The document provides information to draw a longitudinal section of a proposed road from chainage 1 to 9. The formation level at chainage 0 is 53 meters and slopes downward at a 1 in 100 fall. The formation width is 12 meters with 2:1 side slopes. Chainages are spaced at 40 meter intervals from 0 to 400 meters. Earthwork quantities need to be calculated.
The document provides information to draw a longitudinal section of a proposed road from chainage 1 to 9. The formation level at chainage 0 is 53 meters and slopes downward at a 1 in 100 fall. The formation width is 12 meters with 2:1 side slopes. Chainages are spaced at 40 meter intervals from 0 to 400 meters. Earthwork quantities need to be calculated.
The document provides information to draw a longitudinal section of a proposed road from chainage 1 to 9. The formation level at chainage 0 is 53 meters and slopes downward at a 1 in 100 fall. The formation width is 12 meters with 2:1 side slopes. Chainages are spaced at 40 meter intervals from 0 to 400 meters. Earthwork quantities need to be calculated.
Reduce level of the ground along the centerline of the proposed road from chainage 1 to 9 are given below.
The formation level at 0 th
chainage is 53m and road is in downward, formation width of road is 12m and side slope of bank is 2:1. length of chain is 40m. draw longitudnal section of the road . assume fall in slope of road is to be 1 in 100 Also calculate quantity of earthwork ?