ASTRA Contracting

Risk Assessment for Sewerage Installation


Document No: AST-SA-C-002 Revision: 0
Date Issued: 19-12-2020

Risk Assessment for Sewerage Piping Installation


1. Hazard Identification 2. Risk Evaluation 3. Risk Control

Risk Level
Likelihood
Possible Accident Action Officer

Severity
No.

Task Step Hazard Existing Risk Control Additional Risk Control Measure
Health & Persons-at-risk Follow- up Date)

• Reconfirmed the weight of load


1. Damage to crane & lifting
Assess the weight and 1. Ensure that the load is within the lorry crane capacity. by second party. Foreman /
Wrong Assessment of Weight gears due to overloading.
01.

L
CG of the load 2. Ensure that the lorry can contain the load. • Keep clear from any Supervisor
2. Injure other workers
unauthorized personnel.

1. RA Briefing for all workers. Lifting can only be carried out


Arrange proper lifting 1. Body Injury Foreman /
Wrong Selection 2. Select proper lifting gear with the recommended lifting
02.

M
4

1
gear to be used 2. Property damage Supervisor
3. Anchor Point Check gears and lifting machines.

1. To be carried out be qualified rigger


Falling from height (if rigging is
Hook up lifting gear as 2. Pipes must be strapped and secured Foreman /
required to be performed on Increase safety awareness
coordinated with Hand & finger injury 3. Appropriate PPE used (hand Glove etc.) Supervisor /
03.

M
4

1
the lorry) through safety briefing / training.
Crane operator 4. Select correct lifting gear for the task (size and capacity) Rigger
Improper handling
5. All loose items on the lorry must be secured / removed

1. Set up out rigger fully


2. Qualified Driver
• Conduct toolbox briefing.
3. Barricade lifting area Lifting Supervisor /
Lifting of pipe onto Lorry crane toppled Faulty Fatality / Bodily injury • RA briefing
4. Lifting equipment in good working condition (with valid cert), and within Lorry Crane
04.

M
5

1
Lorry. lifting gear Struck By Object Hand & Finger Injury Supplier to provide maintenance
Safe Working Load. operator
record
5. Swing slowing
6. Safe Work Practice for Manual Handling
1. Observe Speed Limit.
2. Qualified Driver.
Transport from Point A Crash Pipe Fallen Accident 3. Load must be properly secured, tied down.
Conduct Toolbox Briefing. Driver / Helper
05.

M
5

1
to Point B Pipe fell off the lorry Road traffic accident 4. All lose item must be cleared from the lorry or tied down before
transportation.
5. Firmly secured the pipe within the load capacity of the lorry crane

ASTRA CONSTRUCTION Page 1 SEWERAGE SYSTEM


ASTRA Contracting
Risk Assessment for Sewerage Installation
Document No: AST-SA-C-002 Revision: 0
Date Issued: 19-12-2020

Unloading the load Falling from height (if rigging is 1. To be carried out be qualified rigger
Foreman /
(Hook up lifting gear required to be performed on 2. Appropriate PPE used (hand Glove etc.) Increase safety awareness
Hand and finger injury Supervisor /
06.

M
4

1
as coordinated with the lorry) 3. Select correct lifting gear for the task (size and capacity) through safety briefing / training
Rigger
Crane operator) Improper handling 4. All loose items on the lorry must be secured / removed

1. Set up out rigger fully Qualified Driver


2. Barricade lifting area
3. Firm and solid ground • Conduct toolbox briefing Lifting Supervisor /
Lifting of pipe off the Lorry crane toppled Faulty Fatality / Bodily injury
4. Lifting equipment in good working condition (with valid cert), and within • RA briefing Supplier to provide Lorry Crane
07.

M
5

1
Lorry lifting gear Struck By Object Hand and Finger Injury
Safe Working Load maintenance record operator
5. Swing slowing – observed SWP
6. Safe Work Practice for Manual Handling

Falling from height (if rigging is


Load in position, required to be performed at
Lifting Supervisor to conduct Rigger and
Removal of lifting height) Hand & Finger Injury 1. Use Proper PPE
08.

L
safety briefing Signalmen on site
gears Falling lifting gears
Improper handling

ASTRA CONSTRUCTION Page 2 SEWERAGE SYSTEM