Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Palestine Polytechnic University

College Of Engineering
Department Of Electrical Engineering

Electrical Installations and Protection Systems Project


) ‫( توزيع القدرة على الفازات‬

Supervised By: Eng. Nassim Iqteit

Done By: Abdalla Bannoura


Mohammad Agha

November 14, 2020


No. of floor Load Phase - A Phase - B Phase - C

Lighting L1:L2 = 4 A L3:L5 = 6 A -

Power - - P1:P2 = 6 A
15hp ‫مصعد‬
-1 P3 = 17 A P3 = 17 A P3 = 17 A
‫ فاز‬3
‫مضخة‬
P4 = 7 A - -
3hp
‫مضخة‬
- P5 = 17 A -
5hp
0-5 Path Lighting - - L1:L6 = 12 A

Lighting - L7:L8 = 40 A L9:L11 = 60 A

Power P1:P5 = 100 A P6:P9 =80A P10:P17 = 120A

‫شفاط‬ P18 = 40 A P19:P20 = 80A -


For all Apartments (20)

‫سخان ماء‬ P21 = 360 A - P22 = 360A

‫مايكروويف‬ - P23 = 40 A -

‫فرن‬ - P24 = 420 A -


0-4
‫ثالجة‬ - - P25 = 40 A

‫غسالة‬ - - P26 = 80 A

‫جالية‬ - P27 = 80 A -

‫تلفاز‬ - - P28:P29 = 20 A
‫ طن‬0.5 ‫تكييف‬
- - P30 = 240 A
‫ فاز‬3
‫ طن‬1 ‫تكييف‬
P31 = 480 A - -
‫ فاز‬3
No. of floor Load Phase - A Phase - B Phase - C

Lighting - L1:L4 = 8 A L5:L7 = 6 A

Power - P1:P15 = 30 A P16:P25 = 20 A

‫شفاط‬ - P26:P29 = 16 A -

‫سخان ماء‬ - P30:P31= 72 A P32:P33 = 72 A


For all Apartments (2)

‫مايكروويف‬ - P34:P35 = 8 A -

‫فرن‬ - P36 = 40 A -
5
‫ثالجة‬ - P37:P38 = 8 A -

‫غسالة‬ - P39 = 8 A -

‫جالية‬ - P40:P41 = 16 A -

‫تلفاز‬ - P42:P43 = 4 A -
‫ طن‬0.5 ‫تكييف‬
- P44 = 24 A -
‫ فاز‬3
‫ طن‬1 ‫تكييف‬
- - P45 = 48A
‫ فاز‬3
Total Per Phase 1008A 1014A 1001A

:‫ و الكابل العموميين‬CB ‫ أختيار ال‬


ICB = 1.25 × 1014 = 1268 A
:‫ونظرا لوجود لوحتان رأيسيتين في المبنى‬ 

1268
ICB ∗ = = 634 𝐴 → 𝐶𝐵 = 800𝐴 → 𝐶𝑎𝑏𝑙𝑒 = 3 ∗ 350 + 50 𝑚𝑚2
2

You might also like