Ethiopian Roads Authority Vol.

III: Bid Document


Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Bill (1):
Shire - Shiraro - Humera - Lu

Referen
Unit Rate Unit Rate
ce Description Unit Quantity
(ETB) (ETB)
No.

CGGC SUR_GITTO

Bill (1) : General Provisions

1200 General Requirements and provisions

Provisional
(a) General STD and HIV/AIDS alleviation measures Sum 1.00 1,000,000.00 1,000,000.00

(b) Contractor's charges and profit associated with the


1216 administration of the above item % 1,000,000.00 10% 41%

1200 Total carried forward to Bill (1)


Office, laboratory, accommodation, transportation and facilities, for the
1400 Engineer
(a)
Provide and maintain temporary facilities for the Engineer

(i) Office fully fitted, furnished and equipped including all services month 6 5,105.99 106,671

(ii) Laboratory fully fitted, furnished and equipped including all services month 6 5,105.99 97,410

(iii) Housing Accommodation fully fitted, furnished and equipped including all
services No*month 48 2,553 26,500

(vi) Vehicles including all operating costs

Vehicle Type A Veh. month 12 25,529.93 42,888

Vehicle Type B Veh. month 24 22,126 34,310

(v) Surveying equipment (Total Station and Level with all accessories, labour,
assistances as order by the Engineer) month 6 20,424 40,749
(b)
Office building and equipment as specified including furniture (Appendix 1)
Lump sum 1 1770075.26 3296653
(i) Provide office building, equipment and furnishings
month 36 4254.99 32967
(ii) Maintenance of office and office equipment
(c) Laboratory building and equipment complete as specified including furniture and
fittings (Appendix 1)
Lump sum 1 3063591.79 1037448
(i) Provide laboratory building, equipment and furnishings
month 36 3403.99 28818
(ii) Maintenance of laboratory building and laboratory equipment
(d)
Survey equipment for the Engineer
Lump sum 1 1191396.81 799456
(i) Provide survey equipment as per Appendix 1, A.5
month 36 3403.99 22095
(ii) Maintain survey equipment
(e)
House Type A complete as specified including fixtures and hard furnishings
Lump sum 1 1838155.07 1803586
(i) Provide Type A housingings
month 36 680.8 18035
(ii) Maintenance of Type A houses
(f)
House Type B complete as specified including fixtures and hard furnishings
Lump sum 1 2042394.53 2645665
(i) Provide Type B housingings
month 36 680.8 26457
(ii) Maintenance of Type B houses
VIII-5
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Referen
Unit Rate Unit Rate
ce Description Unit Quantity
(ETB) (ETB)
No.
(g) House Type C (Dormitory Building) complete as specified including fixtures and
hard furnishings

(i) Provide Type C housing Lump sum 1 1021197.26 853194


(ii) Maintenance of Type C houses month 36 680.8 8532

(h) House Type D (Kitchen and Mess Building) complete as specified including
fixtures and hard furnishings
(i) Provide Type D housing Lump sum 1 255299.32 545717

(ii) Maintenance of Type D houses month 36 680.8 5457

(i) House Type E (Service Quarters) complete as specified including fixtures and
hard furnishings
(i) Provide Type E housing Lump sum 1 255299.32 946134
(ii) Maintenance of Type E houses month 36 680.8 9461

(j) Vehicles for Engineer and his staff

(i) Provide Vehicle Type A as specified number 3 1198204.79 1510515

(ii) Provision of driver, fuel and lubricants and the servicing, maintenance, month 36 6978.18 28200
insurance and repair of vehicle Type A for the Engineer and his staff based on
an average 4000km/month/vehicel

(iii) Provide Vehicle Type B as specified number 7 629738.31 852459


(iv) Provision of driver, fuel and lubricants and the servicing, maintenance, month 36 5446.39 52640
insurance and repair of vehicle Type B for the Engineer and his staff based on
an average 4000km/month/vehicel

(v) Addition to or deduction from Item 14.01(j)(ii) for additional/reduced vehicle Kilometre rate only 7.52 7
Type A usage

(vi) Addition to or deduction from Item 14.01(j)(iv) for additional/reduced vehicle Kilometre rate only 6.3 13
Type B usage

(k) Radio communication system for the Engineer

(i) Provide and install radio system as specified Lump sum 1 340399.09 991754

(ii) Maintain radio system month 36 851 6992

(l) Additional office and laboratory equipment ordered by the Engineer Prov Sum 1 100000 100000

(m) Allow % on-cost to invoiced amounts for equipment supplied under item 14.01(l) % 100000 10% 41%

(n) Laboratory testing (additional testing) to be carried out at external (commercial) Prov Sum 1 100000 100000
laboratory

(o) Allow % on-cost to invoiced amounts for additional testing under item 14.01(n) % 100000 10% 41%

1400 Total carried forward to Bill (1)

VIII-6
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Referen
Unit Rate Unit Rate
ce Description Unit Quantity
(ETB) (ETB)
No.

1500 Traffic management


Accommodating traffic and maintaining temporary diversions including all
construcion, drainage, personnel, traffic sign/signals, safety complete including
15.01 removals km 120.00 13,615.96 65,975.00

Accommodating traffic where the road is constructed in half-widths including all


construcion, drainage, personnel, traffic sign/signals, safety complete including
15.09 removals km 36.00 5,956.98 15,942.00

1500 Total carried forward to Bill (1)

2100 Clearing and grubbing

21.01 Clearing and grubbing ha 237.65 9,578.71 10,698.00

Removal and grubbing of large trees and tree stumps


21.02 (a) Girth exceeding 1m up to and including 2m No 150.00 106.44 422.00

(b) Girth exceeding 2m up to and including 3m No 50.00 111.76 563.00

2100 Total carried forward to Bill (1)

2200 Demolition, removal, disposal or storage of existing structures and


installations

Cleaning out of hydraulic structures

(a) Pipes with an internal diameter up to and including 750mm m3 16.41 111.03 30.00

22.02 (b) Pipes with an internal diameter exceeding 750mm m3 805.68 108.79 28.00

(c ) Box and slab culverts up to and including 1.50m vertical dimension m3 123.30 149.15 28.00

(d) Box and slab culverts exceeding 1.50m vertical dimension m3 351.68 144.66 28.00

Take up or down and set aside for reuse or remove to store off site the following

(i) Block work or stone work m3 2,435.00 37.68 69.00

(ii) paved areas and the like, Pitching work etc. m2 10.00 5.00 12.00

(iii) curbs, channels, edgings, combined drainage, and curb blocks, fencing,
safety fences, coping, string courses and the like m 40,000.00 20.49 5.80
22.03
(iv) Cable m 15.00 2.99 11.00

(v) Road lighting columns, brackets and wall mountings, traffic signs, reflecting,
gates, stiles, street furniture, communications, cabinets, posts, brackets, signal
indicators, shelves, racking, frames, electronic units and the like. No 1,389.00 78.49 136.00

(vi) Chamber covers and frames, gully gratings and frames and the like No 2.00 166.73 435.00

(vii) Individual blocks, features or stones No 35.00 20.22 89.00

2200
Total carried forward to Bill (1)

VIII-7
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Bill (1): General


o - Humera - Lugdi Road Upgrading Project

Unit Rate Unit Rate Amount Amount Amount Amount Amount


Unit Rate (ETB)
(ETB) (ETB) (ETB) (ETB) (ETB) (ETB) (ETB)

IRCON CWE 4 For CGGC SUR_GITTO IRCON CWE 4 For

1,000,000.00 1,000,000.00 1,000,000.00 1,000,000.00 1,000,000.00 1,000,000.00 1,000,000.00

15% 100,000.00 410,000.00 150,000.00

1,100,000.00 1,410,000.00 1,150,000.00

84,556 30,635.94 640,026.00 507,336.00

78,952 30,635.94 584,460.00 473,712.24

67,158 122,543.52 1,272,000.00 3,223,584.00

55,472 306,359.16 514,656.00 665,658.00

43,166 531,022.56 823,440.00 1,035,972.00

5,828 122,543.70 244,494.00 34,965.00

4058699.4
1,770,075.26 3,296,653.00 4,058,699.40
37800
153,179.64 1,186,812.00 1,360,800.00

3789697.74
3,063,591.79 1,037,448.00 3,789,697.74
31500
122,543.64 1,037,448.00 1,134,000.00

1424769.23
1,191,396.81 799,456.00 1,424,769.23
5040
122,543.64 795,420.00 181,440.00

1849341.31
1,838,155.07
15120
24,508.80 649,260.00 544,320.00

5134638.6
2,042,394.53
15120
24,508.80 952,452.00 544,320.00
VIII-8
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Unit Rate Unit Rate Amount Amount Amount Amount Amount


Unit Rate (ETB)
(ETB) (ETB) (ETB) (ETB) (ETB) (ETB) (ETB)

2686320 1,021,197.26 853,194.00 2,686,320.00


12600
24,508.80 307,152.00 453,600.00

1022112
255,299.32 545,717.00 1,022,112.00
7560
24,508.80 196,452.00 272,160.00

1022112 255,299.32 946,134.00 1,022,112.00


5040
24,508.80 340,596.00 181,440.00

1143828
3,594,614.37 4,531,545.00 3,431,484.00
23436

251,214.48 1,015,200.00 843,696.00


598500 4,408,168.17 5,967,213.00 4,189,500.00
54684

196,070.04 1,895,040.00 1,968,624.00


1.89

1.89

793800
340,399.09 991,754.00 793,800.00
13860
30,636.00 251,712.00 498,960.00
100000 100000 100000 100,000.00

100,000.00 100,000.00 100,000.00


20%

10,000.00 41,000.00 20,000.00


100000 100000 100000 100,000.00
100,000.00 100,000.00 100,000.00
20%
10,000.00 41,000.00 20,000.00

22,143,063.25 31,957,734.00 36,583,081.61

VIII-9
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Unit Rate Unit Rate Amount Amount Amount Amount Amount


Unit Rate (ETB)
(ETB) (ETB) (ETB) (ETB) (ETB) (ETB) (ETB)

63,000.00 1,633,915.20 7,917,000.00 7,560,000.00

31,500.00 214,451.28 573,912.00 1,134,000.00

1,848,366.48 8,490,912.00 8,694,000.00

5,418.00 2,276,420.66 2,542,424.63 1,287,610.46

434.70 15,966.00 63,300.00 65,205.00

630.00 5,588.00 28,150.00 31,500.00

2,297,974.66 2,633,874.63 1,384,315.46

110.89 1,822.04 492.31 1,819.74

110.89 87,649.81 22,559.01 89,341.74

2,520.00 18,390.57 3,452.47 310,722.32

3,150.00 50,873.72 9,846.98 1,107,785.38

37.80 91,750.80 168,015.00 92,043.00

50.40 50.00 120.00 504.00

18.90 819,600.00 232,000.00 756,000.00

31.50 44.85 165.00 472.50

63.00 109,022.61 188,904.00 87,507.00

63.00 333.46 870.00 126.00

18.90 707.70 3,115.00 661.50

1,180,245.56 629,539.77 2,446,983.18

VIII-10
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Bill (2): Drainage


Shire - Shiraro - Humera - Lugdi Road Upgrading Project

Reference
Description Unit Quantity Unit Rate (ETB) Unit Rate (ETB) Unit Rate (ETB) Unit Rate (ETB)
No.

SUR_GITTO IRCON CWE


CGGC

3100 Drains

Excavation for open drains


(a) Excavation in Normal material situated in the following depth ranges
below the surface level

(i) 0m up to 1.5m m3 64,734.91 35.56 26.00 29.80


31.01
(ii) Exceeding 1.5m and up to 3.0m m3 13,670.45 36.27 33.00 36.11

(iii) Extra above 3m m3 100.00 36.73 44.00 54.08

(b) Extra over 31.01 (a) for excavation in hard material irrespective of depth m3 57,610.96 81.14 180.00 31.50

Excavation for subsoil drainage systems in (a) Normal material

31.03
(i) 0m up to 1.5m m3 2,000.00 43.65 26.00 29.80

(b) Extra over sub-item 31.03 (a) for excavation in hard material irrespective
of
depth m3 600.00 81.14 180.00 31.50

31.04 Impermeable backfilling to subsoil drainage system m 3


300.00 9.41 65.00 53.55

31.05 Banks and dykes m 3


10,000.00 9.41 46.00 53.55

Natural permeable material in subsoil drainage system (crushed stone)


31.06

a) Crushed stone obtained from approved sources on the site (Table 3107/1) m3 600.00 209.43 254.00 223.83

Natural permeable material in subsoil drainage system (Sand)


31.07

Sand obtained from approved sources on the site (Table 3107/2) m3 400.00 135.96 201.00 188.86

31.09 Polythene sheeting 0.15 mm thick, or similar approval material for subsoil
drainage protection m2 2,600.00 60.56 8.60 63.00

31.10 Synthetic fiber / geotextile filter fabric (Table 3107/3) for subsoil drainage
protection m2 7,200.00 32.47 28.00 24.38

31.16, 31.19
Backfilling on the side and bottom of the drains (new and exisitng) m3 28,385.00 52.90 26.00 32.72

Excavation for the clearing of existing drainage systems

31.18
(a) Manholes and inlet and outlet structures m3 40.00 36.52 26.00 35.76

( c ) Masonry / concrete side drains m 3


660.00 39.05 26.00 35.76
3100 Total carried forward to Bill (2)

3200 Culverts and appurtenants structures

Excavation
a) Excavate Normal material within the following depth ranges below the
surface level

32.01 (i) 0m up to 1.5m m3 25,524.58 41.41 26.00 29.80

(ii) Exceeding 1.5m and up to 3.0m m3 16,594.84 41.99 33.00 36.11

(iii) Extra in increments of 1.5 m m 3


150.00 42.87 44.00 55.37
b) Extra over item 32.01 a) for excavation in hard material irrespective of
depth m 3
12,446.13 81.14 180.00 31.50

Backfilling

32.02
(a) Using the excavated material m3 7,367.50 9.41 26.00 32.72

(b) Using imported selected material m 3


22,102.50 86.71 92.00 53.55

Concrete pipe culvert

(a) Class A bedding


(i) 750 mm dia m 19.00 988.93 914.00 1,253.86

(ii)800 mm dia m 154.00 1,100.00 946.00 1,316.28

(iii) 900mm dia m 139.00 1,382.95 1,224.00 1,597.81

VIII-8
32.03
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Reference
Description Unit Quantity Unit Rate (ETB) Unit Rate (ETB) Unit Rate (ETB) Unit Rate (ETB)
No.

(iv) 1060mm dia m 316.00 1,855.72 1,519.00 1,958.15


32.03 (v) 1222mm dia m 315.00 2,499.36 2,013.00 2,515.22

(b) Class B bedding

(i) 750 mm dia m 54.00 1,178.83 839.00 1,260.42

(ii)800 mm dia m 431.00 1,315.71 858.00 1,316.28

(iii) 900mm dia m 388.00 1,655.21 1,108.00 1,597.81

(iv) 1060mm dia m 885.00 2,234.58 1,354.00 1,958.15

(v) 1222mm dia m 882.00 3,001.99 1,789.00 2,515.22

Extra over items 32.03 for constructing inclined concrete pipe culverts

(i) 750 mm dia m 30.00 990.80 941.00 125.39

32.06 (ii)800 mm dia m 30.00 1,101.82 974.00 131.63

(iii) 900mm dia m 27.00 1,385.26 1,261.00 159.78

(iv) 1060mm dia m 63.00 1,858.93 1,565.00 195.82

(v) 1222mm dia m 63.00 2,503.62 2,073.00 251.52

Cast in situ concrete and formwork:


(a) In class A bedding, screeds and encasing pipes including formwork class
32.07 20/20 concrete m3 162.60 1,286.38 1,376.00 2,490.64

( c) In inlet and outlet structures including formwork & Steel reinforcement,


but including class U2 surface finish, class 25/20 m3 205.20 1,910.32 1,449.00 3,934.94

32.08 Concrete backfill for culverts Class 20/20 concrete m3 45.00 1,337.13 1,100.00 2,093.91

32.10 b)High tensile steel ton 0.50 11,474.71 14,077.00 11,453.40

32.11 Dowels for joining old and new concrete (all dia. Steel reinf.) kg 1,000.00 11.47 24.40 63.00

Remove existing structures


32.12 (a) Plain concrete m3 5.00 692.15 103.00 50.40

(b) Reinforced Concrete m 3


12.00 736.98 174.00 63.00

Removing and relaying existing pipes

(a) Class A bedding

(i) 750 mm dia m 0.00 171.26 508.00

(ii) 900mm dia m 0.00 398.91 582.00

(iii) 1060mm dia m 25.00 556.49 700.00 979.08


32.13
(iv) 1222mm dia m 17.00 739.55 840.00 1,006.09

(b) Class B bedding

(i) 750 mm dia m 0.00 278.66 425.00

(ii) 900mm dia m 0.00 398.91 456.00

(iii) 1060mm dia m 13.00 556.49 518.00 783.26

(iv) 1222mm dia m 8.00 739.55 593.00 804.87

Removing and stacking existing prefabricated culverts

(i) 750 mm dia m 0.00 476.79 44.00


32.14 (ii) 900mm dia m 0.00 686.43 59.00

(iii) 1060mm dia m 12.00 952.17 73.00 252.00

(iv) 1222mm dia m 9.00 1,265.39 95.00 315.00

Service ducts
32.20
(a) Reinforced Concrete pipe 200 mm dia m 450.00 138.47 287.00 63.00

32.22 Reinforced Concrete 300 x 300 x 300 mm Chamber for ducts with reinforced
Concrete 100 mm thick covers with lifting hooks No 30.00 284.35 369.00 671.13
3200 Total carried forward to Bill (2)

3300 Kerbing, channeling, open chutes, down pipes, and concrete linings
for open drains

Kerbing and channeling combination

33.02 Precast Concrete (Class 25/20) as per drawing m3 12,260.00 283.63 171.00 516.00

VIII-9
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Reference
Description Unit Quantity Unit Rate (ETB) Unit Rate (ETB) Unit Rate (ETB) Unit Rate (ETB)
No.

Cast in situ concrete chutes

(a) Class 25/20 concrete m3 100.00 1,201.00 1,209.00 2,166.34

33.04 (b) Formwork class F2 surface finish m2 350.00 116.82 131.00 264.60

Concrete lining for open drains:


33.08 (a) Cast in situ concrete lining (Class 25/20) m3 4,140.35 1,571.49 1,209.00 2,215.85

(b) Class U2 surface finish m2 10,350.88 114.42 6.40 264.60

Formwork to cast in situ concrete lining for open drains (Class F2 Surface
Finish)
33.09
(a) To sides with formwork on internal face only m2 3,105.26 114.42 131.00 252.00

(c) To ends of slabs m 2


1,035.09 143.72 131.00 264.60
33.16a U-shaped masonry (1:3) drains in towns m3 16,632.00 515.43 710.00 781.89

33.16b C25/20 reinforced concrete foot path over drains including reinforcement
and formwork m3 3,750.00 2,383.55 1,949.00 3,528.00
3300 Total carried forward to Bill (2)

3400 Pitching, stonework and erosion protection

Stone pitching
34.01 (a) (i) Plain pitching-Method 1 m2 24,848.36 47.84 84.00 81.27

(b) Grouted stone pitching m2 134,511.46 124.76 133.00 346.26


Riprap

(a) Packed riprap (Table 3404/1 ) m3 246.82 117.89 163.00 151.20

34.02 (b) Dumped riprap (Table 3404/1) m3 155.47 110.58 154.00 170.10

Stone masonry walls


34.03
(b) Cement-mortared (1:3) stone walls m3 6,659.48 571.03 710.00 781.89

34.04 Concrete pitching

(a) cast in situ c25/20 m3 242.85 1,576.86 1,698.00 3,226.74

34.05
Concrete in edge beam / cutoff wall and foundation trenches

(ii)in situ cyclopean / plum concrete m3 73.80 1,588.93 983.00 2,003.55

34.06
Excavation for edge beam / cut off wall and foundation trenches

(a) In solid rock m3 10.00 217.25 180.00 315.00

(b) In all other classes of materials except solid rock m 3


222.08 118.80 66.00 252.00
Total carried forward to Bill (2)

VIII-10
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Bill (2): Drainage


ro - Humera - Lugdi Road Upgrading Project

Amount Amount Amount Amount Amount


Unit Rate (ETB)
(ETB) (ETB) (ETB) (ETB) (ETB)

4 For SUR_GITTO IRCON CWE 4 For


CGGC

2,301,973.47 1,683,107.71 1,929,100.38

495,827.15 451,124.78 493,639.88

3,673.00 4,400.00 5,408.00

4,674,553.29 10,369,972.80 1,814,745.24

87,300.00 52,000.00 59,600.00

48,684.00 108,000.00 18,900.00

2,823.00 19,500.00 16,065.00

94,100.00 460,000.00 535,500.00

125,658.00 152,400.00 134,298.00

54,384.00 80,400.00 75,544.00

157,456.00 22,360.00 163,800.00

233,784.00 201,600.00 175,536.00

1,501,566.50 738,010.00 928,757.20

1,460.80 1,040.00 1,430.40

25,773.00 17,160.00 23,601.60


9,809,016.21 14,361,075.30 6,375,925.69

1,056,972.86 663,639.08 760,632.48

696,817.33 547,629.72 599,239.67

6,430.50 6,600.00 8,305.50

1,009,878.99 2,240,303.40 392,053.10

69,328.18 191,555.00 241,064.60

1,916,507.78 2,033,430.00 1,183,588.88

18,789.67 17,366.00 23,823.34

169,400.00 145,684.00 202,707.12

192,230.05 170,136.00 222,095.59

VIII-11
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Amount Amount Amount Amount Amount


Unit Rate (ETB)
(ETB) (ETB) (ETB) (ETB) (ETB)

586,407.52 480,004.00 618,775.40

787,298.40 634,095.00 792,294.30

63,656.82 45,306.00 68,062.68

567,071.01 369,798.00 567,316.68

642,221.48 429,904.00 619,950.28

1,977,603.30 1,198,290.00 1,732,962.75

2,647,755.18 1,577,898.00 2,218,424.04

29,724.00 28,230.00 3,761.70

33,054.60 29,220.00 3,948.90

37,402.02 34,047.00 4,314.06

117,112.59 98,595.00 12,336.66

157,728.06 130,599.00 15,845.76

209,165.39 223,737.60 404,978.06

391,997.66 297,334.80 807,449.69

60,170.85 49,500.00 94,225.95

5,737.36 7,038.50 5,726.70

11,470.00 24,400.00 63,000.00

3,460.75 515.00 252.00

8,843.76 2,088.00 756.00

13,912.25 17,500.00 24,477.00

12,572.35 14,280.00 17,103.53

7,234.37 6,734.00 10,182.38

5,916.40 4,744.00 6,438.96

11,426.04 876.00 3,024.00

11,388.51 855.00 2,835.00

62,311.50 129,150.00 28,350.00

8,530.50 11,070.00 20,133.90

13,607,528.01 11,862,152.10 11,780,436.66

3,477,303.80 2,096,460.00 6,326,160.00

VIII-12
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Amount Amount Amount Amount Amount


Unit Rate (ETB)
(ETB) (ETB) (ETB) (ETB) (ETB)

120,100.00 120,900.00 216,634.00

40,887.00 45,850.00 92,610.00

6,506,518.62 5,005,683.15 9,174,394.55

1,184,347.12 66,245.60 2,738,841.53

355,304.14 406,789.39 782,526.15

148,762.78 135,596.46 273,884.15

8,572,631.76 11,808,720.00 13,004,394.48

8,938,312.50 7,308,750.00 13,230,000.00

29,344,167.71 26,994,994.60 45,839,444.86

1,188,745.55 2,087,262.26 2,019,426.23

16,781,649.21 17,890,023.60 46,575,936.63

29,097.61 40,231.66 37,319.18

17,191.87 23,942.38 26,445.45

3,802,764.29 4,728,232.57 5,206,982.77

382,940.45 412,359.30 783,613.81

117,263.03 72,545.40 147,861.99

0.00 0.00 0.00

2,172.50 1,800.00 3,150.00

26,382.51 14,656.95 55,962.90


22,348,207.02 25,271,054.12 54,856,698.96

VIII-13
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Bill (3): Earth wo


Shire - Shiraro - Humera

Reference
Description Unit Quantity Unit Rate (ETB)
No.

CGGC

Bill (3): Earth works and Pavement layers

4100 Preparation of road bed and protection of Earthworks

Removal of unsuitable material


(a) In layer thickness of 200mm or less

(i) Stable material m3 1,492.26 28.71


41.01 (ii) Unstable material m3 373.07 22.09
(b) In layer thickness exceeding 200mm
(i) Stable material m3 69,390.09 26.51
(ii) Unstable material m3 3,357.59 22.09
Road bed preparation and compaction of material
41.03
(b) Compaction to 93% of modified AASHTO density m3 26,250.00 8.38

In situ treatment of roadbed:


41.04 (a) in situ treatment by ripping m3 66,708.60 17.34
(b) in situ treatment by blasting m3 3,335.43 72.05

4100 Total carried forward to Bill (3)

4200 Road way and Borrow excavation

Cut and Borrow to fill

(a) Material in compacted layer thicknesses of 200mm and less


42.01
(i) Compacted to 90% of Modified AASHTO density m3 74,613.00 42.67
(ii) Compacted to 93% of Modified AASHTO density m3 1,114,705.18 43.76
(f) Sand filter blanket m3 2,500.00 148.68

Cut to spoil
42.03 (a) Normal excavation m3 103,403.96 16.04
(b) Intermediate excavation m3 43,084.98 53.45
( c ) Hard excavation m3 25,850.99 70.11

4200 Total carried forward to Bill (3)

4405 Construction of subgrade


(a) (i) Construction of lower layer subgrade Compacted to 95% of
44.05
Modified AASHTO density m3 300,665.93 30.42
(b) (i) Construction of Upper layer subgrade with existing road
material of 150mm thick on existing road portion,Compacted to
95% of Modified AASHTO density m3 300,772.85 17.70
(b)(ii) Construction of Upper layer subgrade with borrow material
of 150mm thick on widening road portion,Compacted to 95% of
Modified AASHTO density m3 133,919.85 42.67

4400 Total carried forward to Bill (3)

5100 Sub bases

Sub base layers constructed from gravel or crushed stone

(a) Gravel sub base in lower subbase layer (unstabilized gravel)


compacted to:

(ii) 97% of Modified AASHTO density-150mm thick m3 283,919.25 43.09

(c) Crushed stone sub-base as filter layer ( Upper subbase layer)


51.01 compacted to 97% of modified AASHTO density m3 245,551.88 211.14
5100 Total carried forward to Bill (3)

VIII-12
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Reference
Description Unit Quantity Unit Rate (ETB)
No.

VIII-13
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Reference
Description Unit Quantity Unit Rate (ETB)
No.

5200 Road Bases

Base layer construction


52.01
(b) Crushed-stone base compacted to

(ii) 88 % Apparent relative density - 150 mm thick m3 213,414.30 209.43


5200 Total carried forward to Bill (3)

5400
Gravel wearing course and gravel shoulders

54.01 Gravel wearing course and gravel shoulders constructed from


gravel taken from cut or borrow
(b) Gravel shoulder wearing course compacted to 95% of
modified AASHTO density m3 107,864.88 63.40

Mechanical modification (extra over untreated layer)


46.03
(a) By adding a soil binder m3 5,400.00 100.88
5400 Total carried forward to Bill (3)

VIII-14
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Bill (3): Earth works and Pavement layers


Shire - Shiraro - Humera - Lugdi Road Upgrading Project

Amount Amount Amount Amount


Unit Rate (ETB) Unit Rate (ETB) Unit Rate (ETB) Unit Rate (ETB)
(ETB) (ETB) (ETB) (ETB)

SUR_GITTO IRCON CWE 4 FOR CGGC SUR_GITTO IRCON CWE

48.00 33.21 42,842.78 71,628.48 49,557.95


56.00 34.79 8,241.01 20,891.64 12,978.93

0.00 0.00 0.00


41.00 32.26 1,839,531.29 2,844,993.69 2,238,524.30
45.00 34.79 74,169.05 151,091.33 116,810.38

52.00 31.63 219,975.00 1,365,000.00 830,287.50

0.00 0.00 0.00


52.00 63.00 1,156,727.12 3,468,847.20 4,202,641.80
100.00 252.00 240,317.73 333,543.00 840,528.36

3,581,803.98 8,255,995.34 8,291,329.23

68.00 52.29 3,183,736.71 5,073,684.00 3,901,513.77


68.00 53.55 48,779,498.68 75,799,952.24 59,692,462.39
201.00 163.80 371,700.00 502,500.00 409,500.00

44.00 31.63 1,658,599.45 4,549,774.05 3,270,667.12


52.00 37.95 2,302,892.26 2,240,419.04 1,635,075.05
121.00 189.00 1,812,412.83 3,127,969.66 4,885,836.90

58,108,839.93 91,294,298.98 73,795,055.22

56.00 70.73 9,146,257.44 16,837,291.80 21,266,100.88

56.00 34.65 5,323,679.45 16,843,279.60 10,421,779.25

65.00 53.55 5,714,360.00 8,704,790.25 7,171,407.97

20,184,296.88 42,385,361.65 38,859,288.10

103.00 80.33 12,234,080.48 29,243,682.75 22,807,233.35

190.00 144.90 51,845,822.89 46,654,856.25 35,580,466.69

VIII-15
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Amount Amount Amount Amount


Unit Rate (ETB) Unit Rate (ETB) Unit Rate (ETB) Unit Rate (ETB)
(ETB) (ETB) (ETB) (ETB)

64,079,903.37 75,898,539.00 58,387,700.04

VIII-16
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Amount Amount Amount Amount


Unit Rate (ETB) Unit Rate (ETB) Unit Rate (ETB) Unit Rate (ETB)
(ETB) (ETB) (ETB) (ETB)

255.00 278.66 44,695,356.85 54,420,646.50 59,470,028.84

44,695,356.85 54,420,646.50 59,470,028.84

103.00 144.90 6,838,633.39 11,110,082.64 15,629,621.11

111.00 144.90 544,752.00 599,400.00 782,460.00

7,383,385.39 11,709,482.64 16,412,081.11

VIII-17
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Amount
(ETB)

4 FOR

VIII-18
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Amount
(ETB)

VIII-19
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Amount
(ETB)

VIII-20
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Bill (4): Asp


Shire - Shiraro - Humer

Reference
Description Unit Quantity Unit Rate (ETB) Unit Rate (ETB)
No.

CGGC SUR-GITTO

Bill (4): Asphalt pavements and seals

6100 Prime coat

61.01 (a) MC-30 cut-back bitumen liter 1,202,720.00 12.18 10.00

6100
Total carried forward to Bill (4)

6400 Bituminous road bases and surfacing


64.02 Asphalt surfacing, 5 cm thick, using 80/100 bitumen

(a) Continuously graded (Table 6400/8, coarse graded) m2 1,202,720.00 127.50 10.00

6400 Total carried forward to Bill (4)

VIII-14
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Bill (4): Asphalt pavements and seals


Shiraro - Humera - Lugdi Road Upgrading Project

Amount Amount Amount Amount


Unit Rate (ETB) Unit Rate (ETB) Unit Rate (ETB)
(ETB) (ETB) (ETB) (ETB)

IRCON CWE 4 FOR CGGC SUR-GITTO IRCON CWE

15.15 14,649,129.60 12,027,200.00 18,221,208.00

14,649,129.60 12,027,200.00 18,221,208.00

97.01 153,346,800.00 12,027,200.00 116,675,867.20

153,346,800.00 12,027,200.00 116,675,867.20

VIII-14
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Amount
(ETB)

4 FOR

VIII-14
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Bill (5): Ancillary Road


Shire - Shiraro - Humera - Lugdi Ro

Reference
Description Unit Quantity Unit Rate (ETB) Unit Rate (ETB)
No.

Bill (5): Ancillary Road Works


CGGC SUR_GITTO

9000 Ancillary Works

9100 Gabions

Foundation trench excavation and backfilling

91.01 (a) In solid rock m3 492.94 118.18 180.00

(b) In all other class of material except solid rock m3 2,240.64 55.51 66.00

(a) Galvanized Gabion boxes 1 m x 1 m as per Table 9103-1, mesh size as per
Table 9102- 3 as per the drawing m3 2,316.80 570.21 535.00

(b) Galvanized Gabion mattresses (0.3m depth, Table 9103-1, mesh size as
per Table 9102- 3) as per the drawing m3 100.00 598.72 730.00
91.03
(c) PVC-coated Gabion boxes 1 m x 1 m and Table 9103-1, mesh size as per
Table 9102- 3 as per the drawing m3 860.00 597.00 454.00

(d) PVC-coated Gabion mattresses (0.3m depth, Table 9103-1, mesh size as
per Table 9102- 3) as per the drawing m3 900.00 626.85 1,326.00

91.04 Filter fabric (Table 9102-4) m2 12,929.81 32.47 28.00


9100 Total carried forward to Bill (5)

9200 Delineators, Markers and Kilometer posts


92.01 (a) Delineators (fiberglass reinforced) No 577.00 643.76 78.00

(b) Markers (fiberglass reinforced) No 577.00 792.48 65.00

( c) Kilometer posts (reinforced concrete) No 156.00 270.15 36.00

(d) Guide posts (reinforced concrete)-New No 443.00 250.55 183.00

(d) Guide posts (reinforced concrete)-Existing reuse No 1,771.00 83.42 133.00


9200 Total carried forward to Bill (5)
9300 Guard rails
93.01 Guard rails on steel posts galvanized m 3,342.01 233.12 716.00
9300 Total carried forward to Bill (5)
9400 Road signs

94.01 Road signs with sign supports and concreting in the footing with excavation
and backfilling all complete 23

(a) Area not exceeding 2 sqm-New m 2


20.00 744.26 2,505.00

(a) Area not exceeding 2 sqm-Existing reuse m2 80.00 476.87 489.00

(b) Area exceeding 2 sqm but not 10 sqm m2 20.00 669.83 2,718.00
9400 Total carried forward to Bill (5)
95.01 Retro-reflective thermoplastic paint

VIII-15
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Reference
Description Unit Quantity Unit Rate (ETB) Unit Rate (ETB)
No.

a) Centerline marking

(i) 100 mm wide continuous white line km 52.00 6,881.08 2,984.00

(ii) 100 mm wide broken white line (3 meters painting with 9m gaps) km 156.00 7,225.14 1,524.00

b) Edge marking with 100mm wide broken yellow line (1 meter painting
with 1meter gap) km 156.00 3,784.60 2,152.00

( c) Lettering,symbols,traverse lines, painted islands and arrested markings


(white or yellow color as desired by the Engineer) m2 300.00 85.54 177.00
95.02 Variation in rate of application

(a) white thermoplastic paint liter 500.00 114.05 59.00

(b) Yellow thermoplastic paint liter 500.00 114.05 36.00

( c) glass / retro-reflective beads kg 250.00 114.05 96.00

Planting of Trees (Neem tree(Azadirachta indica)) Bosellia papyrifera,Acacia


95.03b seyal and/or other approved local trees) by the road side in 0.60 m dia holes, 1
m deep dug in the ground, mixing the soil with decayed farm yard/sludge
manure, planting the saplings, backfilling the trench, watering, fixing the tree
guardfixing the tree guard and maintaining the plant for one year, all complete No 31,200.00 238.52 163.00

9500
Total carried forward to Bill (5)

9600
Landscape and Grassing

96.03a Grassing includes preparation of grassing area with top soiling, stockpiling of
top soil, and providing and applying chemical fertilizers, seeding, and planting
the grass cutting, all complete ha 77.82 117,508.40 12,372.00

9600 Total carried forward to Bill (5)

VIII-16
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

l (5): Ancillary Road Works


Humera - Lugdi Road Upgrading Project

Unit Rate Amount Amount Amount Amount Amount


Unit Rate (ETB) Unit Rate (ETB)
(ETB) (ETB) (ETB) (ETB) (ETB) (ETB)

IRCON CWE 4 For CGGC SUR_GITTO IRCON CWE 4 For

220.50 58,255.74 88,729.34 108,693.45

63.00 124,377.93 147,882.24 141,160.32

669.05 1,321,062.53 1,239,488.00 1,550,055.04

695.85 59,872.00 73,000.00 69,585.00

695.85 513,420.00 390,440.00 598,431.00

695.85 564,165.00 1,193,400.00 626,265.00

96.00 419,830.88 362,034.64 1,241,261.61

3,060,984.08 3,494,974.22 4,335,451.41

959.99 371,449.52 45,006.00 553,914.23

840.00 457,260.96 37,505.00 484,680.00

387.77 42,143.40 5,616.00 60,492.12

387.77 110,993.65 81,069.00 171,782.11

116.33 147,736.82 235,543.00 206,020.43

1,129,584.35 404,739.00 1,476,888.89

446.04 779,090.19 2,392,881.67 1,490,671.70

779,090.19 2,392,881.67 1,490,671.70

0.00

2,520.00 14,885.20 50,100.00 50,400.00

1,260.00 38,149.60 39,120.00 100,800.00

5,040.00 13,396.60 54,360.00 100,800.00

66,431.40 143,580.00 252,000.00

VIII-17
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Unit Rate Amount Amount Amount Amount Amount


Unit Rate (ETB) Unit Rate (ETB)
(ETB) (ETB) (ETB) (ETB) (ETB) (ETB)

11,606.91 357,816.16 155,168.00 603,559.32

4,913.75 1,127,121.84 237,744.00 766,545.00

7,272.54 590,397.60 335,712.00 1,134,516.24

189.00 25,662.00 53,100.00 56,700.00

15.75 57,025.00 29,500.00 7,875.00

16.23 57,025.00 18,000.00 8,115.00

16.38 28,512.50 24,000.00 4,095.00

31.50 7,441,824.00 5,085,600.00 982,800.00

9,685,384.10 5,938,824.00 3,564,205.56

15,000.00 9,143,935.61 962,729.23 1,167,227.48

9,143,935.61 962,729.23 1,167,227.48

VIII-18
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Bill (6)
Shire - Shiraro - Humera -

Reference
Description Unit Quantity Unit Rate (ETB) Unit Rate (ETB)
No.

Bill (6): Structures CGGC SUR_GITTO

8000 Structures

8100 Foundations for structures

Excavation:

(a) Excavating material within the following successive depth


ranges

(i) 0m up to 2.0m m3 10,421.58 50.67 26.00


81.02
(ii) Exceeding 2.0m and up to 4.0m m3 12,937.85 55.51 33.00

(iii) Extra in increments of 1 m depth m 3


125.00 60.35 44.00

(b) Extra over item 81.02 (a) for hard excavation irrespective of
depth m3 3,161.29 118.18 180.00

Backfill to excavations utilizing:


81.05 (a) Material from the excavation m3 1,750.98 8.38 26.00

(b) Imported material m3 4,085.62 31.58 92.00

8100 Total carried forward to Bill (6)

8200 False work, formwork and concrete finish

82.01 (a) Formwork working to provide Class F1 surface finish m2 3,942.24 111.26 93.00

(b) Formwork working to provide Class F2 surface finish m2 985.56 116.82 131.00
8200 Total carried forward to Bill (6)

8300 Steel reinforcement for structures

83.01 Steel reinforcement in vertical, horizontal and arched sections

(b) High-yield stress steel ton 278.00 11,474.71 14,077.00

(c) Welded steel fabric kg 20.00 16.07 17.70

8300 Total carried forward to Bill (6)

8400 Concrete for structures

84.01 (a) Class 20/20 concrete m3 997.65 1,532.31 1,100.00

(b) Class 25/20 cast in situ concrete in walls, columns and slabs m3 1,814.80 1,726.19 1,170.00

84.05 Demolish existing concrete

(a) Plain concrete m3 21.40 339.02 103.00

(b) Reinforced concrete m3 85.59 401.79 174.00

VIII-17
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Reference
Description Unit Quantity Unit Rate (ETB) Unit Rate (ETB)
No.

8400 Total carried forward to Bill (6)

8900 Stone masonry structures

89.01 Class B cement-mortared (1:3) stone masonry m3 12,116.41 607.17 710.00

89.02 Pointing of culverts m2 124.00 212.50 14.00

89.03 (i) Demolish existing stone masonry, stack for re-use m3 122.40 62.79 87.00

(ii) Demolish existing stone masonry and stack for disposal m3 367.21 156.12 87.00

8900 Total carried forward to Bill (6)

VIII-18
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Bill (6): Structures


aro - Humera - Lugdi Road Upgrading Project

Amount Amount Amount Amount Amount


Unit Rate (ETB) Unit Rate (ETB) Unit Rate (ETB)
(ETB) (ETB) (ETB) (ETB) (ETB)

IRCON CWE 4 FOR CGGC SUR_GITTO IRCON CWE 4 FOR

32.78 528,061.24 270,960.97 341,619.25

39.72 718,180.06 426,949.06 513,891.41

54.08 7,543.75 5,500.00 6,760.00

34.65 373,601.00 569,031.81 109,538.62

32.72 14,673.22 45,525.52 57,292.11

53.55 129,023.99 375,877.36 218,785.14

1,771,083.27 1,693,844.71 1,247,886.53

277.20 438,613.62 366,628.32 1,092,788.93

264.60 115,133.12 129,108.36 260,779.18


553,746.74 495,736.68 1,353,568.10

11,200.60 3,189,969.38 3,913,406.00 3,113,766.80

22.40 321.40 354.00 448.00

3,190,290.78 3,913,760.00 3,114,214.80

2,135.15 1,528,709.07 1,097,415.00 2,130,132.40

4,948.39 3,132,689.61 2,123,316.00 8,980,338.17

63.00 7,254.01 2,203.89 1,348.01

94.50 34,388.41 14,892.32 8,088.07

VIII-19
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Amount Amount Amount Amount Amount


Unit Rate (ETB) Unit Rate (ETB) Unit Rate (ETB)
(ETB) (ETB) (ETB) (ETB) (ETB)

4,703,041.11 3,237,827.21 11,119,906.65

781.89 7,356,721.45 8,602,652.03 9,473,700.84

9.64 26,350.00 1,736.00 1,195.36

50.40 7,685.66 10,649.03 6,169.09

63.00 57,328.51 31,947.09 23,134.10

7,448,085.62 8,646,984.15 9,504,199.39

VIII-20
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire - Adigoshu (0-156 km)

Bill (7): B
Shire - Shiraro - Humera - Lugd

Reference
Description Unit Quantity Unit Rate (ETB) Unit Rate (ETB)
No.

Bill (7): Bridges

CGGC SUR-GITTO

BRIDGES

89.01 Class A cement mortared (1:2) masonry

(a) Rebuilding of cracked walls/New walls m3 79.20 714.32 806.00

Formwork vertical / horizontal / inclined to provide Class F3


82.01 surface finish

(i) New curb/sidewalks and RC rails m2 23.55 284.22 150.00

87.07 Cast in situ concrete :

(a) Class 30/20 in new curb/sidewalks and RC rails m3 1.66 1,754.34 1,404.00

84.04 Epoxy bonding of new concrete surfaces to old m2 1.20 888.82 266.00

84.05 (b) Demolish existing concrete in :

(i) Existing curb/sidewalks and RC rails up to face of beams to


expose the reinforcement. m3 1.66 495.94 174.00

87.13 Expansion joints

(a) Abutment end as per drawing m 208.30 491.03 10,378.00

(b) Pier joints as per drawing m 74.65 465.55 10,378.00

Sealing joints with:

87.16 (a) Sealant (Bostik DS-100 or similar) on curbs and sidewalks m 14.00 38.65 80.00

Surfacing on bridge deck (Asphalt surfacing, 5 cm thick, using


67.01 80/100 bitumen) m2 3,452.61 157.82 107.00

62.01 Tack coat of 30 % stable-grade emulsion liter 735.82 17.95 13.50

89.02 Pointing of Bridges m 2


70.00 212.50 14.00

97.02 Protective system to steel work (Tekez Bridge) including


preparation as per 97.01, all complete

(b) Protective system to the existing steel work m2 3,360.00 24.45 226.00

Total carried forward to Bill (7)

VIII-19
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire - Adigoshu (0-156 km)

Bill (7): Bridges


aro - Humera - Lugdi Road Upgrading Project

Amount Amount Amount Amount Amount


Unit Rate (ETB) Unit Rate (ETB) Unit Rate (ETB)
(ETB) (ETB) (ETB) (ETB) (ETB)

IRCON CWE 4 For CGGC SUR-GITTO IRCON CWE 4 For

899.18 56,574.14 63,835.20 71,215.06

252.00 6,693.38 3,532.50 5,934.60

2,386.56 2,903.43 2,323.62 3,949.76

126.00 1,066.58 319.20 151.20

63.00 820.78 287.97 104.27

504.00 102,281.55 2,161,737.40 104,983.20

504.00 34,753.31 774,717.70 37,623.60

378.00 541.10 1,120.00 5,292.00

101.86 544,890.91 369,429.27 351,682.85

16.38 13,207.93 9,933.54 12,052.70

11.57 14,875.00 980.00 809.90

12.60 82,152.00 759,360.00 42,336.00

860,760.12 4,083,741.20 564,920.08

VIII-19
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Bill (8): Schedul


Shire - Shiraro - Humera - L

Reference
Description Unit Quantity Unit Rate (ETB) Unit Rate (ETB)
No.

Bill (8): Schedule of Day work rates CGGC SUR_GITTO

Day work Rates or Lab our

L.000

L001 Steel fixer hr 120.00 7.12 5.80

L002 Carpenter hr 150.00 7.12 6.40

L003 Const. Foreman hr 200.00 8.31 8.10

L004 Equip. operator hr 50.00 7.12 14.60

L005 Forman hr 200.00 8.31 8.10

L006 Helper hr 100.00 4.75 4.70

L007 Unskilled Lab our hr 500.00 4.75 2.00

L008 Skilled Lab our hr 100.00 7.12 6.40

L009 Lab our Foreman hr 120.00 8.31 4.70

L010 Mason Foreman hr 150.00 7.12 8.10

L011 Mason hr 100.00 7.12 6.40

L012 Powder Man hr 50.00 9.15 7.40

L013 Quarry Foreman hr 50.00 8.31 8.10

L014 Stationary Equipment operator hr 25.00 8.31 4.00

L015 Welder hr 25.00 7.12 8.40

L016 Driver of transport vehicle hr 150.00 7.12 4.00

L017 Painter hr 25.00 7.12 5.40

L018 Watchman hr 50.00 4.75 2.00

L019 Chainman and Laboratory Assistants hr 100.00 5.09 4.60

L020 Mechanic & Electrical hr 100.00 9.65 8.10

Sub-total

Allow ------- percent of sub-total for Contractor's overhead,


profit, etc

Total carried forward to Bill (8)

VIII-22
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Reference
Description Unit Quantity Unit Rate (ETB) Unit Rate (ETB)
No.

M.000 Day work Rates for Materials

M001 Cement kg 2,500.00 2.00 2.30

M002 19mm Aggregate for concrete m3 500.00 199.80 150.00

M003 Concrete sand m3 300.00 222.00 140.00

M004 Dressed masonry m3 250.00 577.20 650.00

M005 Hollow concrete building blocks No 2,000.00 5.55 8.00

M006 Plaster m2 40.00 16.65 45.00

M007 High tensile steel (All diameters) kg 2,500.00 8.88 13.50

M008 Mild steel (All diameters) kg 1,000.00 8.33 12.00

M009 Prime coat liter 1,500.00 10.21 6.10

M010 Bitumen : 80/100 liter 2,500.00 10.21 10.20

M011 Asphalt Mc-3000 liter 1,500.00 10.21 11.00

M012 19mm Aggregate for surfacing m3 30.00 199.80 150.00

M013 9.5mm Aggregate for surfacing m 3


15.00 210.90 150.00

M014 Eucal. Pole Each 2,000.00 0.00 28.00

M015 Form Work (horizontal/vertical/inclined) m2 300.00 111.00 95.00

M016 Lumber m 3
50.00 2,775.00 4,600.00

M017 Nails Assorted kg 75.00 13.32 12.50

M018 Paint Gallon 5.00 133.20 85.00

M019 Select material m3 500.00 108.78 65.00

M020 Epoxy mortar m2 120.00 555.00 189.00

Sub-total

Allow ------- percent of sub-total for Contractor's overhead,


profit, etc

Total carried forward to Bill (8)

VIII-23
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Reference
Description Unit Quantity Unit Rate (ETB) Unit Rate (ETB)
No.

P.000 Day work Rates for Constructional Plant

P001 Concrete vibrator hr 10.00 13.41 16.90

P002 Concrete mixer 14/10 hr 50.00 83.16 33.70

P003 Bitumen distributor hr 50.00 555.00 684.00

P004 Motorized grader-Cat 140G or equivalent hr 200.00 777.00 508.00

P005 Bull dozer - Cat D7 or equivalent hr 200.00 527.41 731.00

P006 Bull dozer - Cat D8 or equivalent hr 200.00 632.88 1,241.00

P007 Grid roller minimum mass 13.5 tons hr 50.00 591.43 388.00

P008 Pneumatic tried roller minimum mass 2 tons per wheel hr 50.00 87.69 451.00

P009 Steel flat wheel roller minimum mass 5 tons hr 50.00 59.47 353.00

P010 Water browser minimum capacity 6000 liters hr 50.00 166.50 212.00

P011 Agricultural tractor hr 35.00 22.09 141.00

P012 Compressor hr 50.00 96.68 366.00

P013 Jack hammer hr 50.00 12.19 18.60

P014 Dump truck 8m3 hr 75.00 140.06 269.00

P015 Dump truck 12m3 hr 75.00 191.32 296.00

P016 Truck with trailer (20 T) hr 50.00 209.43 305.00

P017 Wheel loader 2.50 Cu.m hr 50.00 666.00 325.00

P018 Backhoe excavator hr 50.00 555.00 189.00

P019 Crusher set 75 ton with generator hr 75.00 516.75 1,551.00

P020 Generator hr 75.00 191.25 81.00

P021 Mobile crane 40T hr 50.00 491.53 606.00

P022 Asphalt heater tank 6000 liter hr 30.00 117.66 155.00

P023 Wagon drill hr 50.00 334.02 705.00

NOTE: The contractor is to state the mass, KW or HP, capacity


and or model in pricing this schedule.

Total carried forward to Bill (8)

VIII-24
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Bill (8): Schedule of Day work rates


- Shiraro - Humera - Lugdi Road Upgrading Project

Amount Amount Amount Amount Amount


Unit Rate (ETB) Unit Rate (ETB) Unit Rate (ETB)
(ETB) (ETB) (ETB) (ETB) (ETB)

IRCON CWE 4 For CGGC SUR_GITTO IRCON CWE 4 For

8.82 854.40 696.00 1,058.40

8.82 1,068.00 960.00 1,323.00

10.08 1,662.00 1,620.00 2,016.00

12.60 356.00 730.00 630.00

12.60 1,662.00 1,620.00 2,520.00

2.52 475.00 470.00 252.00

1.89 2,375.00 1,000.00 945.00

8.82 712.00 640.00 882.00

10.08 997.20 564.00 1,209.60

12.60 1,068.00 1,215.00 1,890.00

10.08 712.00 640.00 1,008.00

12.60 457.50 370.00 630.00

12.60 415.50 405.00 630.00

12.60 207.75 100.00 315.00

12.60 178.00 210.00 315.00

12.60 1,068.00 600.00 1,890.00

12.60 178.00 135.00 315.00

2.52 237.50 100.00 126.00

2.52 509.00 460.00 252.00

12.60 965.00 810.00 1,260.00

16,157.85 13,345.00 19,467.00

4,039.46 5,471.45

20,197.31 18,816.45 19,467.00

VIII-25
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Amount Amount Amount Amount Amount


Unit Rate (ETB) Unit Rate (ETB) Unit Rate (ETB)
(ETB) (ETB) (ETB) (ETB) (ETB)

2.08 5,000.00 5,750.00 5,200.00

157.50 99,900.00 75,000.00 78,750.00

88.20 66,600.00 42,000.00 26,460.00

327.60 144,300.00 162,500.00 81,900.00

6.30 11,100.00 16,000.00 12,600.00

126.00 666.00 1,800.00 5,040.00

14.32 22,200.00 33,750.00 35,800.00

12.89 8,330.00 12,000.00 12,890.00

3.58 15,315.00 9,150.00 5,370.00

3.58 25,525.00 25,500.00 8,950.00

9.95 15,315.00 16,500.00 14,925.00

157.50 5,994.00 4,500.00 4,725.00

157.50 3,163.50 2,250.00 2,362.50

63.00 0.00 56,000.00 126,000.00

289.80 33,300.00 28,500.00 86,940.00

630.00 138,750.00 230,000.00 31,500.00

25.20 999.00 937.50 1,890.00

189.00 666.00 425.00 945.00

189.00 54,390.00 32,500.00 94,500.00

126.00 66,600.00 22,680.00 15,120.00

718,113.50 777,742.50 651,867.50

179,528.38 318,874.43

897,641.88 1,096,616.93 651,867.50

VIII-26
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

Amount Amount Amount Amount Amount


Unit Rate (ETB) Unit Rate (ETB) Unit Rate (ETB)
(ETB) (ETB) (ETB) (ETB) (ETB)

18.90 134.10 169.00 189.00

31.50 4,158.00 1,685.00 1,575.00

176.40 27,750.00 34,200.00 8,820.00

976.50 155,400.00 101,600.00 195,300.00

819.00 105,482.00 146,200.00 163,800.00

945.00 126,576.00 248,200.00 189,000.00

693.00 29,571.50 19,400.00 34,650.00

819.00 4,384.50 22,550.00 40,950.00

441.00 2,973.50 17,650.00 22,050.00

97.65 8,325.00 10,600.00 4,882.50

157.50 773.15 4,935.00 5,512.50

157.50 4,834.00 18,300.00 7,875.00

126.00 609.50 930.00 6,300.00

189.00 10,504.50 20,175.00 14,175.00

189.00 14,349.00 22,200.00 14,175.00

315.00 10,471.50 15,250.00 15,750.00

756.00 33,300.00 16,250.00 37,800.00

819.00 27,750.00 9,450.00 40,950.00

1,260.00 38,756.25 116,325.00 94,500.00

126.00 14,343.75 6,075.00 9,450.00

1,260.00 24,576.50 30,300.00 63,000.00

630.00 3,529.80 4,650.00 18,900.00

1,197.00 16,701.00 35,250.00 59,850.00

1,583,092.74

665,253.55 902,344.00 1,049,454.00

VIII-27
Ethiopian Roads Authority
Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project
Section VIII : Bill of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)

D. Summary of Specified Provisional Sums

Item Amount
Bill No. Description
No. (ETB)

1
(a) General STD and HIV/AIDS alleviation measures by
1216 a nominated sub contractor 1,000,000.00

12(l) Additional office and laboratory equipment ordered by the Engineer 100,000.00

1
12(n) Laboratory testing (additional testing) to be carried out at external (commercial) laboratory 100,000.00

Total for specified provisional sums 1,200,000.00

Carried forward to Grand summary 1,200,000.00

VIII-25
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot -1 Shire-Adigoshu (0-156 km)

E. Summary of Bills

Contract Name: S-S-H-L Road

Contract Lot: Lot 1

Bill Nos Section Description Amount ETB

1200 General Requirements and Provisions

Accommodation, Services, and Attendance for the


1400 Engineer's Staff
Bill No. 1
1500 Traffic Management

2100 Clearing and Grubbing


Demolition, removal, disposal or storage of existing
2200 structures and installations

Total Bill No. 1. Carried forward to grand summary

3100 Drains

3200 Culverts and appurtenants structures


Bill No. 2
Kerbing, channeling, open chutes, down pipes, and concrete linings for
3300 open drains

3400 Pitching, stonework and erosion protection


Total Bill No. 2. Carried forward to grand summary

4100 Preparation of road bed and protection of earthwork

4200 Road way and Borrow excavation


Bill No. 3 5100 Sub bases

5200 Road Bases

5400 Gravel wearing course and gravel shoulders


Total Bill No. 3. Carried forward to grand summary

6100 Prime coat


Bill No. 4
6400 Bituminous surfacing
Total Bill No. 4. Carried forward to grand summary

9100 Gabions

9200 Delineators, Markers and Kilometer posts

9300 Guard rails


Bill No. 5
9400 Road signs

9500 Road traffic markings and road studs

9600 Landscape Grassing and Planting of trees


Total Bill No. 5. Carried forward to grand summary

8100 Foundations for Structures

8200 False work, formwork and concrete finish


Bill No. 6 8300 Steel reinforcement for structures

8400 Concrete for structures

8900 Stone masonry structues

Total Bill No. 6. Carried forward to grand summary

Bill No. 7 Bridges

Total Bill No. 7. Carried forward to grand summary

Bill No. 8 Daywork rates

Total Bill No. 8. Carried forward to grand summary

VIII-26
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot -1 Adigoshu-Lugdi (0-156 km)

F. Grand Summary

Contract Name: S-S-H-L Road


Contract Lot: Lot 1

Bill Nos Description Amount ETB

1 General Provisions

2 Drainage

3 Earth works and pavement layers

4 Asphalt pavements and seals

5 Ancillary Road Works

6 Structures

7 Bridges

8 Daywork rates

(A) Sub-Totals of Bills

(B) Specified Provisional Sums included in Sub-totals of Bills (ETB)

(C) Total of Bills less Specified Provisional Sums (A-B)

(D) Add Provisional sum for Contingency Allowance (C x 0.15)

(E) VAT 15 % of (A+D)

Bid price (A+D+E)


(F) (Total carried over to form of bid)