Professional Documents
Culture Documents
Staircase Front Hall
Staircase Front Hall
SL
RUPEES
NO. ITEMS
1 Wooden Furniture (39Pi/ 19-20) 4,68,433.00
Dismantling Gypsum partition
2 7,072.00
wall
3 Ceiling 56,045.00
4 Floor polishing 600
5 Glass door 39,281.00
6 U- PVC Window 32,435.00
7 Putty/ Painting 10,757.00
8 New Gypsum Partition 5,000.00
9 A/C 1,65,000.00
10 Electrification/ Other 10,000.00
Total 7,94,623.00
Say 8,00,000.00