Rainfall

$
+ Shutdown Guidelines

³ Operations must cease in this area when rainfall amounts reach the following levels.
Barkley Community Forest
PLA N N IN G D EPT . DATE

75mm during a single shift or 12 hour period. Harvest Plan Map


0 100mm of accumulated rainfall in a 24 hour period.
PR OD U C T ION DATE 1 04 50mm may be deducted per 24 hour period for drainage. Cutblock: SB9 Tenure: K3S
B
Take specific direction from the site supervisor for changing requirements. 92C.093 Hammer: K3S/005
Mapsheet:

DATE
1:5,000 Albers: 1038725 // 437188 Cutting Permit: 5
F &B D EPA R T M EN T
20m Contour Intervals

S3
!
( !
( Lat/Long: 48° 56' 59'' N 125° 28' 19'' W Revision Date: July 13, 2017
!
(
1 !
(
40

00

) !
(
37
2
MAP LEGEND B10 R2

R1
35 0+788 
)
0+808 !
(

R2

) !
( $
+

)
Harvest Activities 20
2
Falling Boundary 
) !
(
30 HC 3
Yarding Direction
34
!
(
31
R2 36 5% 
) S3
Hoe Chuck HC 
) !
< 
) !
(
41 4
!
(

S4
Grapple G ( 0+670
! 
) 37 R1

Heli 21 BM39B 0+348


H !
( !
(

R2

) 12

S3

-1
Heli Drop Zone 37

SB9
Split Line 33 ) $
 ( 5 0+193
! !
(
52 
) 0+424 + 0+233 
)  10+000
WTRA S !
 ( S
WTRA 
) 
) R
!
( 0+310
Focused Retention 0+525 !
( 
S 0+464 33A 
S ! FS
TLA TLA 0+543 !
( 0+493 ( 0+101 HC l ey
S3

Adjacent Blocks 51  HC 0+233 22


5% rk
50 ) !
(
32
!
( 
) Ba
Logged Blocks 5% 
) 
)
K3S

S3

) 0+608 
S 6
53 31A 30 !
( 
)
Road Features !
( $
+ 0+203 0+180 
)
Rock Quarry ô
Q !
(
35 
) !
(
34 S3
32A

)

)

) 7
005
Spoil Site 49
!
< !
(
30 9 !
( 0+000
!
< R1 
) 25
End Haul Section 
) 
)
!
(
35A 40 24
Hammer Mark

R1
!
(
38 
) 8
Deactivated 
) !
(
31 23
S4

Built Road
HC R1

Construction 48 5%
SB9-2

S3

) 0+076 Following the Plan
Reconstruction !
( 
S !
( SB9-3
0+161 !
(
Road R/W 0+731 0+172 STEP 1: Always read and understand your plans and maps.
Road Station 0+000 0+045 !
( STEP 2: Always match your plan and map to what you find on the ground.
) 41

S4

Culverts Stop and ask if what you find on the ground does not match the plan and map.

) STEP 3: Check that you can do the work
WBC 
S 47 
) Stop and ask if you cannot follow the plan and map
CMP !
( 46 STEP 4: Know your responsibilities. Ask if you are unsure.
Bridge 
S HC S3
Riparian Management 5% 42

) 
) Riparian Management Plan - SB9
Designated Stream Crossing !
< !
(
35
45
Fish Streams (S1-S4) !
(1 S2 Riparian Classification Phase Prescriptions
Non Fish streams (S5, S6) !
(2 S6 
) Debris Management Requirements
Non Classified Drainage
44  Stream - Reach FRPA Falling Yarding Loading
Gully )
FSZ Stream 43 Class RRZ RMZ Activity in RMZ

Reach Break/Fish Barrier +


$ 12, 30(R1),
Portions of RMZ inside block. Leave trees shoud be selected for windfirmness.
5m Machine Free Zone 31(R1),32(R1), 34, S3 20 20
Retain understory vegetation, saplings and non-merch along streams.
Away Away N/A N/A
Wetland 37(R1), 38, 40(R1), 41
RMA Portions of RMZ inside block. Leave trees shoud be selected for windfirmness.
30(R2), 37(R2) S4 0 30 Away Away N/A N/A
RRZ Retain understory vegetation, saplings and non-merch along streams.
Waterbody Leave trees shoud be selected for windfirmness. Retain understory vegetation,
Away
saplings and non-merch along streams. Leave pre-existing deadfall trees and large No limbing or bucking in streams. Hand
Other OPERATING AREA Salmon Beach METHOD HA VOLUME
31(R2) S4 0 30 Away (See Note Away
woody debris (See Note 1). Do not disturb stream banks. 5m machine free zone. clean introduced debris from streams.
Cruise Plot (Dropped) 1.)
!
B HOE CHUCK (5% RET) 24.8 0 Cross at designated crossing.
Cruise Plot (Measure/Count) !
. ! ENG GRAPPLE (% RET) 0
m³/ha Leave trees shoud be selected for windfirmness. Retain understory vegetation, Away
CMT Stump ! CRUISE HELI (% RET) 0 No limbing or bucking in streams. Hand
32(R2) S4 0 30 saplings and non-merch along streams. Leave pre-existing deadfall trees and large Away (See Note Away
Heli Pad clean introduced debris from streams.
Legal Line
!
( H HAUL UCLU BATO
13.8
HARVEST AREA 24.8 0 woody debris (See Note 1). Do not disturb stream banks. 5m machine free zone. 1.)
Km. 11.5 R/W REMOVED 1.8
Cruise Type Line SCALE: 1:5,000 TLA 0.0 Leave trees shoud be selected for windfirmness. Retain understory vegetation,
Away
Rock Bluff ROAD PERMIT R/W saplings and non-merch along streams. Leave pre-existing deadfall trees and large No limbing or bucking in streams. Hand
FIELD WORK COPPER 0.3 0 35, 35A S4 0 30 Away (See Note Away
woody debris (See Note 1). Do not disturb stream banks. 5m machine free zone. clean introduced debris from streams.
SU Type Line DATE April-17 DISPERSED RETENTION (5%) 24.8 0 1.)
Cross at designated crossings.
Trail CHECKED DRF
Wildlife Tree o DATE 2017 GROSS AREA 26.9 0
Note 1. Where felled trees bridge the stream, they may be yarded if they can be lifted vertically without disturbing the stream bank or channel.
Otherwise, leave bridged trees. Yarding approval required by RPF or RPBio.
Bear Den P
!