Unit IG2: Risk Assessment Part 1: Background: 00267373 Sarath Babu. R
Unit IG2: Risk Assessment Part 1: Background: 00267373 Sarath Babu. R
Part 1: Background
Include in here the organisation’s name* and location* and number of workers. You must then go on to give a description of the main
activities/products/services carried out. You must also describe the area to be risk assessed eg, whole site, and anything else that you
consider relevant (approximately 150 to 200 words):
The name of my organization is Beaver Gulf LLC based on Dubai near Jumeriah village having total employees up to 700 including operation
manager, site engineers, supervisors, foremen etc...
It is basically a construction site (high rise tower) having 40 floors and 3 basements. The work activities include loading unloading of raw materials
in store. Distribution of raw materials by crane and vehicles to work site. Manual handling of materials. Installation of Mep services. Confined space
works. Painting and final testing works. The company only does Mechanical Electrical and plumbing work only. They also does painting works.
Work activities is based on two shift patterns.ie (morning shift from 7 am to 6 pm and second shift from 7 pm to 6 am). 450 workers will work on day
shift and rest will work on night.
The risk assessment covers the entire work site from basements areas, store area and also Work areas in each floors and roof top etc. All
workers and the management has responsibilities in health and safety of themselves and others. The operations manager ultimate responsible for
the health and safety for all employees in the site.
You must now give a brief outline on how you completed the risk assessment (approximately 200 words):
To identify the hazards I have started my inspection from store to work site and collected information regarding their work activities. I went to the
first aider to collect information regarding accident / injury cases reported previously. There were many injuries reported and every 2 week there
was a minor injury reported. Most workers are not even wearing proper personal protective equipment’s like hard hat, hand gloves where ever
required. Though the company has provided they are not using.
I referred lot of legality and I have given priority to ILO C 155 and ILO C 167 (health and safety in construction) and also I referred from
Codes of construction practice by Dubai municipality. I did the inspection and I have found many violations.
* If you’re worried about confidentiality, you can invent a false name and location for your organisation but, all other information provided must be
factual.
Hazard Who might be harmed What are you already doing? What further controls/actions are Timescales for
category and and how? required? further actions Responsible
hazard to be person’s job
completed title
(within …)
Safe 1. Competent operators are 1 Pedestrian passage to be
movement of there. separated and clearly marked. 1 week
vehicles.
Workers who are working in 2. Speed limit signage 2 Competent operators & Banks 2 week
Collision with store area are likely to get posted. men should be provided.
pedestrians. collided with vehicles Store manager.
resulting in major accidents 3. Traffic routes clearly 3 One way entry/exit system to be 2 week Engineers.
and fatality. marked. implemented.
Lifting. 1. Area barricaded and 1 Permit to work required. Immediate Banks men.
informed to all workers.
Operators could be injured 2 Provide a direction for each crane Immediate Operator and
Hit by moving by toppling of cranes by 2. Overhead hazards boom movement while lifting and banks men.
objects. hitting with other moving checked. shifting.
objects and workers below
are also affected. 3. Wind conditions are 3 Competent operator and rigger to Immediate Engineers.
checked. be there.
Workers falling Workers going on top for 2. Proper access/ egress are 2 Provide proper scaffoldings with 1 week Supervisor.
from top working may fall down due provided. working platform on top with guard
resulting in to sloppy surface, fragile rails. Scaffolding
major surfaces resulting in major 3. Lone work is not allowed. inspector.
injury/fatality injury and fatality. 3 Scaffold to be erected, checked by 7 days
4. Full body harness are competent scaffolder only.
provided.
4 Check for overhead hazards. Daily
5. Trainings are provided.
Hazardous 1. Limited entry to workers 1 Make sure respiratory mask are 1 week Supervisor
substances Workers doing spray inside 1 room. provided.
painting inside the room are
Acute toxicity more prone to acute toxicity 2. Ventilation is there. 2 Supervision to be there. Daily
by paints and chemicals and
can lead to acute or chronic 3. Proper PPE’s are 3 Permit to work required. Daily
health hazards. provided.
4 Training to all workers. 3 weeks Training dept.
Fire 1. Permit to work is there. 1 Barricade the area with sign. Immediate
Workers doing hot works are
Activities such more harmed due to fire 2. Proper PPE’s are there. 2 Provide competent fire watchmen. Daily
as cutting, hazard resulting in deaths
grinding and and major loss of property. 3. Competent worker doing 3 Housekeeping the area before daily Supervisor.
welding and use the job. and after work to remove
of faulty. combustible materials.
Workers working in Testing 1. Permit to work is there. 2. Lock out and tag off the area. Immediate
Electrocution & commissioning units like Supervisor
Live DB testing are more 3. Lone work is not allowed.
2. Competent electrician to Daily
prone to electrocution and
can result in fatality. do work. 4. Permit should be given to
maximum 5 floors at a time. Daily
3. Proper PPE’s are used.
5. All the tools and machineries has 2 weeks Store dept.
to be insulated as per article 26 in
ILO C 167.
You must pick the three highest priority/most urgent actions and justify your choice. Your justification must include moral, legal and financial arguments
(500 to 700 words); consideration of likelihood and probable severity of injury, ill-health and/or harm (150 to 250 words); description of how effective each
action is likely to be in controlling the risk (250 to 350 words).
1. Installation of firefighting lines and smoke detectors inside the site to identify fire early and to fight the fire to prevent property and life loss. (Hazard
category –Fire).
2. Purchase of good quality shock proof hand gloves and proper insulated hand and power tools for live works to avoid electrocution. (Hazard category
– Electricity).
3. Purchase of mechanical lifting aid to prevent work related limb disorders. (Hazard category- manual lift).
The Beaver gulf has responsibilities towards health and safety of all employees in the company. The company should provide safer working
environment and safe equipment for all workers. The company should provide adequate welfare and first aid facilities too. These are considered
as moral duties of employer towards their employees.
LEGAL impacts:
Legally the company has to do appropriate system of inspection as per article 9 in ILO conventions 155 which States- Company has to enforce the
law concerning occupational safety & health and working environment has to be secured by adequate system of inspections.
Workers shall have the right to participate in ensuring safe work conditions to extend their control over equipment as stated in article 10 of ILO
convention 167.
The company has to take measures to provide guidance to all employees & workers so as to help them to comply with legal obligations as per
article 10 of ILO C 155.
Proper guards for machinery should be done to prevent machinery hazards also as stated in article 12 of ILO C 155.
All workers has to be informed and trained under the act of article 33 in ILO convention in 167 of construction safety.
Lifting appliance and gears to be checked once in 6 months by third parties as per LOLOER rule and article 15 of ILO C 167.
Proper ppe to be checked and provided to all workers free of cost as stated in article 30 of ILO C 167.
1. The likelihood of injuries arising from fire is very high. This is mainly due to daily hot work activities in many areas inside the site. The severity could
be very high also like major disasters, life loss and property loss.
2. By purchasing more quality shock proof gloves and insulated tools will require more cost but the likelihood of being get electrocuted will be high and
the severity will be major can lead to fatality.
3. Most of workforce could be injured by manual handling due to lifting of heavy loads. The likelihood of getting work related limb disorders are more
and severity depends upon the weight and size of loads.
1. Installation of firefighting lines and smoke detectors will identify the fire in early stage and can be easily extinguished. Timescale given is 1 month as the
cost has to be calculated and fund has to be raised.
2. Additional quality shock proof gloves and insulated tools will require some time for the fund to be approved by the manager so I have given a time scale
of 3 weeks.
3. Mechanical aid in market are having high cost so I have given time of 2 month for the budget to be approved and good supplier has to be found out. This
will help in minimizing work related injuries.
By implementing the control measures the company can run the work without any obstructions and can do the work with risk levels as
low as reasonably practicable levels. The control measures described in each risk has to be complied in work to avoid further accidents or
injuries. If something disastrous happens company will have to pay huge compensation and can lead to shut down of the project also.
You must now give a review date for your risk assessment and say why you have chosen this date (10 to 50 words).
Policy of the company is to review risk assessment in every 6 months. Hence I set the review date for 6 months’ time 03-July-2020.
Furthermore in other cases also review will be done in 3 months like if there is any change in risk assessment, If there is any change in law
also.
You must now indicate how the risk assessment findings will be communicated (including who needs to know the information) (100 to 150
words).
Management meeting will be arranged to discuss the risk assessment made after the inspection. The severity and likelihood along with legal
requirements will be presented to operations manager and finance manager so that they can rectify the issues by providing the fund required.
All the workers will be called in for a safety meeting to discuss all these risk found out and its control measures. Official mail will be send to all
management employees and further follow up will be done monthly.
You must now indicate how you will follow-up on the risk assessment to check that the actions have been carried out (100 to 150 words).
All the control measure will be checked as per the timescale and if actions not completed within the time frame then mail follow up will be
done. Apart from that monthly meetings will be done to remind every top management employees. All supervisors, foreman and workers will
be reminded weekly in toolbox talks. Actions that are not completed in 6 months will be referred to managing director for further action.