TUTORIAL 3 - BIOMASS
EET 431 ELECTRICAL ENERGY
SYSTEM
+
QUESTION 1

A small scale biogas power plant is being


planned for rural village in Sabah. It is
planned to use cowdung from a cow farm to
generate biogas to power a gas engine
coupled to a single phase generator.
Draw the block diagram of this energy
conversion system, labeling all the blocks
and clearly marking the direction of energy
flow.
+
Answer

Single phase
generator

Diesel engine
+
QUESTION 2

If a bag of 0.3 m3 logs is RM50,


calculate the cost of the energy per
kWh. Assume that energy content of
logs is 10 GJ/m3 and 1 kWh = 3.6 MJ.
+
Answer

Cost of energy = RM50 / 8.33 kWh = RM 0.06/kWh


+
QUESTION 3

A Waste to Energy plant can incinerate


350,000 tonnes/annum at an overall
efficiency of 27%. The energy content of
Municipal Solid Waste (MSW) is 10 MJ/kg.
n Calculate the net power output of the plant
per year.
n If
the power needed to run the plant is 4.5
MW, calculate the generation efficiency.
+
Answer

You might also like