SRI RAMAKRISHNA READYMIX CONCRETE

CLIENT NAME : Date

CHECK LIST FOR POST CONCRETING


ADDRESS & LOCATION : Start Date : Start Time : End Date : End Time : Temperature of
Concrete :

Estimated Volume of Concrete ( cum. ) : Grade of Concrete :

Checked By
Sl No. Item Description Remarks
SRK CLIENT

POST CONCRETING

1
Wheather the concrete surface is roughened
after three hours of concreting

2 Wheather the concrete surface is water sprayed

3
Ponding method of curing method has been
carried out

4 Deshuttering done after specified time

5 Thickness of the slab

6
No visual exposure of groups of coarse
aggregate

7 No visual leakages In slab

8
Formwork, nails wooden chips etc. are removed
after specified time
8
Compressive Strength :

a. 3 days

b. 7 days

Remarks if any :

CLIENT EXECUTION SRK QC RMC/QC-Head


SRI RAMAKRISHNA READYMIX CONCRETE

CLIENT NAME : Date

CHECK LIST FOR PRE CONCRETING

ADDRESS & LOCATION :

Estimated Volume of Concrete ( cum. ) : Grade of Concrete :

Checked By
Sl No. Item Description Remarks
SRK CLIENT

PRE CONCRETING

1 Mix Proportion / Grade of Concrete

Sufficient no. and adequate size of vibrating and finishing


2
tools are available.

3 Curing arrangement ( Hessian cloths etc.) available

4 Thickness of the slab & gauge

5 Reinforcement are properly tied and chairs are provided

6 Cover blocks are provided

7 Formwork free from holes and gaps

8 Formwork Supports and Levels are Correct

Remarks if any :

CLIENT EXECUTION SRK QC RMC/QC-Head