Professional Documents
Culture Documents
Tunnel Sr. No. Works Description Unit Qty. Electrical Works
Tunnel Sr. No. Works Description Unit Qty. Electrical Works
Tunnel Sr. No. Works Description Unit Qty. Electrical Works
Supplying and making end termination with brass compression gland and
3 aluminium lugs for following size of PVC insulated and PVC sheathed /
XLPE copper / aluminium conductor cable of 1.1 KV grade as required.
Wiring for light point/ fan point/ exhaust fan point/ call bell point with
1.5 sq.mm FRLS PVC insulated copper conductor single core cable in
4 surface GI conduit, with switch, cover plate, suitable PVC box for surface
mounting arrangement and earthing the point with 1.5 sq.mm. FRLS PVC
insulated copper conductor single core cable etc as required.
Supplying and fixing following way, horizontal type three pole and
neutral, sheet steel, MCB distribution board, 415 V, on surface/ recess,
6 complete with tinned copper bus bar, neutral bus bar, earth bar, din bar,
interconnections, powder painted including earthing etc. as required.
(But without MCB/RCCB/Isolator)
8a 40 A Each 3
8b 63 A Each 3
Supply and installation of light fixture similar to model no. TCW 450 of
12 M/s philips or equivalent. Item include hanging / mounting arrangement Nos. 156
complete in all respect.