SUBMITTAL COVER SHEET

Submittal No.
PROJECT NAME Revision No.
Contract No. Revision Date
Contract Date Discipline
Contractor Title
Contract Title Ref.

FIRST SUBMITTAL OF THIS ITEM OR RESUBMITTAL

TYPE OF SUBMITTAL
Shop Drawings & Schedules Programme Preliminary As - Built
Samples Certification and Verification of O& M Manual
Materials & Product Data Performance Other
As Built Drawings Inspection & Test Reports Mock-ups & QC Panels
Method Statement
REFERENCES: Product Name Manufacturer/Supplier

Specification & BOQ Ref. Location/Use

DESIGN CONSULTANT'S COMMENTS:

CONTRACTOR'S REVIEW SUBMITTAL REVIEW STATUS


Contractor has reviewed this submission prior to submission A Approved No Comments
to consultant
B Approved As Noted

C Not Approved - Revise

Signature_________________________ R For Record Only

DATE RECEIVED :______________ DATE RETURNED __________________

DESIGN CONSULTANT SIGNATURE


For and on behalf of [Engineer]
Date : _________________

Name :XXXXXXXXXX Signature:_________________

PROJECT MANAGERS APPROVAL


For and on behalf of [Project Manager]
Date : _________________

Name : XXXXXXXXXX Signature:_________________


SUBMITTAL COVER SHEET
Submittal No.
PROJECT NAME Revision No. 0
Contract No. Revision Date 3-Mar-09
Contract Date Discipline ARCHITECTURAL
Contractor Title MS for Shopfront Top Support Installation

Contract Title Ref.

FIRST SUBMITTAL OF THIS ITEM OR RESUBMITTAL

TYPE OF SUBMITTAL
Shop Drawings & Schedules Programme Preliminary As - Built
Samples Certification and Verification of O& M Manual
Materials & Product Data Performance Other
As Built Drawings Inspection & Test Reports Mock-ups & QC Panels
Method Statement
REFERENCES: Product Name Manufacturer/Supplier

Method Statement for Shopfront Installation Quality Metal Works

Specification & BOQ Ref. Location/Use

DESIGN CONSULTANT'S COMMENTS:

CONTRACTOR'S REVIEW SUBMITTAL REVIEW STATUS


Contractor has reviewed this submission prior to submission A Approved No Comments
to consultant
B Approved As Noted

C Not Approved - Revise

Signature_________________________ R For Record Only

DATE RECEIVED :______________ DATE RETURNED __________________

DESIGN CONSULTANT SIGNATURE


For and on behalf of [Engineer]
Date : _________________

Name :XXXXXXXXXX Signature:_________________

PROJECT MANAGERS APPROVAL


For and on behalf of [Project Manager]
Date : _________________

Name : XXXXXXXXXX Signature:_________________