kmp or early (Depend on task naturel)
workers fall from stope all lifting activity.
5|Page
GENERAL & SPECIFIC RISK ASSESSMENT
Project: CP02-H-Complete Miscellaneous items of works for the District Cooling network in Fox Hills PROJECT NO 9435
Company : OMEGA ENGINERERING W.L.L Applicable to use: Date: 27 JULY 2020
high, scaffold ❖ Do not stand or sit stacked materials, equipment, work at height area if
collapse. wind is high seek adequate rest area.
❖ ❖ Use or wear appropriate goggles in dusty wind condition.
❖ Do not allow workers performing task in leading edge, roof area near
4 5 9 confined space when wind is extreme condition. 1 5 5
❖ Plan all task as per wind condition.
❖ Do not allow people working in excavation trench.
❖ Provide more warning lights for vehicle moment and reflective warning
sign board.
❖ Ensure operative health condition when choosing manpower for task.
❖ Job rotation, shielding
❖ Plan task when good weather coming on the part of day by
monitoring analyzing local authorized weather updating.
05. Working at a. Unauthorized entry to ❖ New workers ❖ Do not allow any body for entering to site without proper HSE induction.
Night work site. ❖ Visitors ❖ Do not allow any kind of vehicle or equipment without security check and
❖ Inspectors inspection and ensure inspection sticker placed prior to entering to site.
❖ Vehicle/equipment ❖ Assign adequate security officer or standby person for preventing
. unauthorized entry to site. 1 4 4
4 4 8 ❖ Any inspection/visiting the lead person should be there who is site familiar.
❖ Implement appropriate reflective type warning and direction sign board.
❖ Provide and maintained proper pedestrian way with sufficient direction sign
board.
❖ Ensure all personnel use or wearing required PPE
6|Page
GENERAL & SPECIFIC RISK ASSESSMENT
Project: CP02-H-Complete Miscellaneous items of works for the District Cooling network in Fox Hills PROJECT NO 9435
Company : OMEGA ENGINERERING W.L.L Applicable to use: Date: 27 JULY 2020
b. Poo/Lack of ❖ Any person in the Obtain PTW for the particular activity.
illumination vicinity. ❖ Ensure TBT or pre-start task briefing and that the crew properly signed on
❖ Night shift the start card are completed before start.
Foremen & ❖ Provide sufficient lights on the working areas.
Supervisors. ❖ Use warning Lights to warn against hazards.
❖ -Night shift ❖ Work should be carried out under proper supervision.
inspectors. ❖ Ensure pre-start briefing is provided to workers by their superiors before work
starting,
❖ Night visitors.
❖ Portable task lighting shall be provided. If work progresses into the
5 4 9 1 5 5
evening
❖ Operatives shall ensure that the task lighting is pointed away from
sensitive receptors.
❖ Ensure that there is a supply of spare bulbs.
❖ Each gang shall have a torch with batteries in case of light failure.
❖ Ensure appropriate PPEs are provided including clear glasse.
c. Lone working ❖ All night shift ❖ Ensure workers are inducted prior to commencing the task.
operative. workers including ❖ Ensure there are no lone working by any of the workers, put workers in work
equipment groups.
operators ❖ Work should be carried out under proper supervision.
❖ Engineers/supervi ❖ Ensure pre-start briefing is provided to workers by their superiors before work 1 5 5
sor 4 5 9 starting,
❖ Proper planned method of work.
❖ Provide enough drinking water in the work area.
❖ Ensure appropriate PPEs are provided including clear glasses
d. Moving equipment. ❖ Night visitors. ❖ Ensure TBT or pre-start task briefing and that the crew properly signed on
❖ All night shift the start card are completed before start.
workers including ❖ Ensure proper segregation of traffic routes from pedestrian routes. 1 5 5
4 5 9 ❖ Provide additional directional signage especially along traffic routes.
equipment
operators
7|Page
GENERAL & SPECIFIC RISK ASSESSMENT
Project: CP02-H-Complete Miscellaneous items of works for the District Cooling network in Fox Hills PROJECT NO 9435
Company : OMEGA ENGINERERING W.L.L Applicable to use: Date: 27 JULY 2020
❖ Engineers/supervi ❖ Ensure provision of Barricades and high visible signage where applicable
sor especially around excavations and open floors.
❖ Ensure appropriate PPEs are provided including clear glasses
❖
e. Slippery surface & ❖ Night visitors. ❖ Ensure proper segregation of traffic routes from pedestrian routes.
uneven surface. ❖ All night shift ❖ Provide hard barricading for excavated area with proper reflective type
workers including warning sign board.
equipment ❖ Ensure all operative using adequate and damage free safety shoe for task
4 5 9
❖ In wet condition do no perform task if it is not necessary.
1 5 5
operators
❖ Engineers/supervi ❖ Ensure access and egress are properly erected and maintained.
sor ❖ Ensure appropriate PPEs are provided including clear glasses
❖
f. Exceeding consented ❖ Use or wear appropriate ear protection PPE to reduce the noise.
noise requirements. ❖ Night visitors
❖ Noise level should not be more than 55 db during day & 45 db during night
Sprains. Crushing ❖ Residents. activities in residential area.
injuries. Trips and falls. ❖ All night shift
workers including ❖ Keep rotating workers who are involved in the activity near to the source of
equipment noise.
operators ❖ Safety signs shall be provided near to the source of noise.
❖ Engineers/supervi
4 4 8 ❖ Use petrol based equipments instead of diesel type. 1 4 4
sor ❖ Ensure equipments are inspected with valid tag & silencer in good condition
and ensure daily check list properly maintaining for equipments.
❖ Ensure first aid person available in site with first aid kit.
❖ Ensure materials are stacked in a safe manner (max: 1.5 meters high),
without obstructing accesses or emergency exit routes.
❖ Ensure proper segregation of traffic routes from pedestrian routes.
❖ Allow and ensure only trained persons involved. Workers must be informed
about the hazards related to noise.
8|Page
GENERAL & SPECIFIC RISK ASSESSMENT
Project: CP02-H-Complete Miscellaneous items of works for the District Cooling network in Fox Hills PROJECT NO 9435
Company : OMEGA ENGINERERING W.L.L Applicable to use: Date: 27 JULY 2020
g. Inadequate ❖ Night visitors. ❖ Ensure proper communication between the team and supervisor always.
supervision. ❖ All night shift ❖ Regular monitoring ensure by adequate supervision
workers including ❖ Management should be monitor the supervisor performance and keep
equipment 4 4 8 communication and instruction for them. 1 4 4
operators ❖ Provide motivation training by managerial level.
❖ Ensure appropriate PPEs are provided including clear glasses
❖
h. Fatigue ❖ Night visitors. ❖ Provide adequate relevant training for workers for fatigue reduction and
❖ All night shift managing situation when occurred.
workers including ❖ Ensure machines helps whenever possible instead of manual handling.
equipment ❖ Provide enough drinking water in the work area.
operators ❖ Ensure effective fatigue management by considering appropriate work hours
❖ Engineers/supervi and allowing adequate rest.
sor ❖ Ensure workers health condition whenever choose the manpower for task.
4 4 8
❖ No worker shall be allowed to work at night and in the morning. If such need
1 4 4
arises, the worker shall be allowed a bed rests of not less than 7
hours before he can join the second shift required
❖ Ensure appropriate PPEs are provided including clear glasses.
06. Excavation ❖ a. Person/load/ ❖ Any ❖ Ensure all operatives and drivers are competent and conducted HSE
and back vehicle falling into person/equipment induction.
filing work. the excavation. in the vicinity. ❖ Ensure concrete barricade and proper hand rail for all excavated area
with appropriate warning sign and warning lights.
4 5 9 ❖ Keep 2 mtr clearance minimum from leading edge.
1 5 5
❖ Ensure all emergency procedure available on site including first aid kit.
9|Page
GENERAL & SPECIFIC RISK ASSESSMENT
Project: CP02-H-Complete Miscellaneous items of works for the District Cooling network in Fox Hills PROJECT NO 9435
Company : OMEGA ENGINERERING W.L.L Applicable to use: Date: 27 JULY 2020
❖ b. Collapse of ❖ Any person in the ❖ Ensure excavated materials kept in safe distance form and remove ASAP.
excavation. vicinity. ❖ Do not allow unauthorized entry to work area.
❖ Ensure shoring, benching, water spray and other required prevention for
excavation collapse.
❖ Keep surcharge loads at least 2 feet (0.6 meters) from trench edges.
❖ Do not allow unnecessary operation of vehicle or equipment near by the
4 5 9
excavated area.
1 5 5
❖ Inspect trenches at the start of each shift and following a rainstorm.
❖ Provide access and egress within 15 mtr gap and if excavation depth 1.5
mtr provide access and egress within 25 mtr gap.
❖ c. Underground ❖ Any person in the ❖ Ensure SCADA drawing for proposed excavation area and ensure obtain
utilities. vicinity. excavation permission from related authority.
❖ Identify underground utilities by the use of suitable detector
4 4 8 ❖ Ensure LOTO PTWs for the proposed excavation area if any live utilities. 1 4 4
❖ Ensure workers are aware about task and emergency procedure.
❖ Do not use machine if any underground utilities and if possible make
manual excavation for that area.
❖ d. Heavy ❖ Any person in the ❖ Do not allow equipment or vehicle moments without flagman instructions.
equipment’s and vicinity. ❖ Ensure proper pedestrian way with direction sign board
vehicle movement ❖ Do not allow vehicle to breach site speed limit.
❖ Ensure HSE induction for all operators and drivers.
4 5 9
❖ Ensure vehicles are in good condition and maintaining records
1 5 5
❖ Ensure adequate traffic management for vehicle movement and do not
allow speed driving.. .
❖ e. Presence of toxic ❖ Any person in the ❖ Test for low oxygen, hazardous fumes and toxic gases by a competent
gases or oxygen vicinity. 3 4 7 person. 1 4 4
10 | P a g e
GENERAL & SPECIFIC RISK ASSESSMENT
Project: CP02-H-Complete Miscellaneous items of works for the District Cooling network in Fox Hills PROJECT NO 9435
Company : OMEGA ENGINERERING W.L.L Applicable to use: Date: 27 JULY 2020
❖ f. Dust, noise, ❖ Any person in the ❖ Ensure provision of water spray for suppressing dust while excavating,
vibration. vicinity. loading, when unloading excavated materials or back filling materials.
❖ Avoid standing work area whenever possible
4 4 8 ❖ Close monitoring shall be provide for manpower by HSEO/Supervisor. 1 4 4
Ensure appropriate PPEs while working (ear plug)
❖ Ensure job rotation and vibration resistance PPEs (gloves)
❖ g. Suspended load. ❖ Any person in the ❖ Ensure people are not sitting or standing under the suspended load.
vicinity. ❖ Ensure close monitoring by supervisor/HSEO/banksman.
3 5 8 ❖ Wear or use appropriate PPEs. 1 5 5
❖ h. Electrocution ❖ Any person in the ❖ Identify live line by detector and apply LOTO PTW.
vicinity. ❖ Allow only trained personnel with proper supervision
❖ Use electricity resistance gloves and make sure ELCB/RCCB/MCCB are
in working condition prior to task.
3 5 8 ❖ Do not touch any cable with bare hand 1 5 5
❖ Avoid work in wet condition.
07.
❖ Frames and covers to be lifted using mechanical aids or lifting keys.
❖ Obtain appropriate PTWs for task.
11 | P a g e
GENERAL & SPECIFIC RISK ASSESSMENT
Project: CP02-H-Complete Miscellaneous items of works for the District Cooling network in Fox Hills PROJECT NO 9435
Company : OMEGA ENGINERERING W.L.L Applicable to use: Date: 27 JULY 2020
12 | P a g e
GENERAL & SPECIFIC RISK ASSESSMENT
Project: CP02-H-Complete Miscellaneous items of works for the District Cooling network in Fox Hills PROJECT NO 9435
Company : OMEGA ENGINERERING W.L.L Applicable to use: Date: 27 JULY 2020
❖ Environment and ❖ Tanker trucks carrying oils, fuels or sewage will have the following basic
09. Environmen ❖ Contamination of all employees emergency equipment:
tal Spillage water resources. ❖ Mobile phone for summoning aid.
❖ Contamination of ❖ Ensure appropriate fire extinguisher placed. 1 4 4
land / drainage; 4 4 8 ❖ To avoid any environmental mishap, and comply the Safe disposable of
❖ Slipping hazards on Contaminated water as per Lusail Approved Procedure OCEMP/MOE.
roads ❖ Ensure full time site safety supervisor/officer, Area Cordon off with
❖ Viral infection Safety warning signs.
❖ Chemical reaction ❖ Ensure waste water tank and proper connection without any leakage.
❖ Ensure periodically removing chemical waste water by as per local law.
❖ Ensure appropriate fire prevention plan and arrangements incorporate
with Emergency response plan.
❖ PPE including rubber boots, WP trousers, chemical resistant gloves
visibility clothing and eye protection goggles.
❖ Bag of oil absorbent granules
❖ Spill cover for drains
❖ Suitable shovel and liquid scraper.
❖ Suitable hand wash gels and wipes
❖ In the event of a spill incident the truck driver will contact his Project
Manager who will arrange suitable emergency response.
❖ Ensure comply of local law when disposing chemicals.
❖ The driver will attempt to prevent the spill reaching the public drains or
waterways using the basic emergency equipment and any sand or soil to
hand. If the vehicle is a suction tanker the vacuum pump will be used to
lift the spill.
❖ Ensure appropriate MSDS and COSHH available for every product and
implemented that all site.
❖ Do not assign people who are not enough trained.
13 | P a g e
GENERAL & SPECIFIC RISK ASSESSMENT
Project: CP02-H-Complete Miscellaneous items of works for the District Cooling network in Fox Hills PROJECT NO 9435
Company : OMEGA ENGINERERING W.L.L Applicable to use: Date: 27 JULY 2020
14 | P a g e
GENERAL & SPECIFIC RISK ASSESSMENT
Project: CP02-H-Complete Miscellaneous items of works for the District Cooling network in Fox Hills PROJECT NO 9435
Company : OMEGA ENGINERERING W.L.L Applicable to use: Date: 27 JULY 2020
❖ Fire out break ❖ Ensure to remove all flammable and combustible material
11. Work ❖ Environmental ❖ Provide proper/suitable fire extinguisher
completion pollution ❖ Whole project ❖ Follow to remove all disposal waste as per the local law
procedure ❖ Hygiene issue team 4 5 9 ❖ Ensure additional care and MST-RA if any asbestos type material and 1 5 5
/Housekeepi ❖ Slip and trip obtain competent third party advice.
ng. ❖ Provide proper segregation area for all chemical items avoid
to contact with natural resources.
❖ Make sure workers are fully briefed about the task and related RA
❖ Avoid to stack over materials
❖ Provide proper PPEs including dust mask and gloves
15 | P a g e
GENERAL & SPECIFIC RISK ASSESSMENT
Project: CP02-H-Complete Miscellaneous items of works for the District Cooling network in Fox Hills PROJECT NO 9435
Company : OMEGA ENGINERERING W.L.L Applicable to use: Date: 27 JULY 2020
1 2 3 4 5 6
2 3 4 5 6 7 10-9 EXTREME HIGH RISK
3 4 5 6 7 8 8-7 HIGH RISK
4 5 6 7 8 9 6-5 MEDIUM RIK
5 6 7 8 9 10 ≥4 LOW RISK
Additional comment/Information:
16 | P a g e