Lab Preparasi Model

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

TOWER TOWER

AIR AIR

TERAS TERAS TERAS


MESS
PEKERJA

MESS
PEKERJA
TEMPAT
MESS 2000 PEMBUANGAN
PEKERJA
SISA SAMPEL
20X20 M

MESS
PEKERJA
TERAS TERAS

MESS
PEKERJA 2000

MESS
PEKERJA 200 300 200

GENSET
RUANG
400

MESS 1200
PEKERJA
JALAN SETAPAK

JALAN SETAPAK
TERAS TERAS

MESS
PEKERJA

MESS LAB.
1500
PEKERJA PREPARASI
15X12 M

MESS
PEKERJA
BONGKAR
400
TERAS TERAS

MESS MUAT
PEKERJA

10000
MESS
PEKERJA

JALUR UMUM
700
KENDARAAN
500 500

MESS
100
PEKERJA
210 400 300
300
TERAS TERAS

MESS
PEKERJA
JALUR UMUM

JALUR UMUM
KENDARAAN

KENDARAAN

400 DAPUR 400


MESS
PEKERJA

250
RUMAH
600 INDUK
250
TERAS TERAS TERAS

MESS
300 400
PEKERJA
400 RG. TIDUR
MESS 100
300
PEKERJA 300
200 TERAS

MESS
300 400 400
PEKERJA

150

150 2030
150 250
TERAS TERAS

MESS
JALUR UMUM

JALUR UMUM
KENDARAAN

KENDARAAN

PEKERJA

MESS
PEKERJA

TOWER
AIR
110 500 150
TOWER
AIR
75 400

75
POS JAGA
JALUR 300 JALUR
KELUAR MASUK
100 DRAINASE DRAINASE DEKER DEKER DRAINASE

5300

You might also like