1. Surface/Wearing Course
2. Base Course
3. Sub Base
4. Sub Grade
The top layers of pavement which is in direct contact with the wheel of the vehicle. Usually
constructed of material in which bitumen is used as binder materials.
Consists of combination of mineral aggregate with bituminous binder ranging from inexpensive
surface treatment ¼ in or less thick to asphaltic concrete. For good service throughout the full life
bituminous pavement must retain following qualities.
The design should be done so that to meet the above requirements for considerable number of
years (need proper design and construction supervision). Pavement meeting all the requirements
above have been product if six distinctly different construction processes as follows
2 of 14 12/24/2020, 9:24 PM
Typical Road Structure Cross Section - Sub Grade, Base Course, Sub Bas... https://www.aboutcivil.org/road-structure-cross-section.html
Heat a viscous bituminous binder to make it fluid, then in a plant mix it with heated
aggregate place and compact the mixture while it is hot.
Use fluid bituminous binder, mix it with aggregate at normal temperature. Mixing may be
done at a plant (plant mix) or on the prepared roadway base (road mix). Spread and
compact the mixture at normal temperature.
Add solvent such as naphtha or kerosene to a viscous bituminous binder to make it fluid
with aggregate at normal temperature by either plant or road mix methods. Spread and
compact at normal temperature before solvent evaporates.
Use fluid emulsion of viscose bituminous binder in water, mix it with aggregate at normal
temperature by either plant or road mix method. Spread and compact at normal
temperature before the emulsion breaks down with its components.
Spread and compact clean crushed aggregate as for water bound macadam. Over it spray
heated dissolved or emulsified bituminous binder which penetrates open areas of the rock
and binds the aggregate together. Thus is commonly called “Penetration Method”.
Spread bituminous binder over the roadway surface then cover it with properly selected
aggregate. This is commonly called the “Inverted Penetration Method”.
Selections based on the requirements and economy, large volume of heavy vehicles, low traffic
volume etc.
It is the layer immediately under the wearing surface (Applies whether the wearing surface is
bituminous or cement concrete and or more inch thick or is but a thin bituminous layer). As base
course lies close under the pavement surface it is subjected to severe loading. The material in a
base course must be of extremely high quality and its construction must be done carefully.
It is layer of granular material provided above subgrade generally natural gravel. It is usually not
provided on subgrade of good quality. It is also called granular subbase.
3 of 14 12/24/2020, 9:24 PM
Typical Road Structure Cross Section - Sub Grade, Base Course, Sub Bas... https://www.aboutcivil.org/road-structure-cross-section.html
The subgrade material should be clean and free from organic matter and should be able to be
compacted by roller, to form stable sub-base. The material should have following characteristic.
50 100
37.5 80 - 100
20 60 - 100
5 30 - 100
1.15 170 - 75
0.3 9 - 50
4 of 14 12/24/2020, 9:24 PM
Typical Road Structure Cross Section - Sub Grade, Base Course, Sub Bas... https://www.aboutcivil.org/road-structure-cross-section.html
0075 5 - 25
* To avoid intrusion of silt and clay material in sub-base from subgrade
Recommended plasticity characteristic for granular Sub Base (Road Note 31) are;
Consists of the naturally occurring material on which the road is built, or the imported fill material
used to create an embankment on which the road pavement is constructed. Subgrades are also
considered layers in the pavement design, with their thickness assumed to be infinite and their
material characteristics assumed to be unchanged or unmodified. Prepared subgrade is typically
the top 12 inches of subgrade.
Let us know in the comments what you think about the concepts in this article!
1 Comment Sort by Oldest
Twahirwa Jonathan
THIS IS GOOD, THANKS
Like ꞏ Reply ꞏ 9w
5 of 14 12/24/2020, 9:24 PM
Typical Road Structure Cross Section - Sub Grade, Base Course, Sub Bas... https://www.aboutcivil.org/road-structure-cross-section.html
12 of 14 12/24/2020, 9:24 PM