Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
2
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
2 Concrete Works:
Unit rates of concrete works includes supplying
and casting of a ready mixed concrete. The price
shall include all costs of material and workmanship
for preparing the formwork, shuttering, fixing of
steel reinforcement, vibration, curing making
grooves and sleeves ..etc.
2.3 Ditto, but for 56cm thick ribbed slabs. M2 220 0.00
2.6 Supply and cast concrete B300 for roof parapet. M3 20 0.00
3
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
3 Block Works:
4
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
4 Sealing Works:
5
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
6
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
5.1 A-Carpentry
5.1.2 Single sealed door 90x210 cm, type N-45 in the list UNIT 1 0.00
5.1.6 Four doors closet 240x200x40 cm, type N-85 UNIT 1 0.00
5.2 B. Metal Works 0.00
5.2.1 Ladder anchored to the wall, type M-21 in the list UNIT 1 0.00
5.2.3 Sheet metal door 35X200 cm type M-27 in the list UNIT 6 0.00
7
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
6.3 Sink and work area 302/60cm ,type M-61*in the list UNIT 1 0.00
6.5 Support handles in toilets, type M-65 in the list UNIT 10 0.00
8
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
9
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
10
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
9 Painting Works:
11
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
10 Aluminum Works:
12
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
11 Stone Works:
13
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
12 Suspended ceiling:
14
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
Wall Signs:
Supply & install Aluminum wall signs (plaques) with
writing in Arabic and English with a special solvent-
13.11
proof, weather and temperature resistant fixed on
the door or the wall. The price include labor work
and all fixing materials.
15
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
16
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
17
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
18
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
19
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
15.7 Supply and install UPVC vent cap for 4" vent pipes. UNIT 15 0.00
20
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
16.3 Supply and install chrome-plated brass towel rack. assy 14 0.00
21
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
22
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
23
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
24
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
18.55 (Provisional) Supply and install check valve 2'' UNIT 10 0.00
18.56 (Provisional) Supply and install Automatic Air Vent UNIT 4 0.00
25
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
26
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
20.3.b Same as item 20.3.a, but for two beds NO. 3 0.00
20.3.c Same as item 20.3.a, but for three beds NO. 7 0.00
Supply and installation of Local Area Pressure and
Vacuum Alarm Box:
27
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
28
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
29
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
30
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
25.3 Ditto same as item 25.1 but 20/10 with cover M.L. 60 0.00
Total of Structural Elements, Cabinets…..
0.00
carried to summary:
26 Grounding:
Supply, install and connect Complete lightning
system including exciter,120mm copper
conductor, 3-earth electrodes ,earth pit and all
26.1 L.S 1 0.00
required materials and accessories needed to
complete the job as specifications and Engineer
instructions.
31
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
28.2 Type (AE) Ditto as A but with emergency charger. Unit 14 0.00
28.3 Type (B) 2D 16W Globe with opal diffuser. Unit 18 0.00
28.8 Type (KE) Ditto as K but with emergency charger. Unit 8 0.00
32
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
33
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
34
Part 1: Construction of the remaining works at Alia Hospital 2nd floor
ATLAS # 14163
34 LV Boxes:
35
ATLAS # 14163 Part 1: Construction of the remaining works at Alia Hospital 2nd floor 16 June 09
Summary of Part 1
AMS
Engineering Unit @ UNDP/PAPP
ATLAS # 14163 Part 1: Construction of the remaining works at Alia Hospital 2nd floor 16 June 09
Summary of Part 1
Discount %
AUTHOURIZED PERSON :
TITLE :
SIGNATURE :
DATE :
AMS
Engineering Unit @ UNDP/PAPP
Bill of Quantities
Part 2
Prepared By
Lamasat Office
Architects & Interior Designers
June 2009
ATLAS # 14163 Part 2: Rehabilitation Works For Alia Hospital
39
ATLAS # 14163 Part 2: Rehabilitation Works For Alia Hospital
3 Plastering Works
Corridor Walls
supply and installation of 200x200x6mm high quality
ceramic tiles (Negev or equally approved) laid on 10 mm
thick mortar backing (1:1:4). Rates include roughening of
4.2 M2 640 0.00
walls and all needed preparation work to receive tiles, 2mm
thick stainless steel angles to be installed on corners as
per the drawings. For more details refer to drawing No.
A16.
To floor:
200x200x8mm high quality no-split ceramic tiles laid on
4.3.2 M2 160 0.00
30mm thick mortar bed (1:3) on sand bed or
aggregate as needed. For details refer to drawing No A06
40
ATLAS # 14163 Part 2: Rehabilitation Works For Alia Hospital
Stair treads:
Supply and install 3cm thick, 35cm width and 150cm length
polished local marble ( Sour Moeen or equally approved )
round edge nose treads, including sand bed underlay,
bedding and jointing in white cement and sand (1:4) and
4.4 M.R 40 0.00
pointing in white or colored approved pointing material cut
to size as shown on drawing No. A17 and as per the
engineer's instructions. The rate includes an edge piece for
water stop.
41
ATLAS # 14163 Part 2: Rehabilitation Works For Alia Hospital
Stair risers:
Supply and install 2cm thick and 150 cm length polished
local marble( Sour Moeen or equally approved ) risers,
bedding and jointing in white cement and sand (1:4) and
4.5 M.R 40 0.00
pointing in white or colored approved, pointing material cut
to size as shown on related details and as per the
engineer's instructions & drawing No A17.
42
ATLAS # 14163 Part 2: Rehabilitation Works For Alia Hospital
Supply and apply one coat of primer fill, two coats of putty
6.3 M2 3000 0.00
and three coats of emulsion paint for plastered walls
43
ATLAS # 14163 Part 2: Rehabilitation Works For Alia Hospital
44
ATLAS # 14163 Part 2: Rehabilitation Works For Alia Hospital
45
ATLAS # 14163 Part 2: Rehabilitation Works For Alia Hospital
9 Glass Works
9.1 Sekurit Glass
9.1.1 Sekurit Glass Panels
Supply and install 100 cm hight,1cm thick high quality
sekurit glass panels, including all accessories. For more M2 12 0.00
dimensions & details refer to drawing A13,A14.
9.2 Sand Glass Sekurit Panels
Supply and install sand plast 1cm thick sekurit glass panels
for door. For more dimensions & details refer to drawing M2 1.5 0.00
A14.
46
ATLAS # 14163 Part 2: Rehabilitation Works For Alia Hospital
47
ATLAS # 14163 Part 2: Rehabilitation Works For Alia Hospital
10.1.1 Windows
For windows details refer to drawing A18.
Type W1 overall size 728x60cm NAPCO 2200 or
equivalent .Complete with frame, glazing, mastic sealant, NO 3 0.00
ironmongery and hardware.
10.1.2 Doors
Emergency Door
Type door ED1 overall size 228x110cm.Thickness 52 mm
Weight =29 kg/m². Complete with galvanized frame,
glazing, mastic sealant, paint of door and frame according
to engineer instructions and approval, ironmongery and
NO 1 0.00
hardware and including 15mm glass vision panel for more
details refer to drawing No A18
48
ATLAS # 14163 Part 2: Rehabilitation Works For Alia Hospital
49
ATLAS # 14163 Part 2: Rehabilitation Works For Alia Hospital
50
ATLAS # 14163 Part 2: Rehabilitation Works For Alia Hospital
51
ATLAS # 14163 Part 2: Rehabilitation Works For Alia Hospital
52
ATLAS # 14163 Part 2: Rehabilitation Works For Alia Hospital
53
ATLAS # 14163 Part 2: Rehabilitation Works For Alia Hospital
54
ATLAS # 14163 Part 2: Rehabilitation Works For Alia Hospital
55
ATLAS # 14163 Part 2: Rehabilitation Works For Alia Hospital
56
ATLAS # 14163 Part 2: Rehabilitation Works For Alia Hospital
57
ATLAS # 14163 Part 2: Rehabilitation Works For Alia Hospital
58
ATLAS # 14163 Part 2: Rehabilitation Works For Alia Hospital
59
ATLAS # 14163 Part 2: Rehabilitation Works For Alia Hospital
Summary of Part 2
Bill Description Total
Section I Civil Works Summary
1 Demolish and Removal Works 0.00
2 Block work 0.00
3 Plastering Works 0.00
4 Tile Finishing Works 0.00
5 False Ceiling Works 0.00
6 Painting Works 0.00
7 Carpentary & Joinery Works 0.00
8 Insulatuion Works 0.00
9 Glass Works 0.00
10 Metal Works 0.00
11 Sand-blasting Works 0.00
Total of Civil Works 0.00
Section II Mechanical Works Summary
12 Sanitary fixture and their Accessories: 0.00
13 Water & Fire Fighting Works 0.00
14 Central Heating Works 0.00
15 Ventalation Works 0.00
16 Air Conditioning Works: 0.00
17 Medical Gas Supply: 0.00
Total of Mechanical Works 0.00
Section III Electrical Works Summary
18 Lighting System Works 0.00
19 Power System Works 0.00
20 Telephone & IT System 0.00
21 Fire Alarm System 0.00
22 Nurse Calling System 0.00
23 Public Address System 0.00
Total of Electrical Works 0.00
Total of Part 2 (Excluding VAT) 0.00
Discount %
Discount Amount 0.00
Net Total - Part 2 (Excluding VAT) 0.00
DATE :
ATLAS # 14163 Alia Hospital
Discount %
AUTHOURIZED PERSON :
TITLE :
SIGNATURE :
DATE :