SGGP Reference No

P0116-TAK-P01-0024-02
Onshore Pipeline Road Crossing
Calculation for 24" Gas
Transmission Pipeline Report
SGGP-9464-02-PL-CA-8036 00
PAGE 2 OF 8
PROJECT REPORT REV A1

Revision Change Notices

Rev Location Of Changes Brief Description Of Change


Onshore Pipeline Road Crossing
Calculation for 24" Gas
Transmission Pipeline Report
SGGP-9464-02-PL-CA-8036 00
PAGE 3 OF 8
PROJECT REPORT REV A1

CONTENTS

1. INTRODUCTION ................................................................................................................. 4
1.1 Purpose................................................................................................................................ 4
1.2 Definitions ............................................................................................................................ 4
1.3 Official Name and Location .................................................................................................. 5
1.4 Contract Number .................................................................................................................. 5
2. REFERENCES, STANDARDS, CODES & DOCUMENTS ....................................................... 5
2.1 Documents ........................................................................................................................... 5
2.2 NOC Codes, Standards and Specifications .......................................................................... 5
2.3 International Codes and Standards (Latest edition) .............................................................. 5
3. DESIGN PARAMETERS .......................................................................................................... 6
4. ASSUMPTIONS ....................................................................................................................... 6
5. CALCULATIONS ..................................................................................................................... 6
6. SUMMARY OF RESULTS ....................................................................................................... 6
7. CONCLUSION ......................................................................................................................... 7
APPENDIX I:................................................................................................................................... 8
ROAD CROSSING CALCULATIONS FOR 24" GAS TRANSMISSION PIPELINES ....................... 8
Onshore Pipeline Road Crossing
Calculation for 24" Gas
Transmission Pipeline Report
SGGP-9464-02-PL-CA-8036 00
PAGE 4 OF 8
PROJECT REPORT REV A1

1. INTRODUCTION
General Electrical Company (GECOL) awarded a contract to Sirt Gulf for Gas Projects
Company (SGGP) to Design and construct 4.9 Km of a new 24" Gas pipeline to Alkhalij
Power Station. The new pipeline will tie-in into existing 34" Coastal Gas Network Pipeline
by a barred reduced tee-using cold cut at approximately km 346.8 of the Brega-Tripoli
branch. The pipeline will transfer 317.7 MMSCFD of gas to Alkhalij Power Plant from 34”
Coastal Gas Network Pipeline to a metering station. The project is strategic to Libya and
has high attention from Government of National Accord, GECOL, and NOC.SGGP has
subcontracted the engineering work of the project to Taknia Libyan Engineering
Company (TLEC). The engineering scope is cover the engineering activities of
constructing 24” pipeline with custody metering station, gas filtration, condensate
recovery tank and control room. The battery limit is from and included the tie-in point to
the 34” Coastal Gas Pipeline up to the emergency shutdown valve HV001 inlet flange
face upstream of NG Filter Separator.

TLEC scope shall cover all FEED and detailed engineering for 24” pipeline, which include;
preparing all drawings, calculations, data sheets, specifications, bills of materials and
material requisition.

Taknia Engineers will work closely with SGGP and GECOL representatives throughout
the project to ensure good and efficient communication at all times and a clear, mutual
understanding of the development and progress of the project. Sirte Oil Operation (SOC)
is the ultimate owner and operator of the pipeline with its facilities. All project documents
has to be approved from SOC.

1.1 Purpose
The main objective of this document is to determine the road crossing calculation as per
API 1102 for the 24 Inch Gas Pipeline. The calculation will be used to verify the selected
thickness and check the suitability of the wall thickness for the following pipeline:

 24" x 4.9 Km (Approximately), GAS Pipelines from tie-in 34-inch Existing


pipeline to Al-Khalij power plant.

1.2 Definitions
Company name abbreviations are used in this procedure as follows:

CLIENT General Electricity Company of Libya (GECOL)


CONTRACTOR/
Sirt Gulf for Gas Projects Company (SGGP)
COMPANY
SUBCONTRACTOR Taknia Libya Engineering Company (TLEC)

OWNER Sirte Oil Company (SOC)


FEED Front End Engineering Design
FEED and Detailed Engineering for EPC Installation of a
PROJECT
24" Gas Transmission Pipeline to Al-Khalij Power Station
Onshore Pipeline Road Crossing
Calculation for 24" Gas
Transmission Pipeline Report
SGGP-9464-02-PL-CA-8036 00
PAGE 5 OF 8
PROJECT REPORT REV A1

1.3 Official Name and Location


The official name of the Project is:

“FEED and Detailed Engineering for EPC Installation of a 24" Gas Transmission Pipeline
to Al-Khalij Power Station”

The execution centre for engineering activities is Taknia Libya Engineering Company’s
office in Tripoli.

The Project Construction Sites is located in Sirte Gulf in Libya, adjacent to Al-Khalij
Power Station, approximately 20Km west of Sirte city. SeeFigure 1.

Figure 1: Location of Al-Khalij Power

1.4 Contract Number


The TLEC Contract Number is SGGP-9464

2. REFERENCES, STANDARDS, CODES & DOCUMENTS


The following Documents, codes and standards are applicable:

2.1 Documents
The following documents shall be referred to:

SGGP-9464-02-PL-CA- 8018 00 – Wall Thickness Calculations Report


SGGP-9464-02-PL-RP- 8001 00 – Pipeline Design Basis.

2.2 NOC Codes, Standards and Specifications


 GES R 01 Pipeline Material Selection.
 GES R 02 Pipeline systems.
 GES R 03 Pipeline welding and repair.
 GES R 04 Pipeline Construction specification.

2.3 International Codes and Standards (Latest edition)

ASME B 31.8 Gas Transmission and Distribution Piping Systems


Onshore Pipeline Road Crossing
Calculation for 24" Gas
Transmission Pipeline Report
SGGP-9464-02-PL-CA-8036 00
PAGE 6 OF 8
PROJECT REPORT REV A1

API RP 1102 Recommended practice for steel pipeline crossing


rails and highways

3. DESIGN PARAMETERS
The design parameters for the calculations of the pipeline crossings are as listed at the
beginning of the calculation sheet in Appendix I.

4. ASSUMPTIONS
Following assumptions have been used in the analysis of the road crossings:

1. Wall thickness with factor of safety of 0.5 has been used for the road crossings
Calculation at location class II, which is in line with pipeline design basis.
1. Installation temperature has been considered as 51 C.
2. The traffic data considered for the traffic includes standard traffic profile with special
vehicle considered as oil drilling rig (62 tons per axle). This is the worst load that can
occur.
3. Cover from top of pipeline has been considered as 1500 mm as per pipeline design
basis.
5. CALCULATIONS
The calculations are included in Appendix I of this document.

6. SUMMARY OF RESULTS

Table (1) Road Cross Calculation Summary for 24" Gas Pipeline.

Road Cross Calculation Summary

Pipeline Material API-5L-GR x 52

Depth of burial 1500 mm

Special Vehicle Loading – Axle type Oil Drilling Rig (62 tons per axle)

Crossing Trench Type Basic

Wall thickness 11.10 mm

Table (2) Stress Calculation Results for 24" Gas Pipeline.


Stress type at Road Calculated Allowable Acceptance Criteria
(N/mm2) (N/mm2)
Principal Stress (N/mm²) 231.9 358.5 100% of SMYS
Fatigue Girth Weld (N/mm²) 35.7 82.7 100% of SMYS
Fatigue Longitudinal Weld 51.4 82.7 100% of SMYS
(N/mm²)
Onshore Pipeline Road Crossing
Calculation for 24" Gas
Transmission Pipeline Report
SGGP-9464-02-PL-CA-8036 00
PAGE 7 OF 8
PROJECT REPORT REV A1

7. CONCLUSION
Refer to calculation sheets in Appendix I for 24" Gas Pipelines of wall thickness 11.10 mm
CS, API-5L-GR x 52,

The wall thicknesses selected at road crossings is as indicated in the table below:

Wall
Pipe Grade per
Pipeline Description Thickness
API 5L
(mm)

24" x 4.9 km, Gas API-5L-GR x 52


11.10
Pipelines.
Onshore Pipeline Road Crossing
Calculation for 24" Gas
Transmission Pipeline Report
SGGP-9464-02-PL-CA-8036 00
PAGE 8 OF 8
PROJECT REPORT REV A1

APPENDIX I:
ROAD CROSSING CALCULATIONS FOR 24" GAS TRANSMISSION PIPELINES
STEEL PIPELINE CROSSING RAILROADS AND HIGHWAYS, API RP 1102
Project: 24" Gas Transmission Pipeline Rev: A1
Project no.: SGGP By: OB
Client: SGGP9464 Chkd: ES
Case: SGGP-9464-02-PL-CA-8036 00 Apprd: MM Sirte Gulf for Gas Projects
Date: September 26, 2018 Company (SGGP)

Road Crossing Design for 24" Gas Transmission Pipeline

Step a - Design Parameters


Pipe and operational data:
Nominal diameter, ND 24 in. or 600 mm
Outside diameter, D 24.000 in. = 609.6 mm
Operating pressure, p 624 psi = 43.0 Bar
Steel grade
2
Specified minimum yield strength, SMYS 52000 psi = 359 N/mm
Design factor (for hoop stress), F 0.50 -
Design factor (for road crossings), F' 1.00
Longitudinal joint factor, E 1.00 -
Installation temperature, T1 124 °F = 51.0 °C
Maximum or minimum operating temperature, T2 95 °F = 35.0 °C
Temperature derating factor, T 1.00 -
Wall thickness, tw (CA is deducted ) 0.376 in. = 9.6 mm
Product 0.65
Installation and site data:
Depth, H 4.9 ft = 1.5 m
Bored diameter, Bd 24 in. = 610 mm
Soil type
2
Modulus of soil reaction, E' 0.5 ksi = 3.4 N/mm
2
Resilient modulus, Er 10 ksi = 69.0 N/mm
3 3
Unit weight, g 120 lb/ft = 18.9 kN/m
Type of longitudinal weld
Wheel load design
Design wheel load from single axle, Ps 136.6 kips = 607596.8 N
Pavement type
Misc pipe steel properties:
2
Young's modulus, Es 30000 ksi = 206850 N/mm
Poisson's ratio, ns 0.30 -
-1 -1
Coëfficiënt of thermal expansion, aT 6.50E-06 °F = 1.17E-05 °C

Step b - Check Allowable Hoop (Barlow) Stress


Liquids and other products
2
SHi(Barlow) = ( p * D ) / ( 2 * tw ) 19904.106 psi = 137 N/mm
2
F * E * SMYS = 26000 psi = 179 N/mm
SHi(Barlow) < F * E * SMYS ? Allowable? Yes

Page 1 of 3
STEEL PIPELINE CROSSING RAILROADS AND HIGHWAYS, API RP 1102
Project: 24" Gas Transmission Pipeline Rev: A1
Project no.: SGGP By: OB
Client: SGGP9464 Chkd: ES
Case: SGGP-9464-02-PL-CA-8036 00 Apprd: MM Sirte Gulf for Gas Projects
Date: September 26, 2018 Company (SGGP)

Step c - Circumferential stress due to earth load


Wall thickness to diameter ratio, tw / D tw / D = 0.016 -
According to figure 3, API 1102
Stiffness factor for earth load circumferential stress KHe = 6364 -
Depth to bored diameter ratio, H / Bd H / Bd = 2.4605 -
According to figure 4, API 1102
Burial factor for earth load circumferential stress Be = 1.00 -
Bored diameter to outside diameter ratio, Bd / D Bd / D = 1.00 -
According to figure 5, API 1102
Excavation factor for earth load circumferential stress Ee = 1.05 -
2
SHe = KHe * Be * Ee * g * D (Equation No. 1) SHe = 11136 psi = 76.8 N/mm

Step d - Impact factor, Fi and applied design surfaces pressure, w


Impact factor, Fi
According to figure 7, API 1102
the recommended impact factor, Fi Fi = 1.50 -
Applied design surfaces pressure, w
2 2
Contact area over applied wheel load, Ap Ap = 288 in. = 185806 mm
2
w = Pt / Ap OR w = Ps / Ap (Equation No. 2) w= 474.3 psi = 3.270 N/mm

Step e - Cyclic stresses, DSHh and DSLh


Cyclic circumferential stress, DSHh
According to figure 14, API 1102
Highway stiffness factor for cyclic circumferential stress KHh = 12.5 -
According to figure 15, API 1102
Highway stiffness factor for cyclic circumferential stress GHh = 1.29 -
According to Table 2, API 1102
Highway pavement type factor, R R= 1.00 -
Highway axle configuration factor, L L= 0.65 -
2
DSHh = KHh * GHh * R * L * Fi * w (Equation No. 5) DSHh = 7457.0 psi = 51.4 N/mm
Cyclic longitudinal stress, DSLh
According to figure 16, API 1102
Highway stiffness factor for cyclic longitudinal stress KLh = 10.0 -
According to figure 17, API 1102
Highway stiffness factor for cyclic longitudinal stress GLh = 1.12 -
According to Table 2, API 1102
Highway pavement type factor, R R= 1.00 -
Highway axle configuration factor, L L= 0.65 -
2
DSLh = KLh * GLh * R * L * Fi * w (Equation No. 6) DSLh = 5179.4 psi = 35.7 N/mm

Page 2 of 3
STEEL PIPELINE CROSSING RAILROADS AND HIGHWAYS, API RP 1102
Project: 24" Gas Transmission Pipeline Rev: A1
Project no.: SGGP By: OB
Client: SGGP9464 Chkd: ES
Case: SGGP-9464-02-PL-CA-8036 00 Apprd: MM Sirte Gulf for Gas Projects
Date: September 26, 2018 Company (SGGP)

Step f - Circumferential stress due to internal pressurization, S Hi


2
SHi = p * (D - tw ) / ( 2 * tw ) (Equation No. 7) SHi = 19592.275 psi = 135 N/mm

Step g - Principal stress, S1, S2, S3


2
S1 = SHe + DSH + SHi S1 = 38186 psi = 263.3 N/mm
2
S2 = DSLh - Es * aT * (T2 - T1) + ns * (SHe + SHi) S2 = 20014.0 psi = 138.0 N/mm
2
S3 = -p S3 = -623.7 psi = -4.3 N/mm

2
Seff = ( 0.5 * [ (S1 - S2)2 + (S2 - S3)2 + (S3 - S1)2 ] )0.5 Seff = 33632 psi = 231.9 N/mm
2
SMYS * F' = 52000 psi = 358.5 N/mm
Seff < SMYS * F' ? Allowable? Yes

Step h - Check fatigue


Girth welds
2
Fatigue endurance limit of girth weld, SFG SFG = 12000 psi = 82.7 N/mm
2
SFG * F' = 12000 psi = 82.7 N/mm
2
Cyclic longitudinal stress, DSLh DSLh = 5179 psi = 35.7 N/mm
DSLh < SFG * F' ? Allowable? Yes
Longitudinal welds
2
Fatigue endurance limit of longitudinal weld, SFG SFL = 12000 psi = 82.7 N/mm
2
SFL * F' = 12000 psi = 82.7 N/mm
2
Cyclic circumferential stress, DSHh DSHh = 7457 psi = 51.4 N/mm
DSHh < SFL * F' ? Allowable? Yes

Page 3 of 3