Inspection and Test Plan Installation and Testing of Sewerage Piping
Inspection and Test Plan Installation and Testing of Sewerage Piping
S.No Activity Reference Document / Acceptance Criteria Frequency Responsible Record/Forms Inspection Code
Description Standard Personnel SBC MC E
Pipes shall be
supported by proper
3 Installation Project Specifications supports. All the For Each Construction
of Pipes & 33 30 00 Installed Pipes and Installation Manager/
Approved IR H/R H/R H/R
Fittings Fittings shall be or during MEP
approved by Installation Manager/
Engineer prior to the Site
Installation at site. Engineer /
Only Approved shop QC Engineer
drawing shall be
used for Installation
1|Page
Program: Riyadh Township – KADEN Road
S.No Activity Reference Document / Acceptance Criteria Frequency Responsible Record/Forms Inspection Code
Description Standard Personnel SBC MC E
All the required Construction
parameters shall be Manager/
4 Testing of Project Specification in accordance with For Each MEP
Approved IR H/R H/R H/R
Pipes Ref- 33 30 00 Part 2.1 & specified specs, Installation Manager/
Part 3.1 B & C Calibrated Devices or during Site
and approved Installation Engineer /
Method Statement QC Engineer
Construction
Release of All the required For Each Manager/
Water and Project Specification parameters shall be Installation MEP
5 Connection Ref- 33 30 00 in accordance with or during Manager/ Approved IR H/R H/R H/R
to the specified specs Installation Site
system Engineer /
QC Engineer
Manholes, Covers & Construction
Manholes, Project Specifications Frames shall be For Each Manager/
6 Covers & Ref- 33 39 13 1.3 to 1.6 installed at exact Installation MEP
Frames or during Approved IR H/R H/R H/R
locations as per the Manager/
approved shop Installation Site
drawings Engineer /
QC Engineer
Backfilling and For Each Construction
7 Backfilling & Project Specification 31 Warning Tapes shall Installation Manager/
Warning 23 00 & 33 40 00 Part 2 be done as required or during MEP
Approved IR H/R H/R H/R
Tapes & Part 3 and stated in Project Installation Manager/
Specifications Site
Engineer /
QC Engineer
2|Page
Program: Riyadh Township – KADEN Road
S.No Activity Reference Document / Acceptance Criteria Frequency Responsible Record/Forms Inspection Code
Description Standard Personnel SBC MC E
Construction
All the required For Each Manager/
8 Installation Project Specifications parameters shall be Installation MEP
of Manholes 33 39 13 Part 1 Approved IR H/R H/R H/R
in accordance with or during Manager/
and Covers specified specs Installation Site
Engineer /
QC Engineer