READ AIRCRAFT

MANUAL PROCEDURE
ENGINE TYPE : BOEING 737- NO : DATE :
300/400/500
PREPARED BY : Chalidea Ramadhina APPROVED BY : Angga Alwihadi
DESCRIPTION

I . PROCEDURE

1. take the appropriate airplane manual


steps :
 find the appropriate aircraft AMM
 find the appropriate aircraft type
 find the part of component which want to inspection

2. open the list of effective airplane


steps :
 find suitable aircraft history
 find the chapter that matches with the aircraft
 find the appropriate page is matches with the chapter

3. open the appropriate chapter


steps :
 find the chapter which are necessary
 find the table of content according to the chapter which are necessary
Notice : (Figure for the example)

4. open the table of content


steps :
 find the part which to want to inspection
 Find objects according to the part which are looking for that are needed to be inspected
5. open the page which are needed
steps :
 find the parts page
 find the part in detail which are want to inspect
II . MANUAL INTRODUCTION (FM)
1. Chapter numbering (page 3)
BOEING 737-300/400/500
MAINTENANCE MANUAL
America West Airlines, Inc.
HIGHLIGHTS
CHAPTER 00 - INTRODUCTION
INTRODUCTION
Changed the contact information.
1-30
CHAPTER 05 - TIME LIMITS/MAINTENANCE CHECKS
05-00-00 Added airworthiness limitation precautions.
201-202
05-51-47 Changed the title.
201
05-51-67 Added missing items to the table.
208
05-51-91 Added steps to put the airplane back to its usual condition, added
201-202 procedural enhancements for clarification and made editorial
205-210 changes.
05-51-91 Changed the pressure unit to show the type of pressure.
201,205
207-208
05-51-91 Changed the procedure to update references and clarify wording
202
205-207
CHAPTER 07 - LIFTING AND SHORING
07-11-11 Added a step to specify that shock strut must be deflated when
205 weighing the airplanes.
CHAPTER 08 - LEVELING AND WEIGHING
08-11-00 Added steps to level the airplane with inclinometers.
201,203
08-11-00 Added a Removal/Installation procedure for lateral/longitudinal
401-402 inclinometers.
CHAPTER 09 - TOWING AND TAXIING
09-10-00 Added a warning message which requires installing tow bar prior to
209 inserting the lockout pin in high winds.
CHAPTER 10 - PARKING AND MOORING
10-11-00 Added a Ref for the Parking Brake Control.
206
05
TRANSMITTAL LETTER
D6-37525 PAGE 3
JAN 12/06
2. Page numbering (page 6)
BOEING 737-300/400/500
MAINTENANCE MANUAL
CHAPTER 21 - AIR CONDITIONING
21-00-01 Added more detail to the existing procedure and steps to check the
201-207 air cycle machine for oil contamination.
21-00-05 Changed procedure to make the steps for the right pack confidence
203-208 check similar to the steps for the left pack confidence check.
210
21-22- 11 Changed the repair
instructions for duct assemblies
insulated with
801-812 BMS 8-300 Polyimide foam insulation to add rework instructions for
wrapping the 'hypalon' covering completely with new insulation
tape BMS 5-157 to meet new flammability/flame propagation
requirements of FAR 25.856(a). Removed the BMS 5-149 tape.
21-23-25 Changed the repair instructions for duct assemblies insulated with
201-256 BMS 8-300 Polyimide foam insulation to add rework instructions for
wrapping the 'hypalon' covering completely with new insulation
tape BMS 5-157 to meet new flammability/flame propagation
requirements of FAR 25.856(a). Removed the BMS 5-149 tape.
21-23-25 Added the data for SB 737-21A1138 which added insulation and tape
250-255 to the overhead distribution duct segments which connect to the
sidewall risers.
21-23-25 Added more detail to the repair procedure to agree with the
801 removal and installation procedure.
803-808
21-31-00 Added resistance values across connector D950 when performing the
CONFIG 1 Pressurization Control System fuse tests.
121
21-31-00 Added a step to remove the forward left lining in the cargo
CONFIG 2 compartment.
203
21-31-12 Added three brands of freeze spray to the Special Tools and
201 Equipment section.
21-32-21 Changed the upper pressure limit at which the safety relief valve
504-506 just starts to open from 8.74 psi to 8.65 psi. Changed the
presentation of the relief valve pressure opening data from a NOTE
to a step to conform to data format standards.
21-51-00 Changed the POST-SB 21-1086 pack valve description to state that
2 the high flow schedule from the APU is possible on the ground and
also in flight.
21-51-21 Changed the procedure to remove bulk code B00541 from the manual
701 which referenced detergent P-D=220.
21-52-00 Changed the length of the effectivity.
502
21-52-12 Changed the length of the effectivity.
403
21-52-61 Changed wire specification from MS20995 to NASM20995.
301
21-58-61 Changed the procedure to remove bulk code B00541 from the manual
203 which referenced detergent P-D=220.
05

TRANSMITTAL LETTER
D6-37525
PAGE 6
JAN 12/06

3. Org breakdown of AMM (page 8)


A 737-300/400/500
MAINTENANCE MANUAL
22-12-21 Removed BMS 5-26 class B2 and added BMS 5-45 class B2.
404
22-12-31 Moved YAW DAMPER COUPLER - ADJUSTMENT/TEST to
CONFIG 1 AMM 22-12-31/501 CONFIG 1 which replaces AMM 22-12-31/501.
501-506
22-12-31 Moved YAW DAMPER COUPLER - ADJUSTMENT/TEST to AMM 22-12-
31/501
CONFIG 2 CONFIG 2, which replaces AMM 22-12-32/501.
501-510
CHAPTER 23 -
COMMUNICATIONS
23-28-00 Changed spelling.
7
23-28-00 Changed the length of the effectivity.
10,13
23-71-00 Changed the length of the effectivity.
CONFIG 1
7
23-71-21 Changed the length of the effectivity.
203-205
CHAPTER 24 - ELECTRICAL POWER
24-11-00 Added the data to include measuring for isolation resistance.
CONFIG 1
105
24-11-13 Added this task: Generator Drive Oil Temperature Indicator -
401-402 Removal/Installation.
24-21-42 Added this procedure: Galley Load Shed Sensor Module -
401-404 Removal/Installation.
24-21-81 Changed the tool data to add equivalent multimeter.
504-505
24-31-11 Changed wire specification from MS20995 to NASM20995
206
24-31-12 Changed wire specification from MS20995 to NASM20995.
601,607
24-31-31 Added steps for the static inverter terminal torque settings.
401,403
24-54-00 Added coverage for the testing of R326 Battery Bus Relay to the
507 Standby Power System - Operational Test.
CHAPTER 25 - EQUIPMENT/FURNISHINGS
25-01-12 Changed the data to update the insulation blanket and effectivity
801-854 description.
25-11-21 Changed the data to update the insulation blanket procedure and
201-214 effectivity description.
25-21-39 Changed the data to update the insulation blanket procedure and
402-404 effectivity description.
05
TRANSMITTAL LETTER
D6-37525 PAGE 8
JAN 12/06
4. Powerplant group chapter 70-80

CHAPTER 28 - FUEL 28-11-31 Changed airworthiness limitation statement.


28-00-00 Changed the data for Airworthiness Limitation 406
Instructions. 28-11-41 Changed rotation direction for removal and
201 installation of sump
205-206 406-407 drain.
217 28-13-00 Removed references to BMS 5-26, which is
28-10-00 Changed the format of the fuel tank entry and replaced by BMS 5-45.
closure procedures. 4
201-262 28-13-31 Removed reference to BMS 5-26, which is being
28-10-00 Changed the data from carbon dioxide to replaced by BMS
carbon monoxide. 403-406 5-45.
224 28-13-31 Changed airworthiness limitation statements.
28-11-00 Added the data for a detection kit and updated 405-407
steps. 28-13-31 Removed references to BMS 5-26, which is
201,203 replaced by BMS 5-45.
205,217 703
28-11-00 Added the data for filter replacement interval. 28-13-41 Changed airworthiness limitation statements.
202,208 408
210,219 28-14-11 Removed reference to seal washers.
225 407
28-11-00 Removed reference to BMS 5-26, which is 28-14-21 Removed reference to BMS 5-26, which is being
being replaced by BMS replaced by BMS
602 5-45. 422 5-45.
610-611 28-14-22 Removed
636,648 reference to BMS 5-26, which is
28-11-00 Added being replaced by BMS
tool J28010-1. 404 5-45.
614,619 415-417
28-11-00 Added a leakage location. 28-14-82 Removed reference to BMS 5-26, which is being
631,680T replaced by BMS
680X 402 5-45.
28-11-00 Removed reference to BMS 5-26, which is 28-21-11 Added a step to close the QTY circuit breaker.
being replaced by BMS 404
703,716 5-45. 28-21-31 Added circuit breakers.
718 401,404
28-11-00 Removed reference to BMS 5-26, which is 406
being replaced by BMS 28-21-71 Changed airworthiness limitation statements.
807 5-45. 401,436
809-812 442
814,817 28-21-71 Changed the torque values.
821-824 432,438
826 28-22-00 Added reference to the engine fuel feed
830-832 lines/coupling pressure
836,844 201,203 test.
846,849 208-209
28-11-00 Added missing step to the Repair of the 28-22-00 Added data for the auto shutoff functional test.
Secondary Fuel Barrier 501
865 Sealant task. 550-561
28-11-11 Changed the airworthiness limitation statement. 28-22-00 Changed information for airworthiness limitation
414-415 precautions.
417 601
420-421 603-605
28-11-11 Removed reference to BMS 5-26, which is 612-614
being replaced by BMS 28-22-00 Added general statements to clarify procedure
801,803 5-45. contents.
28-11-31 Removed references to BMS 5-26, which is 601,610
replced by BMS 5-45. 618-619
28-22-13 Changed the data to show SB 28-1100 is
completed and removed the
603 Fuel Feed Check Valves - Removal/Installation
procedure.
FORM NO. P
AGE 1 OF 2