Program: Riyadh Township – KADEN Road

INSPECTION AND TEST PLAN


INSTALLATION AND TESTING OF SEWERAGE PIPING
Project Kaden Road ITP Sequence No M-002 Rev 0 Discipline Mechanical Date 19-12-2020

S.No Activity Reference Document / Acceptance Criteria Frequency Responsible Record/Forms Inspection Code
Description Standard Personnel SBC MC E

Material Project Specification Apply and Comply Each Store H/R


1 Receiving with entire delivery or Keeper / Approved MIR H/R H/R
Ref- 01 45 00 1.3 D, 01
Inspection 66 00 1.1A & Approved characteristics of Partial QC Engineer
Material Submittal. Material Data Sheet Delivery
Construction
` Excavation shall be Manager/
done to the required For Each MEP
2 Excavation Project Specification depth as per Installation Manager/ Approved IR H/R H/R H/R
& Trenching Reference 31 23 00 and approved drawing or during Site
Approved Method and approved Installation Engineer /
Statement procedure shall be QC Engineer
followed

Pipes shall be
supported by proper
3 Installation Project Specifications supports. All the For Each Construction
of Pipes & 33 30 00 Installed Pipes and Installation Manager/
Approved IR H/R H/R H/R
Fittings Fittings shall be or during MEP
approved by Installation Manager/
Engineer prior to the Site
Installation at site. Engineer /
Only Approved shop QC Engineer
drawing shall be
used for Installation

1|Page
Program: Riyadh Township – KADEN Road

S.No Activity Reference Document / Acceptance Criteria Frequency Responsible Record/Forms Inspection Code
Description Standard Personnel SBC MC E
All the required Construction
parameters shall be Manager/
4 Testing of Project Specification in accordance with For Each MEP
Approved IR H/R H/R H/R
Pipes Ref- 33 30 00 Part 2.1 & specified specs, Installation Manager/
Part 3.1 B & C Calibrated Devices or during Site
and approved Installation Engineer /
Method Statement QC Engineer
Construction
Release of All the required For Each Manager/
Water and Project Specification parameters shall be Installation MEP
5 Connection Ref- 33 30 00 in accordance with or during Manager/ Approved IR H/R H/R H/R
to the specified specs Installation Site
system Engineer /
QC Engineer
Manholes, Covers & Construction
Manholes, Project Specifications Frames shall be For Each Manager/
6 Covers & Ref- 33 39 13 1.3 to 1.6 installed at exact Installation MEP
Frames or during Approved IR H/R H/R H/R
locations as per the Manager/
approved shop Installation Site
drawings Engineer /
QC Engineer
Backfilling and For Each Construction
7 Backfilling & Project Specification 31 Warning Tapes shall Installation Manager/
Warning 23 00 & 33 40 00 Part 2 be done as required or during MEP
Approved IR H/R H/R H/R
Tapes & Part 3 and stated in Project Installation Manager/
Specifications Site
Engineer /
QC Engineer

2|Page
Program: Riyadh Township – KADEN Road

S.No Activity Reference Document / Acceptance Criteria Frequency Responsible Record/Forms Inspection Code
Description Standard Personnel SBC MC E

Construction
All the required For Each Manager/
8 Installation Project Specifications parameters shall be Installation MEP
of Manholes 33 39 13 Part 1 Approved IR H/R H/R H/R
in accordance with or during Manager/
and Covers specified specs Installation Site
Engineer /
QC Engineer

H- Hold Point S-Surveillance R-Record N/A


Written notification required, contractor Relevant party will take continuous Documentation shall be retained by or Not Applicable
shall not proceed beyond this point or periodic survey of activity submitted to relevant party for record
without approval of consultant
SBC MC E
Sub Contactor Main Contractor Consultant Engineer