Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
AAB SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
WAB

The Skid structural shall be designed for transportation and lifting as per SAES-M-001
and 12-SAMSS-009.
ENGG CERT

CIB

Skid roof shall be provided with roof made from corrugated sandwich panel. The roof
NSA

shall be able to withstand wind loads without deformation.

All skid instruments and valves shall be reachable safely without use of any temporary
external ladder or mobile platform.

VENDOR shall provide anchor bolt number, location, material type, length, size and
location.
DESCRIPTION

ISSUED FOR CONSTRUCTION

VENDOR shall provide weight for foundation design i.e. skid wight (empty, operational,
test), seismic load, and wind load.

VENDOR shall provide grout type and thickness as per SAUDI ARAMCO Standards.

12.0 ELECTRICAL

Vendor shall include all Electrical works necessary to provide a complete, functional
19000-9284
JO/EWO
CER 11-

system in accordance with the Codes Standards and Specifications as detailed in Section
2.0 to the satisfaction of COMPANY Representative.
07/16/19
DATE

Vendor shall provide and install electrical equipment with all ancillary items and
interconnecting cables/wires, including but not limited to the following requirements:
NO.
REV

00

DISCIPLINE
ENGINEER
Vendor shall provide a complete electrical system and necessary accessories in
NSA compliance with 17-SAMSS-515 Auxiliary Electrical Systems for Skid-Mounted
07/16/19
04/14/13
DATE: Equipment.
PROJECT
ENGINEER
HMA The pump motors shall not be overloaded at the maximum discharge pressure and
04/14/13
DATE:
07/16/19 shall be rated for the site conditions.
CERTIFIED
CIB
04/14/13
Motors shall be as per 17-SAMSS-503, comply with NEMA or IEC Standards.
07/16/19
DATE:
CONSTRUCTION
AGENCY Motors shall be applied and sized based on their 1.0 service factor rating.
WAB

07/16/19
DATE: Motor acceleration performance based on actual loads and motor dynamic parameters
OPERATIONS are the responsibility of the Vendor of the package equipment.
ABB

07/16/19 480V AC, 3ph, 60Hz power supply shall be provided to Local Control Panel. Further
DATE:
wiring required within skid shall be in Vendor’s scope.
CONTROL NUMBER
VERIFICATION
EDSD

Any other power supply, if required shall be managed by the Vendor. Vendor shall
furnish the list of equipment that requires electric power along with its voltage and
DATE:
BY:

power rating requirements.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


A

Auxiliary Electrical system shall comply with 17-SAMSS-515.


00

11-19000-9284-001
(DCC) NO. _____________________

Motor starter panel shall be as per 16-SAMSS-512, as applicable.

TECHNICAL SPECIFICATIONS FOR CORROSION INHIBITOR INJECTION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

SKID TIE-IN HRML-824 WS WELL TO HRML PWI DOC


434 TE- 126923 22
GOSP A OF 00
HARMALIYAH SAUDI ARABIA JO / EWO:
11-19000-9284 31
EDSD/2616-0399.doc