PETROCHINA

CONTRACTOR WEEKLY REPORT Document NO HSSE-DQ0724

Project Name: DQDC

Safety Rep.: Yu lianghong Date: 2012-01-01


To be completed every week before Weekly HSSE Meeting
Sr. DQ021 DQ023 DQ029
Description Remark
No. Last Week Cumulative Last Week Cumulative Last Week Cumulative

1 Near Misses 0 17

2 H.S.E Induction Training 2 66

No of In-house H.S.E Training carried out 8


3 177
/No of personnel attended

No of Tool Box Meeting carried out / No of 3/11


4 33/388
personnel attended

5 H.S.E Meeting 2 52
6 H.S.E Inspections 10 216
7 H.S.E Audits 0 16
8 Emergency Evacuation Drills 3 66
9 Safety Awards Distributed 4 57
10 Safety Violations Reported 0 0
11 STOP CARDS Received 19 616
12 Vehicles Check Performed 2 65

Appendix B
PETROCHINA
CONTRACTOR WEEKLY REPORT Document NO HSSE-DQ0724
Trainings Topics Covered:
DQ021: Nine Golden Life Saving rules, Lifting operation, Work at Height, Hazard Recognition, Permit to Work, STOP
Card, Use of SCBA, Use of Fire extinguisher.
DQ029:

Other safety activities:


DQ021:: 1、H2S Drill 2、Kick drill, 3, Fire
DQ023:
DQ029:

NON-HAZARDSOUS WASTE REPORT

No Rig Name Garbage(kg) Sewage(m3) Oil Filters(ea) Location Remarks

1 DQ021 121 93 HF161-Y161

2 DQ023

3 DQ029

Completed by: Muhammad Hanif Signature: Date:2012/01/01


Project Manager / Sub. Rig Manager: Chen Hongzheng Signature: Date: 2012/01/01