Professional Documents
Culture Documents
Preliminary Data For Proposed Bridge: Hydraulic Data As Per Irrigation Dept
Preliminary Data For Proposed Bridge: Hydraulic Data As Per Irrigation Dept
Design discharge :
Velocity of flow :
Silt Factor :
Bed Slope :
4
Bed material :
HFL :
10 L.W.L :
11 Nature of riverbed materials :
12 Width of the river at Bank to Bank :
13 Width of river 0.F.L :
14 Width of the river at H. F.L :
15 Whether banks are firm or meandering :