Supply To Others: Direct 373+91 464 Direct Total 464+56 520 Indirect 63+46 109

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 3

Under Contract Cancellation Non

Supply to
Sl No Location Direct Indirect others shifting June'19 July'19 August'19 Productive Total
1 Shop Fabrication 171 12 13 6 5 207
2 Shop Painting 39 3 3 2 47
3 Shop Rigging 20 2 3 2 1 1 29
4 CNC Works 23 3 5 2 2 35
5 Site - SNC 24 10 1 35
6 Site - SEPC 38 5 2 45
7 Site - TRD Duqm 32 9 6 47
8 Site - TCM 22 1 2 25
9 Adam Site 4 1 5
SubTotal 373 46 6 8 0 24 10 8 475
1 Stores 6 2
2 Maintainence 14 5
3 Camp 13 2 2 cleaner, 1Ac Tech, I helper, 8 mess, 1 tanker helper
4 GM Operations 1 E Kannan
5 Project managers 2 Sunder, Victor
6 Manager QA-QC 1 Sunil

7 Planning 5 Roopesh, Sagabudin, Sreedhar, Waseem, Adarsh, [Harish - transferred to TESCO]

QA-QC [Shop] 1 13 Ajai, Marimuthu, Ashok, Anand, Thanganathan, Shalin, Harsad alam, Razak, Suresh, Chandrasekar, Raja, Anish,Praveen, Alam
8
9 QA-QC [Site] 5 Hema sundara rao, Harishankar, Razak, Vignesh,
10 HSE 3 4 Ibrahim, Robin, sainath, Saranji
11 Engineering 10
12 Estimation 3
13 Procurement 2
14 Marketing 1 DIRECT
15 DocumentControl 2 373+91 = 464
16 Project control 2 6+8+24+10+8= 56
17 IT 1 Direct Total = 464+56 = 520
18 Office Tea Boy 1
19 Office Cleaner 2 INDIRECT
20 Driver 3 63+46 = 109
GRAND TOTAL 520+109 = 629
Contract cancellation. At
22 Camp 3 Sinha Swapan * Resigination approved by MD on 25.06.2019
23 Accounts 2
24 On Vocation 45
91 63
UNITED INDUSTRIAL SERVICES CO LLC
PRODUCTION VS MANPOWER STATUS (SHOP & SITE)

Area Job No Description UOM June'19 Jul'19 Aug'19 Sep'19


J-252 Shriram EPC-Main Structures MT 35
J-279 SNC Lavlin-Structures MT 250 260
Structural J-285 TR- Piperack Structures MT 550 900 1000 500
Fabricatio
n J-292 Saipem-Structures MT 100 150 200
Total 835 1260 1150 700
Man Power required 208 257 208 127
Job No Description UOM June'19 Jul'19 Aug'19 Sep'19
J-287 MPT tank- Pipe spool fabrication ID
Piping J-288 TR- Pipe spool fabrication ID 5000 12000 20000
Fabricatio Petrofac Pipe Spool Fabrication ID 5000
n Total ID 0 5000 12000 25000
Man Power required 33 80 167
Job No Description UOM June'19 Jul'19 Aug'19 Sep'19
J-252 Shriram EPC-Structures MT 140
Site J-276 Shiram EPC- Sheeting works Sq.m 7000
Installatio
n J-279 SNC Lavlin-Structures Installation MT 200 250
J-289 TR Structural Installation MT 400 500 500 500
Total 540 500 700 750
Man Power required 75 58 82 88
Total Man Power Required 283 348 370 381
Available 377 385 385 385
Excess(+) / Shortage (-) 94 37 15 4
Hired To Tesco 46
Under Training 10 12
To be accounted 33 under Contra
S CO LLC
OP & SITE)

Date: 20.07.2019
Oct'19 Nov'19 Dec'19 Jan'20 Feb'20

500 500 500


200 200 200 200 200
700 700 700 200 200
127 127 127 36 36
Oct'19 Nov'19 Dec'19 Jan'20 Feb'20

21000 21000 20000 15000 7000


5000 5000 5000 5000 5000
26000 26000 25000 20000 12000
173 173 167 133 80
Oct'19 Nov'19 Dec'19 Jan'20 Feb'20

500 500 500 150


500 500 500 500
1000 1000 1000 650 0
117 117 117 76
417 417 410 245 116
385 385 385 385 385
-32 -32 -25 140 269

33 under Contract cancellation