L&T CONSTRUCTION BILL OF QUANTITIES

WATER & EFFLUENT TREATMENT

JOB No. SHEET


PROJECT KUNDALIA IRRIGATION PROJECT - RIGHT BANK
LE180855 1 of 1
REV. No. DATE
Doc. No. LE180855-M-IW-WS-PR-2013
B 18.11.2020
DESIGN CHECKED APPROVED
PARTICULARS BOQ FOR VENTILATION FANS AND AIR CONDITIONING
SRJH SP GK
S.N. Description Unit Quantity Remarks

1.1 SPLIT A/C UNIT

PUMP HOUSE-1

1 Room Size (LxBxH) m 14 X 9.0 X 5.0

Temperature to be maintained 0
C 23 + 2
PLC Panel Room
Relative humidity to be maintained % 50 - 60

Required Capacity of AC Ton 2.0

Quantity Nos 4

2 Room Size (LxBxH) m 6 X 6.0 X 5.0

Temperature to be maintained 0
C 23 + 2
Pump house Office Room
Relative humidity to be maintained % 50 - 60

Required Capacity of AC Ton 2.0

Quantity Nos 1

Dimensions
S.N Description (m) CMH Rating (KW) Quantity (Nos.) Remark
LXBXH

1.2 Exaust Fans


PUMP HOUSE-1

1 Store Room 7.5 X 4.1 X 6 4180 0.37 1 -

1.3 Exaust Fans (Propeller Type)


PUMP HOUSE-1

1 Pump House Toilet 2.05 X 2 X 4.0 500 0.18 2


-
2 Office Room Toilet 3 X 2 X 4.5 500 0.18 2

1.4 Axial Roof Blower


PUMP HOUSE-1

1 Pumping Station 92 X 17 X 17.0 32500 3.75 19 -

1.5 Axial Flow Supply Fans

PUMP HOUSE-1

1 Electric Switch Gear Room 43.5 X 9.3 X 4.5 18450 1.5 2 -

2 Workshop Room 35 X 15 X 8 17200 1.5 4 -


Notes:

1. Vendor to decide Type of Fans(exhaust or supply) , Number of fans, capacity & Quantity of fans required based on inputs given

2. Vendor to design HVAC(Axial flow fans) based on equipment Heat Load & provide the offer. Also Vendor to seperately design HVAC(Axial flow fans) based on heat changes per hour.
Calculation for both shall be submitted.

3.Vendor to consider temperature rise of 5 oC for calculation of heat loads.

4. vendor to select necessary AC capacity for sepcified rooms and provide the suppoting calculations for it considering standard lighting load, human load etc

5. Vendor to consider standard lighting loads for AC & Fans

6. Vendor to consider static pressure of 10 mm for calculation & designing of fans , except for switch gear room where static pressure shall be 15mm.

7. Vendor to submit GA Drawings, description, datasheet & supporting calculations for selected quantities

8. Vendor shall refer the tentaive layout drawing attached

9) Vendor shall seperately list the Additions or Exclusions / Deviations from the above specifications.