LNV Technology Pvt.

Ltd
Sigapi Achi Building, 5th Floor,
18/3 Rukmani Lakshmipathi
Road Egmore., INSPECTION REPORT
Chennai – 600 008, India.
Tel: +91-44-399 0000
INSPECTION STAGE
INSPECTION REPORT NO: LNVT-1564/101220/SVR/475 DATE 10/12/20
FINAL

PO NUMBER & DATE : SP-20-1564,PO/20-21/0129 DT: 09.09.2020 SHEET 1 OFF 3

PROJECT REF : 1524 – NCCL, KENYA 10/12/20


DATE OF INSPECTION:

QAP NO/ REV: QAP / LNVT / IMMERSION TUBE SS / 080 – R1 REVIEW / WITNESS WITNESS

M/S. MABEL ENGINEERS PVT LTD, MAIL FROM MR.G.M.NARESH


SUPPLIER & LOCATION: INSP. CALL DETAILS:
GUMMIDIPOONDI KUMAR DT: 01/12/2020
SUB SUPPLIER &
CONTACT PERSON & NO MR. M.SHANMUGAM– 9500037884 ----
LOCATION:

EARLIER INSP. REPORT : NIL

DOCUMENTS REFRRED FOR INSPECTION LNVT PO √ LNVT APPROVED


Drawing √ TECHINCAL DATA
SHEET ---
OTHER DOCUMENTS ( IF
NIL
ANY)
INSPECTION ITEM AS PER PO:
REV ACCEPT REWORK HOLD REJECTE
S NO ITEM DESCRIPTION DRAWING NO PO QTY INSP. QTY
NO QTY QTY QTY D QTY

IMMERSION TUBE FOR PH-2


1 AMR/17/PH2/020 0 1 NO. 1 NO. 1 NO. - - -
CYCLONE 5: MATERIAL – 310

IMMERSION TUBE FOR PH-2


2 AMR/17/PH2/032 0 1 NO. 1 NO. 1 NO. - - -
CYCLONE: MATERIAL – 310

3 AIR NOZZLE ; MATERIAL-304 AMR/17/PH2/031 0 50 NO'S 50 NO'S 50 NO'S - - -

CONCLUSION: HARD PUNCH X


ACCEPTED √
WITNESS INSPECTION CARRIED OUT AND FOUND ACCEPTED. S.NO.1 TO 3 IMMERSION TUBE AND
AIR NOZZLES ARE CLEARED FOR FURTHER PROCESS.
REWORK X
NOTE: PROPER PACKING(SEA WORTHY PACKING) TO BE DONE TO AVOID DAMAGES TO IMMERSION
TUBE SEGMENT AND TO AIR NOZZLES.
REJECT X
HOLD X
SUPPLIER LNVT CUSTOMER

SIGNATURE : SIGNATURE : SIGNATURE :

NAME: NAME: RAMESH.V NAME:


LNV Technology Pvt.Ltd
Sigapi Achi Building, 5th Floor,
18/3 Rukmani Lakshmipathi
Road Egmore., INSPECTION REPORT
Chennai – 600 008, India.
Tel: +91-44-399 0000
INSPECTION STAGE
INSPECTION REPORT NO: LNVT-1564/101220/SVR/475 DATE 10/12/20
FINAL

INSPECTION ACTIVITY NARRATIVE SUMMARY

1 DOCUMENTS

1. DOCUMENT REFERRED: LNVT PURCHASE ORDER, CUSTOMER APRROVED DRAWING DATED 03 SEP 2020 AND APPROVED QAP

2. RAW MATERIAL FOR IMMERSION TUBE WITNESS INSPECTION CARRIED OUT AND FOUND ACCEPTED. LNVT REPORT NO. LNVT-1524 /
22092020 / VBM / 339 DATED 22.09.2020.

3. AIR NOZZLE PIPE AND FASTENERS TEST CERTIFICATE REVIEWED AND FOUND IN ORDER.

4. WPS AND PQR ARE SPOT REVIEWED AND FOUND OKAY

2 VISUAL

1. VISUAL INSPECTION CARRIED OUT FOR IMMERSION TUBE IN ASSEMBLED CONDITION, INDIVIDUAL SEGMENT AND AIR NOZZLES
FOUND STAISFACTORY

2. ORIENTATION CHECKED AND MATCH MARKING DONE FOUND ACCEPTED.

3. AS PER DRAWING ARM/17/PH2/031 SHEET 02 OF 02, 21/2” PIPE IN LOOSE CONDTION AND TO BE WELDED AT SITE.

4. DP TEST RANDOM WITNESS FOUND OKAY.

3 DIMENSIONS

1. IMMERSION TUBE DIMENSIONS ARE CHECKED IN ASSEMBLED CONDITION AS WELL AS INDIVIDUAL SEGMENT FOUND ACCEPTED.

2. IMMERSION TUBE CHECKED WITH FULL SIZE TEMPLATE FOUND STATISFACTORY.

3. AIR NOZZLES DIMENSIONS ARE CHECKED AND FOUND AS PER DRAWING.

NOTE:

PROPER PACKING(SEA WORTHY PACKING) TO BE DONE TO AVOID DAMAGES TO IMMERSION TUBE SEGMENT AND TO AIR NOZZLES.

ATTACHMENT:

S. no Description No Of Pages S.No Description No Of Pages

1 RAW MATERIAL TC'S 10 5

2 INTERNAL STAGE INSPECTION REPORT 8 6

3 FINAL INSPECTION REPORT 3 7


IDENTIFICATION REPORT AND PENETRANT
4 5 8
REPORT

SUPPLIER LNVT CUSTOMER

SIGNATURE : SIGNATURE : SIGNATURE :

NAME: NAME: RAMESH.V NAME:


LNV Technology Pvt.Ltd
Sigapi Achi Building, 5th Floor,
18/3 Rukmani Lakshmipathi
Road Egmore., INSPECTION REPORT
Chennai – 600 008, India.
Tel: +91-44-399 0000
INSPECTION STAGE
INSPECTION REPORT NO: LNVT-1564/101220/SVR/475 DATE 10/12/20
FINAL

PHOTOS:

SUPPLIER LNVT CUSTOMER

SIGNATURE : SIGNATURE : SIGNATURE :

NAME: NAME: RAMESH.V NAME: