Layout
I – RAILWAY BRIDGES
General Remarks for all kinds of bridges:
1- The deck bridge is the best type because the compression chord of the
truss is braced by cross girders (X.G). [Lb out of upper compression chord
will be distance between cross girders].
2- There must be horizontal wind bracing at the level of the lower flange
of X.G.
0.3-0.4m
Stringer Br.
3.5m sec 1
Min 5.5m
B/9 sec 2
-
B/7 H
S/10
S/10
B/7- B/9
sec 3
1.8m 1.7m 1.8m 1.7m 1.8m 1.8m
12.3-12.5 m 7.2-7.5m 5.3 m
1/15-LA
Railway truss bridges
Layout
Braking force bracing
Wind bracing Stringer bracing
S=4.0 -7.0m
M.G.
stringer
X.G.
X.G.
M.G.
Plan of bracing Plan of floor beams
S/10
5.5 m, h is measured from the top of
B/9
the rail level h = H MG – h – 0.20 -
XG B/7
1.8m 1.7m 1.8m 1.7m 1.8m
m (sleeper) – 0.15 m (rail) – 0.3
12.3-12.5 m
(height of upper member)
The through bridge is preferable than pony bridge because the
compression chord is supported by bracing.
In case of using through bridge, a closed frame or inclined
frames at both ends of the bridge must be provided to transfer
load from upper lever of upper bracing to bearings.
2/15-LA
Railway truss bridges
Layout
4-7m
L=70-80m
Elevation of M.G. Box portal frame
Box portal frame
4-7m L=70-80m
Elevation of M.G. roller bearing
4-7m L=70-80m
Elevation of M.G.
3/15-LA
Railway truss bridges
Layout
S=4.0 -7.0m
M.G.
stringer
X.G.
X.G.
M.G.
Plan of bracing Plan of floor beams
6- The width of the bridge "B" is nearly constant because the width of
train is constant and is determined as follows:
- 3.5 m in deck bridges & 5.3 in pony & through bridges.
- For each additional track in any kind of bridges add 3.5 m
i.e. Deck bridge:
Single track = 3.5 m
Double track = 3.5 + 3.5 = 7 m
Triple track = 3.5 + 2 *3.5 = 10.5 m
Pony or through bridge:
Single track = 5.3 m
Double track = 5.3 + 3.5 = 8.8 - 9 m
Triple track = 5.3 + 2 *3.5 = 12.5 m
Note:
For long span bridges, L > 40 m, we use the main system as a
L Upper chord
truss with height "H" = .
8 10
The shape of the M.G. is as follows the upper
chord is in the shape of " "- section while the Vertical
Haunch
lower chord is in the shape of "Double T"
Lower chord
4/15-LA
Railway truss bridges
Layout
It's preferable that number of panels is even
ﯾﻜﻮن زوﺟﻲ ﻟﺘﻤﺎﺛﻞ اﻟﺸﻜﻞXG ﻋﺪد اﻟﻤﺴﺎﻓﺎت ﺑﯿﻦ ال
L
7- The spacing between X.G "S" is taken H mg so the angle of
10
diagonal of main truss will be equal 450.
The number of panels will be 8 or 10 or maximum 12 ()زوﺟﻰ.
8- There is no concrete slab so we cannot make composite action.
9- There must be a stringer nearly under
each rail. Stringer Br.
3.5m sec 1
10- The spacing between stringers is 1.8 m B/9 sec 2
-
B/7
(constant) [the distance is not 1.5 m as 1.8m 1.7m 1.8m H
S=4.0-7.0m
M.G.
B
X.G.
M.G.
Plan of wind and braking force bracing
5/15-LA
Railway truss bridges
Layout
14- Drawing of lateral shock bracing (stringer bracing), the bracing is a
horizontal truss to carry horizontal loads. It consists of stringer as upper
& lower chord, verticals and diagonals are added.
X.G.
X.G.
stringer
M.G.
Plan of floor beams(sec 1)
15- The distance between verticals of stringer bracing is 1.5 – 2.0 m (so
the diagonal is inclined at nearly 45 o)
M.G.
X.G.
X.G.
16- The level of braking force bracing is at the level of the lower
flange of X-G. The braking force is transmitted from level of Rail (upper
6/15-LA
Railway truss bridges
Layout
flange of XG) to level of braking force bracing (lower flange of XG) by
one of the following 2 methods : -
Either Full depth stringer or bracket ( as discussed in plate girder)
: ﻣﻠﺤﻮﻇﺔ ھﺎﻣﺔ
braking force bracing ﺗﻮﺿﯿﺢ ﻛﯿﻔﯿﺔ ﻧﻘﻞ ﺣﻤﻞ اﻟﻔﺮاﻣﻞ ﻋﻠﻲ
Stringer Br.
S/10
3.5m sec 1
B/9 B/9 sec 2
- H -
B/7 1.8m B/7 1.8m 1.7m 1.8m H
sec 3
3.5 m
7.2-7.5m
19- The upper bracing in through bridge and lower bracing in Deck
Bridge can be in the shape of either x-system or rhombic system.
S=4.0-7.0m S=4.0-7.0m
7/15-LA
Railway truss bridges
Layout
upper bracing X-bracing
X.G.
1.7-1.8m
8/15-LA
Railway truss bridges
Layout
23- The main dimensions of the train envelope ( ) اﻟﺠﺒﺎرﯾﺖis as shown:
ms
5 .0 0 m
ms
5 .0 0
5 .0 0
Min 5cm
X.G.
1.8m
0.3-0.4m
Min 5.5m
H
S/10
Min 5cm
B/9
-
B/7
1.8m 1.7m 1.8m 1.7m 1.8m 1.8m 1.7m 1.8m
8.8-9.2 m
12.3-12.5 m
9/15-LA
Railway truss bridges
Layout
25- The stringer may be added over the X.G. The actual height of
construction in this case will be hstringer + hx.g.+0.45
7-8m
70-80m
Deck bridge
10/15-LA
Railway truss bridges
Layout
7-8m 70-80m
Pony or through
11/15-LA
Railway truss bridges
Layout
Very Very Important:
How to determine the type of bridge whether it is deck, pony,
through?
The choice of the type of bridge depends mainly on:
1- Whether the compression chord is supported or not.
From the point of supporting compression chord, Deck Bridge is the
best choice then through bridge & finally pony is the most expensive.
2- The relation between the available height of construction "H"
and the construction height of the bridge "Hc".
a- The construction height of the bridge "Hc" is measured from the top of
the bridge floor (the rail level) to the level of the bottom flange of the
lower chord.
ﯾﻘﺎس ﻣﻦ ﻣﻨﺴﻮب اﻟﻘﻄﺎرات )أﻟﻘﻀﯿﺒﺎن( اﻟﻰ ﻣﻨﺴﻮب أﺳﻔﻞ ﻧﻘﻄﺔ ﻓﻰ اﻟﻜﻮﺑﺮى
- Height for deck bridge is htruss + 0.2(sleeper) + 0.15 (rail) +
(0.1 is the deflection)
- Height of construction for pony and through bridge is h XG +
0.45.
b- Available construction height "H" may be given or calculated as
follows:
H = Bank level – H.W.L – Δ required for navigation
Bank level
Navigation
H.W.L.
The actual height of construction "Hc" must be less than or equal the
available height of construction "H". (HC ≤ H).
12/15-LA
Railway truss bridges
Layout
L
If Htruss + 0.45 = +0.45 ≤ H So use deck bridge.
10 12
L
If Htruss + 0.45 = +0.45 > H So use through or pony.
10 12
0.3-0.4m
Min 5.5m
H
S/10
B/9
-
B/7
1.8m 1.7m 1.8m 1.7m 1.8m
12.3-12.5 m
13/15-LA
Railway truss bridges
Layout
Examples to determine the type of bridge:
Example 1:
2 tracks railway bridge crosses a river with level of H.W.L (10.00) and
L.W.L (8.00). The Rail level is (15.00) and the height required for
navigation is 3.00. The width of the river is 50 m.
Solution:
Width of river = span of bridge
H = Available height of construction = 15 – 10 – 3 = 2 m
50
H C deck = + 0.45 = 5.45
10 12
4.6 m > 2 m
So we cannot make Deck Bridge.
Since we will use pony or through bridge, so B = 5.3+3.5 = 9.0m
B 9
H XG = = 1.0m
8 79
For through bridge: h = 5- 1 – 0.35 -0.3 = 3.35m 5.5m
So we cannot use through Bridge
So the bridge must be pony
14/15-LA
Railway truss bridges
Layout
Example 2: Important
3 tracks railway bridge crosses a river with level of H.W.L (10.00) and
L.W.L (8.00). The Rail level is (18.00) and the height required for
navigation is 3.00. The width of the river is 50 m.
Solution:
H = Available height of construction = 18 – 10 – 3 = 5 m
50
H C = for deck = + 0.45 = 4.60 5.45 m
10 12
O.K. use Deck Bridge with H truss = 5- 0.45
= 4.55m
Example 3:
One track railway bridge crosses a river with level of H.W.L (10.00)
and L.W.L (8.00). The Road level is (15.00) and the height required
for navigation is 3.00. The width of the river is 70 m.
Solution:
H= 15 – 10 – 3 = 2 m
70 0.3
H C for deck = + 0.45
10 12 Min 5.5m
H
= 6.3m 7.45 m > 3 m
So it is either pony or through
0.65
Since this bridge is through or pony 1.8m
5.3
H XG = = 0.65 m Take HMG = 0.65 + 0.45 + 5.5 + 0.3 = 7.0 m
8
15/15-LA