REPORT NO.-TUVAT/2015/2412/056/BULLDOZER/025

Bangladesh Erectors Limited


Customer Erectors House, 18, Kemal Ataturk Avenue Banani C/A,
Dhaka-1213, Bangladesh.
Customer Ref No. TUVAT/QUOT/ID/2015/2412/056
Location of Inspection Bhulta 400/230 KV AIS Project, Narayangonj.
Date of Inspection 23th March 2016

Detail of Equipment
1. Name of the equipment Bulldozer
2. Manufacturer KOMATSU
3. Model Not found
4. Serial No. Not found
5. Year of Manufacturer Not found

Visual /Observation
S Un R AR Remarks
1. Bucket/Blade x
2. Bucket Cylinder/Push Beams x
3. Control Lever x
4. Chassis/Under carriage x
5. Water leakage from any unit Not check due to break down
6. Oil Leakage from any unit Not check due to break down
7. Radiator Coolant Level x
8. Radiator x
9. Power Steering Oil/Air Filter x
10. Reverse Alarm/Backup Signal Not check due to break down
11. Brake lines x
12. Fuel lines x
13. Air Hoses and Pipes x
14. Exhaust pipe x
15. Battery Fluid x
16. Fuel/hydraulic Tank with cap x
17 Counter Weight/Back side condition x
18. Cab Condition x
19. Brakes Not check due to break down
20. Light Not check due to break down
21. Engine Condition Not check due to break down
22. Hydraulic system Not check due to break down
23. Water pump/Overall Engine Condition Not check due to break down
24. Air filter x
25. Flame arrestor N/A

Rev: 05/ 2012, Dated: Monday, April 18, 2016


nd
Bangladesh Office: House-105 (2 Floor), Flat-B2, Road-13/A, Block-C, Banani, Dhaka-1213, Bangladesh. T: 8836403; F: 8836404
Regional Head Office: 43/2, Main Gulberg, Lahore, Pakistan. T: +92 (42) 111 284 284; F: + 92 (42) 35872179-80
International Head Office: Krugerstrasse 16, 1015 Vienna Austria, Tel: + 43 (0) 514 07

info@tuvat.com.bd www.tuv.at
TUV/LF/001
Date of Re-Issue June 12, 2013
Page 2 of 2
26. Tires/link/Crawler Condition x
27. Battery, cable and terminals x
28. Brakes including hand brakes Not check due to break down
29. Horn/other signals/alarm Not check due to break down
30. Hydraulic hoses x
31. Nut Bolts x
32. Hydraulic pumps Not check due to break down
33. Fire Extinguisher Not found
34. First Aid Kit Not found
35. All gauges Not check due to break down

Function Test
S Un R AR Remarks
1. Starting Engine Not check due to break down
2. Engine Vibration Not check due to break down
3. Engine Noise Not check due to break down
4. Engine Operation Not check due to break down

o S: Satisfactory
o Un: Unsatisfactory
o R: Repairable
o AR: After Repair

Conclusion & Recommendations:


Recommendations
AT the time of inspection the above bulldozer was found break down due to some maintenance work going on so
that function test/another necessary test no performed on that time. However it is strongly recommended that the
above bulldozer will be inspected after completion of repair.

“This
This Certificate does not make any warranty/indemnity expressed or implied, relating to the above equipment. This
Certificate does not relieve seller/suppliers from their contractual responsibilities with regard to quality/quantity of this
delivery nor does it discrimination the buyer’s right of claim towards their seller/suppliers for compensation for any
apparent and/or hidden defects not detected during our inspection & testing or occurring thereafter.”

ANNEXES Yes (Total number of pages: 0) No

Inspected by: Checked by:


Name: Ripan k Prodhan Name: Md. Ataur Rahman Khan

Signature: Signature:
Date of issue : March 28, 2016
Inspection centre: TUV Austria BIC Bangladesh

Rev: 05/ 2012, Dated: Monday, April 18, 2016


nd
Bangladesh Office: House-105 (2 Floor), Flat-B2, Road-13/A, Block-C, Banani, Dhaka-1213,
1213, Bangladesh. T: 8836403; F: 8836404

You might also like