Professional Documents
Culture Documents
September 2006 Final LOT 1 BOQ Shire
September 2006 Final LOT 1 BOQ Shire
Bill (1):
Shire - Shiraro - Humera - Lu
Referen
Unit Rate Unit Rate
ce Description Unit Quantity
(ETB) (ETB)
No.
CGGC SUR_GITTO
Provisional
(a) General STD and HIV/AIDS alleviation measures Sum 1.00 1,000,000.00 1,000,000.00
(i) Office fully fitted, furnished and equipped including all services month 6 5,105.99 106,671
(ii) Laboratory fully fitted, furnished and equipped including all services month 6 5,105.99 97,410
(iii) Housing Accommodation fully fitted, furnished and equipped including all
services No*month 48 2,553 26,500
(v) Surveying equipment (Total Station and Level with all accessories, labour,
assistances as order by the Engineer) month 6 20,424 40,749
(b)
Office building and equipment as specified including furniture (Appendix 1)
Lump sum 1 1770075.26 3296653
(i) Provide office building, equipment and furnishings
month 36 4254.99 32967
(ii) Maintenance of office and office equipment
(c) Laboratory building and equipment complete as specified including furniture and
fittings (Appendix 1)
Lump sum 1 3063591.79 1037448
(i) Provide laboratory building, equipment and furnishings
month 36 3403.99 28818
(ii) Maintenance of laboratory building and laboratory equipment
(d)
Survey equipment for the Engineer
Lump sum 1 1191396.81 799456
(i) Provide survey equipment as per Appendix 1, A.5
month 36 3403.99 22095
(ii) Maintain survey equipment
(e)
House Type A complete as specified including fixtures and hard furnishings
Lump sum 1 1838155.07 1803586
(i) Provide Type A housingings
month 36 680.8 18035
(ii) Maintenance of Type A houses
(f)
House Type B complete as specified including fixtures and hard furnishings
Lump sum 1 2042394.53 2645665
(i) Provide Type B housingings
month 36 680.8 26457
(ii) Maintenance of Type B houses
VIII-5
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
Referen
Unit Rate Unit Rate
ce Description Unit Quantity
(ETB) (ETB)
No.
(g) House Type C (Dormitory Building) complete as specified including fixtures and
hard furnishings
(h) House Type D (Kitchen and Mess Building) complete as specified including
fixtures and hard furnishings
(i) Provide Type D housing Lump sum 1 255299.32 545717
(i) House Type E (Service Quarters) complete as specified including fixtures and
hard furnishings
(i) Provide Type E housing Lump sum 1 255299.32 946134
(ii) Maintenance of Type E houses month 36 680.8 9461
(ii) Provision of driver, fuel and lubricants and the servicing, maintenance, month 36 6978.18 28200
insurance and repair of vehicle Type A for the Engineer and his staff based on
an average 4000km/month/vehicel
(v) Addition to or deduction from Item 14.01(j)(ii) for additional/reduced vehicle Kilometre rate only 7.52 7
Type A usage
(vi) Addition to or deduction from Item 14.01(j)(iv) for additional/reduced vehicle Kilometre rate only 6.3 13
Type B usage
(i) Provide and install radio system as specified Lump sum 1 340399.09 991754
(l) Additional office and laboratory equipment ordered by the Engineer Prov Sum 1 100000 100000
(m) Allow % on-cost to invoiced amounts for equipment supplied under item 14.01(l) % 100000 10% 41%
(n) Laboratory testing (additional testing) to be carried out at external (commercial) Prov Sum 1 100000 100000
laboratory
(o) Allow % on-cost to invoiced amounts for additional testing under item 14.01(n) % 100000 10% 41%
VIII-6
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
Referen
Unit Rate Unit Rate
ce Description Unit Quantity
(ETB) (ETB)
No.
(a) Pipes with an internal diameter up to and including 750mm m3 16.41 111.03 30.00
22.02 (b) Pipes with an internal diameter exceeding 750mm m3 805.68 108.79 28.00
(c ) Box and slab culverts up to and including 1.50m vertical dimension m3 123.30 149.15 28.00
(d) Box and slab culverts exceeding 1.50m vertical dimension m3 351.68 144.66 28.00
Take up or down and set aside for reuse or remove to store off site the following
(ii) paved areas and the like, Pitching work etc. m2 10.00 5.00 12.00
(iii) curbs, channels, edgings, combined drainage, and curb blocks, fencing,
safety fences, coping, string courses and the like m 40,000.00 20.49 5.80
22.03
(iv) Cable m 15.00 2.99 11.00
(v) Road lighting columns, brackets and wall mountings, traffic signs, reflecting,
gates, stiles, street furniture, communications, cabinets, posts, brackets, signal
indicators, shelves, racking, frames, electronic units and the like. No 1,389.00 78.49 136.00
(vi) Chamber covers and frames, gully gratings and frames and the like No 2.00 166.73 435.00
2200
Total carried forward to Bill (1)
VIII-7
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
4058699.4
1,770,075.26 3,296,653.00 4,058,699.40
37800
153,179.64 1,186,812.00 1,360,800.00
3789697.74
3,063,591.79 1,037,448.00 3,789,697.74
31500
122,543.64 1,037,448.00 1,134,000.00
1424769.23
1,191,396.81 799,456.00 1,424,769.23
5040
122,543.64 795,420.00 181,440.00
1849341.31
1,838,155.07
15120
24,508.80 649,260.00 544,320.00
5134638.6
2,042,394.53
15120
24,508.80 952,452.00 544,320.00
VIII-8
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
1022112
255,299.32 545,717.00 1,022,112.00
7560
24,508.80 196,452.00 272,160.00
1143828
3,594,614.37 4,531,545.00 3,431,484.00
23436
1.89
793800
340,399.09 991,754.00 793,800.00
13860
30,636.00 251,712.00 498,960.00
100000 100000 100000 100,000.00
VIII-9
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
VIII-10
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
Reference
Description Unit Quantity Unit Rate (ETB) Unit Rate (ETB) Unit Rate (ETB) Unit Rate (ETB)
No.
3100 Drains
(b) Extra over 31.01 (a) for excavation in hard material irrespective of depth m3 57,610.96 81.14 180.00 31.50
31.03
(i) 0m up to 1.5m m3 2,000.00 43.65 26.00 29.80
(b) Extra over sub-item 31.03 (a) for excavation in hard material irrespective
of
depth m3 600.00 81.14 180.00 31.50
a) Crushed stone obtained from approved sources on the site (Table 3107/1) m3 600.00 209.43 254.00 223.83
Sand obtained from approved sources on the site (Table 3107/2) m3 400.00 135.96 201.00 188.86
31.09 Polythene sheeting 0.15 mm thick, or similar approval material for subsoil
drainage protection m2 2,600.00 60.56 8.60 63.00
31.10 Synthetic fiber / geotextile filter fabric (Table 3107/3) for subsoil drainage
protection m2 7,200.00 32.47 28.00 24.38
31.16, 31.19
Backfilling on the side and bottom of the drains (new and exisitng) m3 28,385.00 52.90 26.00 32.72
31.18
(a) Manholes and inlet and outlet structures m3 40.00 36.52 26.00 35.76
Excavation
a) Excavate Normal material within the following depth ranges below the
surface level
Backfilling
32.02
(a) Using the excavated material m3 7,367.50 9.41 26.00 32.72
VIII-8
32.03
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
Reference
Description Unit Quantity Unit Rate (ETB) Unit Rate (ETB) Unit Rate (ETB) Unit Rate (ETB)
No.
Extra over items 32.03 for constructing inclined concrete pipe culverts
32.08 Concrete backfill for culverts Class 20/20 concrete m3 45.00 1,337.13 1,100.00 2,093.91
32.11 Dowels for joining old and new concrete (all dia. Steel reinf.) kg 1,000.00 11.47 24.40 63.00
Service ducts
32.20
(a) Reinforced Concrete pipe 200 mm dia m 450.00 138.47 287.00 63.00
32.22 Reinforced Concrete 300 x 300 x 300 mm Chamber for ducts with reinforced
Concrete 100 mm thick covers with lifting hooks No 30.00 284.35 369.00 671.13
3200 Total carried forward to Bill (2)
3300 Kerbing, channeling, open chutes, down pipes, and concrete linings
for open drains
33.02 Precast Concrete (Class 25/20) as per drawing m3 12,260.00 283.63 171.00 516.00
VIII-9
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
Reference
Description Unit Quantity Unit Rate (ETB) Unit Rate (ETB) Unit Rate (ETB) Unit Rate (ETB)
No.
33.04 (b) Formwork class F2 surface finish m2 350.00 116.82 131.00 264.60
Formwork to cast in situ concrete lining for open drains (Class F2 Surface
Finish)
33.09
(a) To sides with formwork on internal face only m2 3,105.26 114.42 131.00 252.00
33.16b C25/20 reinforced concrete foot path over drains including reinforcement
and formwork m3 3,750.00 2,383.55 1,949.00 3,528.00
3300 Total carried forward to Bill (2)
Stone pitching
34.01 (a) (i) Plain pitching-Method 1 m2 24,848.36 47.84 84.00 81.27
34.02 (b) Dumped riprap (Table 3404/1) m3 155.47 110.58 154.00 170.10
34.05
Concrete in edge beam / cutoff wall and foundation trenches
34.06
Excavation for edge beam / cut off wall and foundation trenches
VIII-10
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
VIII-11
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
VIII-12
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
VIII-13
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
Reference
Description Unit Quantity Unit Rate (ETB)
No.
CGGC
Cut to spoil
42.03 (a) Normal excavation m3 103,403.96 16.04
(b) Intermediate excavation m3 43,084.98 53.45
( c ) Hard excavation m3 25,850.99 70.11
VIII-12
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
Reference
Description Unit Quantity Unit Rate (ETB)
No.
VIII-13
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
Reference
Description Unit Quantity Unit Rate (ETB)
No.
5400
Gravel wearing course and gravel shoulders
VIII-14
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
VIII-15
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
VIII-16
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
VIII-17
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
Amount
(ETB)
4 FOR
VIII-18
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
Amount
(ETB)
VIII-19
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
Amount
(ETB)
VIII-20
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
Reference
Description Unit Quantity Unit Rate (ETB) Unit Rate (ETB)
No.
CGGC SUR-GITTO
6100
Total carried forward to Bill (4)
(a) Continuously graded (Table 6400/8, coarse graded) m2 1,202,720.00 127.50 10.00
VIII-14
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
VIII-14
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
Amount
(ETB)
4 FOR
VIII-14
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
Reference
Description Unit Quantity Unit Rate (ETB) Unit Rate (ETB)
No.
9100 Gabions
(b) In all other class of material except solid rock m3 2,240.64 55.51 66.00
(a) Galvanized Gabion boxes 1 m x 1 m as per Table 9103-1, mesh size as per
Table 9102- 3 as per the drawing m3 2,316.80 570.21 535.00
(b) Galvanized Gabion mattresses (0.3m depth, Table 9103-1, mesh size as
per Table 9102- 3) as per the drawing m3 100.00 598.72 730.00
91.03
(c) PVC-coated Gabion boxes 1 m x 1 m and Table 9103-1, mesh size as per
Table 9102- 3 as per the drawing m3 860.00 597.00 454.00
(d) PVC-coated Gabion mattresses (0.3m depth, Table 9103-1, mesh size as
per Table 9102- 3) as per the drawing m3 900.00 626.85 1,326.00
94.01 Road signs with sign supports and concreting in the footing with excavation
and backfilling all complete 23
(b) Area exceeding 2 sqm but not 10 sqm m2 20.00 669.83 2,718.00
9400 Total carried forward to Bill (5)
95.01 Retro-reflective thermoplastic paint
VIII-15
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
Reference
Description Unit Quantity Unit Rate (ETB) Unit Rate (ETB)
No.
a) Centerline marking
(ii) 100 mm wide broken white line (3 meters painting with 9m gaps) km 156.00 7,225.14 1,524.00
b) Edge marking with 100mm wide broken yellow line (1 meter painting
with 1meter gap) km 156.00 3,784.60 2,152.00
9500
Total carried forward to Bill (5)
9600
Landscape and Grassing
96.03a Grassing includes preparation of grassing area with top soiling, stockpiling of
top soil, and providing and applying chemical fertilizers, seeding, and planting
the grass cutting, all complete ha 77.82 117,508.40 12,372.00
VIII-16
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
0.00
VIII-17
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
VIII-18
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
Bill (6)
Shire - Shiraro - Humera -
Reference
Description Unit Quantity Unit Rate (ETB) Unit Rate (ETB)
No.
8000 Structures
Excavation:
(b) Extra over item 81.02 (a) for hard excavation irrespective of
depth m3 3,161.29 118.18 180.00
82.01 (a) Formwork working to provide Class F1 surface finish m2 3,942.24 111.26 93.00
(b) Formwork working to provide Class F2 surface finish m2 985.56 116.82 131.00
8200 Total carried forward to Bill (6)
(b) Class 25/20 cast in situ concrete in walls, columns and slabs m3 1,814.80 1,726.19 1,170.00
VIII-17
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
Reference
Description Unit Quantity Unit Rate (ETB) Unit Rate (ETB)
No.
89.03 (i) Demolish existing stone masonry, stack for re-use m3 122.40 62.79 87.00
(ii) Demolish existing stone masonry and stack for disposal m3 367.21 156.12 87.00
VIII-18
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
VIII-19
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
VIII-20
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire - Adigoshu (0-156 km)
Bill (7): B
Shire - Shiraro - Humera - Lugd
Reference
Description Unit Quantity Unit Rate (ETB) Unit Rate (ETB)
No.
CGGC SUR-GITTO
BRIDGES
(a) Class 30/20 in new curb/sidewalks and RC rails m3 1.66 1,754.34 1,404.00
84.04 Epoxy bonding of new concrete surfaces to old m2 1.20 888.82 266.00
87.16 (a) Sealant (Bostik DS-100 or similar) on curbs and sidewalks m 14.00 38.65 80.00
(b) Protective system to the existing steel work m2 3,360.00 24.45 226.00
VIII-19
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire - Adigoshu (0-156 km)
VIII-19
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
Reference
Description Unit Quantity Unit Rate (ETB) Unit Rate (ETB)
No.
L.000
Sub-total
VIII-22
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
Reference
Description Unit Quantity Unit Rate (ETB) Unit Rate (ETB)
No.
M016 Lumber m 3
50.00 2,775.00 4,600.00
Sub-total
VIII-23
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
Reference
Description Unit Quantity Unit Rate (ETB) Unit Rate (ETB)
No.
P007 Grid roller minimum mass 13.5 tons hr 50.00 591.43 388.00
P008 Pneumatic tried roller minimum mass 2 tons per wheel hr 50.00 87.69 451.00
P009 Steel flat wheel roller minimum mass 5 tons hr 50.00 59.47 353.00
P010 Water browser minimum capacity 6000 liters hr 50.00 166.50 212.00
VIII-24
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
4,039.46 5,471.45
VIII-25
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
179,528.38 318,874.43
VIII-26
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
1,583,092.74
VIII-27
Ethiopian Roads Authority
Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project
Section VIII : Bill of Quantities
Lot - 1 Shire-Adigoshu (0-156 km)
Item Amount
Bill No. Description
No. (ETB)
1
(a) General STD and HIV/AIDS alleviation measures by
1216 a nominated sub contractor 1,000,000.00
12(l) Additional office and laboratory equipment ordered by the Engineer 100,000.00
1
12(n) Laboratory testing (additional testing) to be carried out at external (commercial) laboratory 100,000.00
VIII-25
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot -1 Shire-Adigoshu (0-156 km)
E. Summary of Bills
3100 Drains
9100 Gabions
VIII-26
Ethiopian Roads Authority Vol. III: Bid Document
Shire-Shiraro-Humera-Lugdi Road Upgradation Project Section VIII : Bill Of Quantities
Lot -1 Adigoshu-Lugdi (0-156 km)
F. Grand Summary
1 General Provisions
2 Drainage
6 Structures
7 Bridges
8 Daywork rates
VIII-27