Professional Documents
Culture Documents
Portfolio 2020
Portfolio 2020
AT A GLANCE
BREAKDOWN OF MANAGED TURNOVER IN 2018
63%
of our business
22%
TURNOVER
8%
outside France
7%
20%
Mobility AMERICAS
2%
Energy & services AFRICA
Environment
67% OCEANIA
18% 25% Road
Roads operation
Buildings
8,750
engineering
6,100
operation
SHAREHOLDER BREAKDOWN
FCPE (EMPLOYEE
SHAREHOLDING FUND)
BUILDINGS
ENGINEERING
MAJOR STRUCTURES
CITIES
ARCHITECTURE,
URBAN PLANNING
TURNKEY
PROJECT STRUCTURING,
PPP INVESTMENT
OPERATION
ROADS
MOBILITY
ENVIRONMENT ENERGY
MOBILITY SERVICES
WATER
RAIL
Rail BU contribute to social harmony and play
a part in the dynamism of cities
2
and communities all over the world.
As passionate designers, we created
018 marks the 50 th
a structure in 2018 to codesign projects
anniversary of Egis’s with our clients, Rail Academy by Egis®,
experience in urban to share and challenge our expertise and
and railway transport, since our visions on the future development
the establishment of Semaly in 1968 by of our markets. The significance
the Lyon authorities for the construction of our mission is dependent on the use
of what has today become one of the best and very utility of the projects that we
urban transport networks in Europe. build every day with the men and women
who make up our teams.
Over the years, Egis has expanded its
know-how and skills and has constantly Egis boasts more than 300 projects,
fostered initiative and innovation with either commissioned or under
major milestones such as the high- construction around the world, such
capacity automatic metro (Maggaly) as the metros in Lyon, Doha, Grand Paris
in the 1990s, or, more recently, the Express, the Sud Europe Atlantique HSL
“New take on the tramway” (Le tramway in France and the Kenitra-Tangier HSL
autrement®) for medium-sized cities. in Morocco, and the light rail systems
Today, our group is a leading light of Nice, Birmingham and Montpellier.
in digital transformation solutions. While all of these are a source of pride
By 2020, BIM will be used on nearly 90% for us and fuel our ambition, our history
of our design activity across all sectors. is an ongoing story, written with the
In parallel, the company made a powerful mobility of the future.
entrance in the railway sphere at the
beginning of the 2000s, at a time when
the French market was opening up
to competition and HSL lines were
developing in France and abroad.
© Atelier Schall
Our Lyon client Sytral has Today, we are increasingly turning
reaffirmed its confidence our attention to operated railways Our ambition for the future?
in us with the award of three to help SNCF address the challenge Pursue our development
major projects: the programme internationally whilst continuing
of modernising and maintaining
management of the extension
of LRT line T2 to Monrochet its rail network. to cultivate our French roots.
and design studies for the new
metro line E and for the Oullins Centre station,
extension of LRT line T6 metro line B extension, Lyon
to the north of the city.
6 2018 A C T I V I T Y REP ORT 7
R AIL R AIL
© Rémi Soustre
France, Luxembourg. Through (North package) for the first HSL in Africa,
these projects, Egis commissioned in summer 2018. Our teams
demonstrates its ability had been waiting for this day for 10 years!
to design the light rail system
© Luxtram
of these two projects. of construction of first diaphragm
walls of line 16 structures
186 km 4
on the first diaphragm walls on line
16 of Grand Paris Express. This is
Extension of the Emirates rail network the iconic first stage in civil engineering
package 1 of an outstanding project set to
© Sergio Vieira
of line non-standard structures last nearly 6 years.
United Arab Emirates. The network, which
currently has more than 260 km of track
in operation, will be extended by a further
850 km between now and 2024. Egis is acting
as Consultant to the project owner Etihad Rail
in the management of this major project.
© Chesky_W - Thinkstock
© Egis
reference in the construction of urban
ROADS
Gildas Le Bever,
road infrastructure in France, was
Project Director, an incredible human adventure.
Cities, Roads and
Mobility BU
© SRL2_Laurent Carte
Société de la Rocade L2 and
of the construction consortium
GIE L2, Egis was a key player
in this exceptional project,
as EPC manager, BIM manager
and the turnkey integrator of
operating plant and equipment.
10 2018 A C T I V I T Y REP ORT 11
ROADS ROADS
© Egis India
Egis wins three road contracts in Brazil
© TheFinalMiracle - Fotolia.com
highway BR-364 on a 793 km section located between the State of France was inaugurated new motorway which, on
of Mato Grosso and the State of Rondônia. in summer 2018. Egis completion, will run from
conducted the full the region of Bundelkhand,
programme management in northern central India,
of operations (technical to New Delhi.
designs and supervision
of works) along the full
length of the road.
© IS2 - Fotolia.com
Mauritania. Egis is supervising
the reconstruction works
on 145 km of the national
highway RN2 between Rosso North Macedonia. This 28 km motorway project, whose
and Bombri, on the route construction was supervised by Egis, completes the
© Egis
between the capital and Pan-European Corridor X which crosses the country
Rosso near Senegal. from north to south.
The specificity of this project
is that the bitumen (asphalt
concrete and gravel) A coastal freeway project to reduce
is being manufactured A TRICKY BUT SUCCESSFUL The A10 motorway goes virtual
congestion in Mumbai
from crushed seashells, PROJECT
since no rock can be found
© Olivier Franchomme
at a reasonable distance France. Egis and Sanef opened a new France. The project to widen a section of the A10
India. To deal with the regularly gridlocked motorway north of Orleans to 2×4 lanes provided
from the construction site. road traffic in Mumbai, Egis is working motorway junction in Bailly-Romainvilliers,
Egis with its first opportunity of modelling a junction
on a collection of coastal motorways and east of Paris, in a highly restricted in virtual reality.
is renovating bridges, roads and tunnels geotechnical environment, without
in the western part of the city. closing the motorway to traffic.
© Egis
Alban Fourrier, Jocelyn Urvoy,
BUILDINGS
Egis Project Manager, Elioth Environment Consultant,
Buildings BU Buildings BU
T he development of a low
carbon projects such as
Bruneseau calls on an
all-round form of engineering. This
project in particular mobilised cutting-
The idea is to absorb the infrastructure
and tone down the urban density to create
a genuine town centre. The real estate
programme, aiming to achieve a social
and functional mix, presents buildings
edge expertise to address energy and that are designed as vertical villages
environmental issues. To successfully offering a blend of residences for the
market the 11 buildings including four elderly, for students, social housing
tower blocks which will symbolise or first-time buyer properties, retail
the new connection between Paris spaces, offices, etc. Another sizeable
and Ivry, the buildings must display challenge to be met was that of acoustics.
an exemplary carbon footprint. In terms Special attention was given to the
of construction, two thirds of structural soundproofing of facades and also to the
elements will be made from wood, quality of air through a bioclimatic system.
including floors. In order to get around Beyond the concentrate of innovations
the drawback of the flammability of the that the project displays, it above all shows
material, new constructive solutions a balance of uses. Furthermore, in the
were created. This project, an iconic last phase of the competition, our teams
example of the environmental ambitions recommended that this technology
of Paris City Hall, which aims to achieve be presented to the public. Exhibited
carbon neutrality by 2050, includes in the first eco-designed building, this
within its design an objective of 50% real-time energy generation demonstrator
of energy produced or recovered will aim to sensitise inhabitants and fully
on site, a carbon footprint divided by five embed the ecology transition at the heart
compared with the average in Paris of their way of life.
and a target of 65% of energy
requirements met by renewable energy.
“Inventing Bruneseau” We therefore proposed that the future
call for projects district be supplied with renewable
and recoverable energy, notably using
Egis and its entity Elioth are part heating and cooling generation networks
of the “Nouvel R” consortium
and the large-scale installation of solar
which won the call for urban
panels. Incorporating and managing
Bruneseau is a perfect illustration
projects “Inventer (inventing)
Bruneseau.” The development the infrastructure, in the immediate of the complementarity
© Architectes Kardham
Al Seef mixed district energy, wooden structured office block
An HEQ high school with in France.
nominated at the 2019
wooden structure and straw
et Luc Martz
MIPIM Awards
insulation in Aizenay
France. Egis will be tasked First IKEA real estate A maritime history museum made from
with technical project complex on the Riviera
management, structure, zinc, glass and wood in Saint-Malo
roads and utilities for
the reconstruction and France. Egis is the
refurbishment of the floor, France. Egis is in charge of the general
programme manager engineering of this museum with its ecological
with the hospital remaining for the construction
open, in a complex and spectacular architecture which will be part
© Jean-Michel Wilmotte
of a real estate complex, of the Smile programme on smart networks.
architectural and technical designed by Jean-Michel
environment. Wilmotte. The project
includes housing
© L'autre image
Architect: Groupe 6 and offices built around
an IKEA store.
© Cle'Millet International
the technical packages of highways and utilities, combined architectural partition, respecting the
drawings, fire safety coordination and BIM management. classical legacy of Nancy architect Louis Ethiopia. Built near to barley
Lanternier from the beginning of the 20th crops, the malthouse will
century. Egis is conducting the engineering be fitted with infrastructure
of the structure, roads and utilities works incorporating the latest
© Agence d'architecture Baumschlager Eberle
development of the
region. Egis is programme
manager for the whole
Bin Al Sheikh Hotel, a French project (factory and silo).
© Josh Alakkat
Mongi Djouba, Josh Alakkat,
Airport Director, Project Director,
AVIATION
Aviation BU India BU
© Autority of India
growth over the next 20 years.
Egis is providing advisory
services to this engineering
project from design stage
to commissioning.
18 2018 A C T I V I T Y REP ORT 19
AV I AT I O N AV I AT I O N
© Thinkstock
Design and construction of new Djeddah: successful debuts
Libreville airport for Saudia Airlines and Flyadeal
Gabon. Egis is leading the design Saudi Arabia. Egis is supporting the two
© ABV
© Song about summer
© KFotogaby
navigation service provider
Belgocontrol in its transformation
of its infrastructure, systems
and operational aspects.
© Ben Pirard
data and systems suppliers and the cybersecurity
Zambia. Egis developed the air traffic management
risks arising therefrom.
masterplan specifying the necessary improvements
and investments in air navigation up to 2030.
© Egis
CITIES
other Middle Eastern cities, Al Mutlaa aims
Isabelle Lopez, to be an exemplary sustainable model
Project Director for future cities in Kuwait.
and Head of Middle
East Unit
© LOUKA
But drawing up an urban design manual It is by recreating the connection between
in a desert environment requires people and their environment and
revisiting the city in its context: obtaining public buy-in that the city of the
on the one hand, defining the building future will be resilient. Its public spaces
construction and zoning regulation will be designed to build social ties.
standards, and on the other, adopting It will offer high quality spaces and
a bioclimatic approach to guarantee a varied range of local services, such
the technical and economic equilibrium as this mall designed like a city within
of a highly energy-intensive city. the city, with its high street lined with
Our analysis therefore centred on an streetlamps symbolising the new Kuwaiti
Design of future urban cooling network to reduce the community spirit.
Kuwaiti cities high electricity consumption of air
In view of its expanding conditioning systems.
population, Kuwait is now
investing in urban development
programmes whilst also taking
on board the environmental
challenges faced by the country.
© Sylvie Maillard
© Sylvie Maillard
© Sylvie Maillard
Egis is working on the city
of Al Mutlaa (a Smart City
opportunity, urban cooling
network and urban planning
principles).
22 2018 A C T I V I T Y REP ORT 23
CITIES CITIES
150,000
than the other bus lines in the city region. to conduct a land development study.
bushes planted
© Egis India
Egis was appointed Engineer for this
infrastructure project. on the 4-hectare
landscaped knoll
© Mairie Aulnay
city of Chandigarh.
© AJOA-Joyland
Feasibility study Saint-Brieuc opens its first
for Colmar southern bus rapid transit line
bypass
France. Egis managed the engineering,
France. Egis conducted procurement and construction of this
the feasibility studies east-west transit project. To integrate
for a town bypass to it more easily into the city fabric and gain
improve traffic conditions the approval of inhabitants, work was
© Christophe Ehanno
south of the town and carried out non-intrusively using our
© Urbalink
© Exfolio
© Ilex
24 2018 A C T I V I T Y REP ORT 25
© Aurélia Blanc
Our solutions involve not only the
decongestion of urban space through
Isabelle Bourguet, better vehicle rotation and organisation
Chief Strategy, Marketing of street parking, but also making users
and Communication Officer more responsible for their own behaviour
U
and practices. When we draw up mobility
MOBILITY
blueprints and master plans for our
rban concentration and the clients, we additionally promote the
ever-increasing development implementation of low emission zones
of communities entail and thus lower pollution levels in our
growing needs for mobility, at a time communities, with a genuine desire
when climate change is a challenge to “decarbonise” our city centres.
that we all face.
Nowadays, modern mobility has Over and beyond its primary function,
a duty not only to reflect the diversity today’s mobility has become
of expectations of city dwellers but also a cornerstone of urban planning
to take into consideration the issues policy, placing transport at the heart
of public health and greenhouse gas of a city life refocussed on the place
emission control. This is why mobility of the user. Smart cities require genuine
must necessarily be conceived within intermodality that organises and
the scope of the ecology and technology enables smooth connections between
transitions currently underway so that one transport mode and another
we can guarantee future generations according to needs and temporalities.
the quality of life that we owe them. This rationalises all our efforts over
In recent years we have expanded the years in developing multimodal
our range of skills in response to interchange hubs in the largest cities
the challenges and needs of our public and reinforcing the space dedicated
and private sector clients. We are now to green and alternative modes of
active across the full value chain, from transport. Reinventing mobility is
upstream consulting to the proposal undoubtedly a technical and institutional
of veritable bundles of mobility services, challenge of monumental scale, but it
all for the direct benefit of populations. is truly imperative if we wish to promote
new, more responsible travelling
Day after day, our teams demonstrate practices.
their ability to develop the right
technological solutions, for example
to offer optimal access to different modes
of transport or adapt infrastructure
to the latest safety requirements.
Our teams offer ever more effective From soft mobility to the
services that help people get around sustainable use of the car and from
better every day. In the area of smart electric vehicles to autonomous
parking, for example, we operate transportation, the mobility of the
Smart parking in Paris in around 40 towns and cities in France future must not only fit in with new
and abroad, with key references such urban rhythms, but it must also
The consortium formed
by Urbis Park Services,
as Paris and Amsterdam. be energy and resource efficient
Transdev and Egis manages in order to play its full role
the street parking enforcement in a carbon-free society.
system in six of the 20 Paris
© Moovia
arrondissements, representing
more than 43,000 spaces.
A first in France!
26 2018 A C T I V I T Y REP ORT 27
MOBILIT Y MOBILIT Y
Ukraine. As part Ukraine’s France. Egis is supporting NGE (the plant and equipment
France. Egis is advising the Lyon Metropolitan National Public Transport administrator) in setting up a new park-and-ride service
authority in the organisation, governance Programme, Egis was in Nantes based on a single ticket valid for both parking
and deployment of an action plan to manage selected as a consultant on and public transport.
© ambrozinio - Fotolia.com
mobility in its community. The stated aim three projects for trolleybus
is to reduce solo (single occupancy) car use, lines in the municipalities
© Stoa
with an approach founded on insight into of Kryvyï Rih, Kharkiv
user needs and the promotion of sustainable and Lviv.
transport modes.
Aix-Marseille-Provence urban
mobility plan
© Mario Renzi
France. On behalf of the
town council, Egis is
conducting an analysis
of public transport
service coverage and
addressing interfaces
at two transport hubs:
Sciez and Douvaine. MEZZANA MULTIMODAL Car Wash Services:
TRANSPORT HUB (CORSICA) access to car washes
with an Easytrip badge
© Ville de Thonon
© Easytrip Ireland
gateway to the Sarrola-Carcopino to offer its customers access
urban centre. to partner car washes, with
automatic invoicing thanks
to their electronic tolling badge.
MAJOR ENVIRONMENT
specifications which were included in the
and engineering structures,
Major Structures, Water, construction tenders (ecology, marine
Environment, Energy BU acoustics, sedimentology). Among the
A
most significant of these, we installed
anti-SPM (suspended particulate matter)
STRUCTURES
key vector for the economic barriers to protect the coral reefs,
development of Reunion contributed to the installation of eco-
Island (60,000 vehicles per reefs at the base of some of the piers to
day), the New Coastal Road is a 12.5 km promote the development of ecosystems,
combination of causeways and viaducts installed submarine acoustic shields
built above the ocean. Its main purpose (bubble curtains) to avoid disturbing
is to offer a remedy to the insecurity marine species, checked before any noisy
of the current coastal road between work that there were no sea mammals
Saint-Denis de la Réunion and Le Port, in the area by flying over with microlites,
often prone to rockslides and cyclonic and finally we suspended some night
swell. Back in 2011, when Egis won time lighting during sensitive periods
the EPCM contract put out for tender to prevent beaching by marine birds,
by the Reunion Regional Authority for some of which are native to Reunion
the design and construction of the road, Island. These flagship measures are
we documented all the natural data and perfectly in tune with the potential for
technical constraints and challenges development, protection and promotion
that the new structure would be required of Reunion. The construction investment
to satisfy. The viaduct, 5,400 m long amounts to 1.6 billion euros.
and 28.90 m wide, is built on 48 piers in
WATER ENERGY
the sea. It was designed to resist events
such as hundred-year cyclone tides and
sea vessel collisions, while its six lanes
of traffic include two for a segregated With its construction
light rail line. spearheaded by Egis’
multidisciplinary teams,
Building a structure in the sea and in
the New Coastal Road is
a cyclone-prone region required a series
a one-of-a-kind structure
of special measures. Virtually all of the
in France and will be one
New Coastal Road, viaduct was prefabricated on land then
Reunion Island transported and assembled on site using
of the symbols of Reunion
a huge barge the size of a football pitch Island in the 21st century.
Egis is at the helm of the for the pier blocks (with loads weighing
largest project ever undertaken
in the Indian Ocean: the New up to 4,800 tonnes) and a 2,500-tonne
Coastal Road, a gigantic piece launch beam for the deck segments.
of infrastructure running The viaduct must meet very stringent
12.5 km combining causeways
quality standards in order to guarantee its
and viaducts built above the sea.
In 2018, the project took durability in a marine environment which
a decisive step forward with is extremely aggressive for structures.
the assembly of most of the
© Egis
piers and deck segments
of the 5.4 km viaduct.
30 2018 A C T I V I T Y REP ORT 31
MA JOR STRUCTURES W AT E R
© Erwan Maitre
running 1,400 m between Montreal and Longueil beneath
the Saint-Laurent River. Works will be carried out without Southeast Asia is currently entering a period
closing the tunnel. of sudden urban transition, with a massive rural
exodus and populations congregating in often
Laure Prévot, chaotically-expanding urban hubs. To resolve this,
Infrastructure Egis has signed a framework contract for more than
and Project three years with the Asian Development Bank
© Philippe Berthet
Coordination to make cities more “livable” in six Southeast Asian
Engineer, countries. This is a vast programme of more than
Major Structures, one billion euros of investment divided into as many
Water, Environment, “sub projects” as there are urban services requiring
Energy BU improvement. This offers our teams an opportunity
to display the full extent of their expertise in the
area of urban water engineering (drinking water,
Philippe Toussaint, wastewater and drainage, flood protection), waste
Project Director, management and urban planning to substantially
Major Structures, Commissioning of Barka IV desalination plant
improve the quality of life of residents and make
Water, Environment,
the large Asian metropolises resilient and
Energy BU
sustainable by adapting to climate change, thanks Qatar. Egis spent two-and-a-half years providing project
to developments tailored to local circumstances. management ocnsultancy services including design
review, construction supervision and assistance
in operational launch in June 2018.
© James Dupont
Fighting flooding Extension of Brest industrial port
Philippines. Egis is assisting the Philippine government France. Egis is in charge of the comprehensive
in its flood management programme through the and integrated programme management
strengthening of mitigation infrastructure and a master of this extension project which also includes
plan for the improvement of the country’s watersheds. a wide range of environmental measures.
© Adobestock
challenges.
© Adobestock
32 2018 A C T I V I T Y REP ORT 33
ENVIRONMENT ENERGY
© Gilles Schartlé
REFORESTATION OF ZONES DEVASTATED
© Ricardo Serra BY A DAM COLLAPSE IN BRAZIL
Gilles Schartlé,
ITER Project Director,
Major Structures,
Water, Environment,
The Renowa foundation appointed us for an assignment Energy BU
Ricardo Serra, on the ecological restoration of the zones affected
Environment
by the collapse of the Fundão dam in 2015 in Mariana SUPPORT TO COUNTRIES
Manager, Brazil BU
(Minas Gerais). The foundation’s efforts focussed on three key COMMITTED TO THE FIGHT AGAINST ITER, REPRODUCING
themes: people and communities, land and water, reconstruction CLIMATE CHANGE THE SUN'S ENERGY
and infrastructure. Egis is contracted until 2020 to conduct
© Dalkia
reforestation works, covering a zone spanning 280 hectares.
More than a million trees of local essences will be planted. World. On behalf of the French
Through this ecological restoration, we wish to reinstate Development Agency (AFD), Egis
the damaged ecosystem and essential services such as water is coordinating the Adapt’Action
ITER (International Thermonuclear Experimental
programme which provides four years
production, climate regulation, carbon sequestration and wildlife Reactor) is preparing to pass on a hugely valuable
of support to 15 developing nations
habitat. This contract is a valuable opportunity to consolidate in the institutional, methodological legacy to future generations. When we have Design of boiler plants of the future Greater Lyon heating
and expand our technical experience acquired in ecological and operational deployment of their proven the feasibility of fusion energy, the world and cooling network
restoration projects. climate commitments. will have an alternative to fossil fuel
at its disposal. In addition to solar and wind
power and other renewable sources, the nuclear France. To conduct the comprehensive programme management of the five
heating and cooling generation and distribution plants, Egis used a BIM
fusion process will supply an additional option process from design phase to construction phase. Among the sites, the
based on the exploitation of a clean, safe and Surville facility will host the largest public biomass boiler plant in France.
virtually inexhaustible energy source. ITER is also
a project of every instant, where managing risks
Risk analysis of Seine Aval wastewater and schedules are an everyday concern. 2018 was
a watershed year in which major civil engineering
treatment plant
operations and the installation of utilities (HVAC A new generation
- heating, ventilation and air conditioning -, nuclear power plant
Achères, France. As part of an “Occupational Health electricity and other fluids networks) began at Hinkley Point
© Le bar floréal SIAAP
and Safety” mission, Egis is conducting a risk analysis to cohabit with machine assembly operations
on behalf of SIAAP relating to the explosive atmospheres and the implementation of the process which will
of the largest wastewater treatment plant in Europe. supervise its operation. It is also the year that United Kingdom. This will
saw the site powered up, through its connection supply clean, safe and
affordable electricity
to the national grid in January 2019. Finally, it was to more than five million
also this year that our basic contract was renewed households. Egis produced
until 2025, which is when the ITER machine the civil engineering
is due to enter into its operational phase, with drawings for the buildings
the production of the first “non-nuclear plasma”. of the nuclear island
© ICOS
For Egis, the adventure has only just begun! for the two EPR reactors.
OPERATION
13 years, connecting the centre of the
The success of the Autopista country, Mexico City, with the port
Golfo Centro project of Tuxpan on the Gulf of Mexico.
is a new stage in the Group’s This contract, which began on 1st February
2018, provides for the modernisation
expansion in Latin America, of manual tolling and electronic tolling
in particular through equipment, traffic regulation facilities,
and the renovation of road infrastructure.
the growth of its operating By following the MRO (maintenance –
activities. renovation - operation) model, we have
always pursued the objective of extending
the lifespan of equipment and installations
I
by providing effective maintenance
to guarantee the best possible safety
t has now been 27 years since to users. The technology used in Mexico
OCACSA (Operacion y Conservacion is identical to that developed in Europe,
de Autopistas Concesionadas) began such as fibre optics and emergency
operating the leading toll highways in the call-out services. However, in view of
country running between medium-sized the growing trend in smartphones use,
Mexican cities located in the central and the traditional SOS phones have been
northern states of Librans de Tecpan, replaced by a Wi-Fi solution accessible
Celaya, Ciudad Obregón and Hermosillo. to users wherever they are on the
This in-depth local knowledge, combined highway, thereby improving the interface,
with the expertise of Egis, has enabled the communication and assistance
us to become the leading independent to users. This proficiency was furthermore
highway operator in Mexico with nearly illustrated through two other contracts
800 employees, six contracts to our for the operation of the Atlacomulco-
name and an operated network Maravatío highway (centre of the country),
of 336 km. Egis’ know-how in the considered as a national reference,
structuring of operating companies and, more recently, the Jala-Compostela
Autopista Golfo Centro
and financial projects was decisive in the highway (in the west of the country).
public-private partnership
delivery of the public-private partnership 2018 was a productive year in terms
in Mexico
Autopista Golfo Centro. Indeed, the of growth and customer satisfaction.
Egis is responsible for the synergies existing between the different We expect to accelerate our development
operation, maintenance disciplines of the Group offer us more in Mexico, but also increase our footprint
and renovation of three sections
opportunities to analyse the feasibility in Latin America where we are already
of toll road, connecting
the centre of the country of projects and offer new services monitoring several large projects
(Mexico City) with the port to achieve total customer satisfaction. in Colombia and Peru.
of Tuxpan on the Gulf of Mexico.
© Egis
Average traffic amounts
to 170,000 vehicles per day.
36 2018 A C T I V I T Y REP ORT 37
R O A D A N D A I R P O R T O P E R AT I O N R O A D A N D A I R P O R T O P E R AT I O N
© Zoé Durieux
sections of the Vienna bypass Egis operates three major roads
which we operate. These panels
in Congo
enable us to supply electricity
to the tunnels on these sections.
© Hui Xu
A40 motorway between London and Birmingham
Ostend-Bruges airport voted
“Best company of the Year” Hermes Airports racks up the awards!
United Kingdom. In 2018, Egis took over the operation of this major
in 2018 motorway in the West Midlands of England (123 km). An environmental
conservation mission was also conducted on site on two butterfly
Cyprus. Hermes Airports, in which Egis
species, in partnership with UK Highways M40 Ltd et Highways
is a shareholder, has earned several accolades
Belgium. Egis is the concession England (project owner).
© Hermes Airport
© Joe Dunckley
©Cavitex
© Aurélie Vanthournout
Architecture, Tractebel, Oteis,
and “race days” with scalable services of the biggest sporting events in
Agence Ter, Lamoureux, the new
grandstand, with its audacious depending on requirements - company the world, will go down in Egis's
silhouette of a galloping horse, seminars, Fashion Week catwalks history as an adventure full
blends in seamlessly with
this renowned horse racing
or music festivals such as Solidays – of passion and emotion.
landscape.
40 2018 A C T I V I T Y REP ORT 41
C O N S U LT I N G C O N S U LT I N G
© Christian Laut
their carbon emissions by 60%. aimed at improving
inhabitants’ quality of life.
© Takuji Shimmura
France. As part of a project
management consultancy
assignment, Egis is responsible
for verifying the digital models
of plans to build the future
TOP 5
its operational digital platform dedicated
de Montbéliard Agglomération
to the reuse of construction materials
inaugurated its first bus rapid
and matching up all the stakeholders
transit service to cater
in the industry. Launched by Egis
to growing mobility needs
and Icade, Cycle Up is today the first consulting firms
General development plan for French Polynesia in its urban region. Egis
global solution to develop sustainable
supplied general assistance specialising in energy
and low carbon real estate. efficiency in France
during the progress of the
France. Egis provides its expertise in regional planning and stakeholder operation and coordinated the
consultation to produce the General Development Plan of French project in programming phase.
Polynesia, which aims to establish the planning priorities for the next
© Tim Platt
20 years.