RTD Procedure Asme 2001
RTD Procedure Asme 2001
RTD Procedure Asme 2001
FOR
CALIBRATION OF DENSITOMETERS
PROCEDURE NO : HZW/QA/RT-02
REVISION STATUS
PROCEDURE REVIEWED IN
LINE WITH ASME CODE
01 26-12-2001 2001 EDITION, AND NO
CHANGES ARE REQUIRED.
PBJ PJS
PAGE : 2 OF 4
LARSEN & TOUBRO LIMITED PROCEDURE NO.: HZW/QA/RT-02
HAZIRA WORKS REV. NO. : R01
2.2 For our daily use a densitometer or a secondary density strip shall be used as
comparator in place of primary density strip.
2.3 The calibration of densitometer and checking of the secondary density strip shall be
as follows :
3.2 Select any position for reading the neutral density closest to 1.0, 2.0, 3.0 and 4.0 on
the primary density strip (minimum four points) which is traceable to national step
tablet and adjust the densitometer.
3.3 Check the density ranges of the density strip for ensuring the linearity of the
densitometer. The densities closest to 1.0, 2.0, 3.0 and 4.0 should not vary more
than + 0.05 density from the actual density stated on the primary density strip. If
any of this density vary more than + 0.05 density then, the linearity of the
instrument is out of tolerance and should be corrected prior to using the instrument
for measuring production of radiograph.
PAGE : 3 OF 4
LARSEN & TOUBRO LIMITED PROCEDURE NO.: HZW/QA/RT-02
HAZIRA WORKS REV. NO. : R01
5.2 If the verification readings are within + 0.05 of the values marked in the calibration
document, the equipment is ready for use. If not, re-calibration is required.
5.3 These calibration verification readings do not have to be recorded as the function is
to ensure the operator that, he/she is using the calibrated equipment.
5.4 If the calibrate verification shows a variation greater than + 0.05 density, then all
the radiographs examined since the last acceptable density check have to be
subjected to re-verification of density after the densitometer has been recalibrated.
PAGE : 4 OF 4