G:/Acad/1762 Shuqaiq Phase-3/01 - General Plot Plan/C24 - Sa3-Ps4/3D Plant/C24 - Abha Ps4/Isometric/Final - A2/Prodisos/Drawings/C24-Ya40-S-7001 - 18.Dwg

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

STATION LEVEL ±0.000 = 1607.

00 masl WALL PASSAGE OR


GROUND PASSAGE
F = FLANGE / B = BOLTSET / G = GASKET V - STOP SUPPORT GUIDE SUPPORT
REFERENCE :
DOCUMENT NUMBER TITLE
ENGINEER'S STAMP: CONTRACTOR'S STAMP:
RR DOCUMENT COMMENT SHEET
No. C24-YA40-S-7001 No. EH-RR-C-2013
Rev. A Date 15.11.2019
STATUS A: Approved for construction (AFC)
B: Approved as noted (AAN)
D: For Information only (INF)

G:\acad\1762 Shuqaiq Phase-3\01_General Plot Plan\C24 - SA3-PS4\3D PLANT\C24_ABHA PS4\Isometric\Final_A2\ProdIsos\Drawings\C24-YA40-S-7001_18.dwg


26
6,
28
11
REV. ISSUED FOR BY CHECKED APPROVED DATE
KINGDOM OF SAUDI ARABIA
SALINE WATER CONVERSION CORPORATION (SWCC)
Project No.
20407 SHUQAIQ WATER TRANSMISSION SYSTEMS - PHASE 3

20° V
ENGINEER
CONTRACTOR
SHUQAIQ WTS - PHASE 3
SCALE
SA3-PS4, ISOMETRIC
% DRAWING NO. SHEET REV.
C 2 4 - Y A 4 0 - S - 7 0 0 1 18/25 0
SUB-
CONTRACTOR FINAL DESIGN: IBG Ltd.