Professional Documents
Culture Documents
Dam Axis Notes:: Draft
Dam Axis Notes:: Draft
EL.500.00
EL.500.00
FACE SLAB
1.6 1.4
1
4 3C 1
EL.480.00
MDDL. 473.00
EL.470.00
2B
1 EL.460.00
EL.460.00 1
3A
4
8000 (Typ)
EL.440.00 R.C.C. PLINTH 1 1.4
1 1
1A 3B 3C
3C EL.425.00
EL.420.00 INTEGRATED U/S COFFER DAM
2B EL. 413.50
2A 3D
EL. 403.50
EL.400.00
2.5 2.5 2C
INTEGRATED U/S EL.390.00
PRE - COFFERDAM 1 3A 1 4A
EL.380.00 2
EL.380.00
EL. 375.00 2B 1 3D
3B 3B 2 INTEGRATED
3C EL.373.00
NSL 1 D/S COFFER DAM
3B
EL.360.00 N.S.L N.S.L
INTEGRATED D/S
CONSOLIDATION GROUT HOLE PRE - COFFERDAM 5
EL.340.00 MIN.10.0 m DEEP INTO THE ROCK 4
TOE DRAIN
2C
CUT-OFF WALL
EL.320.00 ROCK LINE
336314 314462
12000
EL.300.00
342314 320462
APPROVED BY:
SCALE: DRAWING NO : NMPP - SHER - FSR - CD - 103
0 20 40 60 80 100m. DATE:
September 2020
SHEPL - SKCPL