JUBAIL UNITED PETROCHEMICAL COMPANY (UNITED)

JOB SAFETY ANALYSIS – WORKSHEET (Attachment V)

JOB DESCRIPTION: DATE: May 28, 2018 JSA number: RD/HSEM/JSA-UN-03

Use of step ladders & Scaffolding for Work at height NEW REVISED

(Work at Height)

JOB LOCATION (Plant): AREA: HEXENE LOADING

No BASIC STEP POTENTIAL HAZARDS MITIGATION PLAN RESPONSIBILITY

1 Preliminary steps for the job 1.1 No valid permit to work 1.1.1 Permit shall be obtained prior to commence the
UNITED
task.
&
1.1.2 JSA shall be available on site prior to start the
REDA
work.
1.2 Miscommunication 1.2.1 Task shall be clearly communicated among
REDA
whole site team prior to start any activity.
1.3 Personal Injury due to 1.3.1 Tool box shall be carried out prior to start job.
lack of safety awareness 1.3.2 Inform to workers about the nearest location of
REDA
training Safe Assembly Point, Manual call point & Safety
shower in daily toolbox talk.
1.4 Obstructions 1.4.1 Area must be clear from any type of
REDA
obstruction.
1.5 Inclement weather 1.5.1 Stop work when poor visibility is observed due
to bad weather like rain, sand storm, fog & in REDA
extreme hot weather.
1.6 Poor Supervision 1.6.1 Construction department will assign competent
& trained supervisor to supervise each activity to REDA
ensure all procedures are carried out correctly.
1.7 Lack of PPE 1.7.1 Wear proper PPE prior to start the job. REDA

Page 1 of 4
2 Use of step ladder for light 2.1 Uninspected, poor, 2.1.1 Ensure that ladder is inspected, good condition
activities damage step ladder & all components are in place.
2.1.2 Ensure the stiles are not bent or damaged.
2.1.3 Ensure that rungs should not be bent, missing,
loose. REDA
2.1.4 Ensure the locking bars are engaged.
2.1.5 Do not use aluminum step ladder for inside sub-
stations or high voltages rooms & for live
electrical work.
2.2 Persons may fall from 2.2.1 Ladder must be placed on firm level ground, and
ladder ensure that ladder legs are fully extended.
2.2.2 Maintain three point contact system.
2.2.3 One person is allowed in one time.
2.2.4 Do not use top two rungs.
2.2.5 Always grip the ladder and face the ladder rungs
while climbing or descending—don’t slide down
the stiles.
2.2.6 Avoid holding tools or other object while
climbing. REDA
2.2.7 Avoid over-reaching.
2.2.8 Ladder feet should be fitted with rubber for
strong grip with ground.
2.2.9 One person should hold the ladder while
working on ladder.
2.2.10 Do not lean ladder with wall or any other object.
2.2.11 Do not place ladder on any object.
2.2.12 Persons must be trained in order to work on
step ladder.
3 Use of scaffolding for work at 3.1 Uninspected, poor 3.1.1 Scaffold must be inspected by authorized REDA
height erected, missing Scaffold Supervisor/Inspector.
components scaffold 3.1.2 Always check inspection tag before use of
scaffold, ensure that inspection is valid.
3.1.3 Ensure that all components are in placed & well

Page 2 of 4
tight.
3.2 Persons may fall while 3.1.1 Maintain three point contact system while using
work at height cause ladder.
serious injury or death 3.1.2 Wear inspected, color coded & good conditioned
full body harness.
3.1.3 Full body harness’s snap hooks must be tied with
anchor point all the times.
3.1.4 Do not climb on toe board & guard rails.
3.1.5 Stay only within platform. Do not climb on
structure or any other object. REDA
3.1.6 Ensuring that information, instruction, training
and supervision of all personnel is provided to
enable them to safely perform their work at
height.
3.1.7 Scaffold platform must be clear from
obstruction, do not keep unnecessary
tools/material on platform & all tools/material
must be well arranged in a side.
3.3 Improper method of 3.3.1 Use canvas basket & nylon rope for transfer
getting material tools & light material.
3.3.2 Use pulley system. REDA
3.3.3 Do not throw any tools/material from ground to
height and from height to ground.
3.4 Personnel injury 3.4.1 Use all mandatory PPEs all the time along with
full body harness. REDA
3.4.2 Peoples must use chip strap while work at
height.
3.5 Scaffold may collapse 3.5.1 Scaffold must be erected on firm level ground.
3.5.2 Before every use, ensure that scaffold is in stable
condition & all components are in place. REDA
3.5.3 Scaffold must be re-inspect after hit by any
moving equipment, alteration, or heavy winds.
3.6 Unauthorized 3.6.1 Erection, dismantling & modification is only REDA

Page 3 of 4
modification or removal allowed to certified scaffolders under the
of scaffold component supervision of certified supervisor.
3.6.2 Unauthorized persons are strictly not allowed to
modify any component of scaffold.
4 Do housekeeping after completion 4.1 Injuries from sharp
of job or before leaving the site objects while 4.1.1 Ensure correct cut resistant gloves are used
REDA
housekeeping while housekeeping.

4.2 Exposure to dust hazard 4.2.1 Proper dust mask to be used. REDA

Prepared by: JSA Team Leader Acknowledged by: Manager/Shift Supervisor

Name: Muhammad Umar Signature:________ Badge #:__________ Name:______________ Signature:__________ Badge#: __________
JSA Team Members Reviewed and acknowledged by Operation Sr. Manager In case of Major / Significant Risk (Critical
Activity).
Name ID # Department Signature Date
Name:______________ Signature:__________ Badge#: __________

Comment: …………………………………………………………………………………………………

Approved by Maintenance Manager / Supervisor


…………………………………………………………………………………………………………………..
…………………………………………………………………………………………………………………..
Name:_____________________ Signature:__________ Badge #:________
…………………………………………………………………………………………………………………..

Approved by Maintenance Sr. Manager in case of Major / Significant Risk (Critical


…………………………………………………………………………………………………………………..
Activity).

Name:_____________________ Signature:__________ Badge #:________

Page 4 of 4