Individual Assignment 1 (20%): Consider a small project with ten activities (Table 2.

1), which lists


the activities, their most likely completion times, and the activities that must precede them. The table
also includes optimistic and pessimistic estimates of completion time for each activity in the list (all
in days).
Table 2.1: List of activities and Precedences
Activity Precedence Optimistic Time Most Likely Time Pessimistic Time
a - 10 22 22
b - 20 20 20
c - 4 10 16
d a 2 14 32
e b, c 8 8 20
f b, c 8 14 20
g b, c 4 4 4
h c 2 12 16
i g, h 6 16 38
j d, e 2 8 14
Answer the following questions based on Table 2.1.
a) Construct the AON and AOA networks.
b) Estimate activity time and variances.
c) Find the critical path and time.
d) Calculate project float (slack).

Instructions:
• The deadline for submission is October 10, 2020.
• Late submissions will not be accepted.
• Any kind of plagiarism has no excuse.