Api 653 Preparatory Important Closed Book Questions: Professional Training and Consultation
Api 653 Preparatory Important Closed Book Questions: Professional Training and Consultation
P.O. Box No. 7274, Dammam 31462, Saudi Arabia ● TEL (966) 3 857 0006 ● FAX (966) 3 857 5255 ● info@gotoITC.com
● www.gotoITC.com
Professional Training and Consultation
29. The maximum allowed undercutting for horizontal joints of a API653 10.4.2.5
reconstructed tank is
30. If the material specification for the steel from an existing tank is API653 11.1.2
unknown or obsolete, how do you qualify the welding procedure
31. At what intervals Welders identification shall be marked adj. to API653 11.2.2
welds
32. What alternative methods are used to inspect the integrity of the API653 12.1.7.1
welded bottom joint
33. Areas of bottom plate repaired by welding in addition to MT/PT API653 12.1.7.3
are any other testing done.
34. The minimum diagnostic length of each radiograph is API653 12.2.1.7
35. For penetration installed using insert plates , butt weld between API653 12.2.1.8
the insert plate & shell plate shall be radiographed to what extent
36. Hydrostatic test of a reconstructed tank shall be held for how long API653 12.3.1.1
time.
37. At what intervals shall settlement be measured during hydrotest API653 12.5.2
38. The maximum spacing across diameter over which measurements API653 Fig. B-2
of bottom settlement are taken is
39. Internal Bottom settlement formula API653 B-3-3
40. What is the NDT Inspector Qualification requirement for API653 F 4.3
carrying out UT during tank repair?
41 UT procedure shall follow which Code/Standard API653 F 4.4