Professional Documents
Culture Documents
Keonjhar BSNL Case No - FC-1650-POW-14-15
Keonjhar BSNL Case No - FC-1650-POW-14-15
Thanks all
Received two nos of module.
Regards.
B R Dalabehera
SDE BSNL, Barbil, Keonjhar
9437080999
On Fri, Apr 10, 2015 at 11:20 AM, Biswaranjan Dalabehera <dbbiswa@gmail.com> wrote:
Dear ELTEK Logistic team,
After tracking the consignment no 444765043 of Trackon Courier , It is learnt that the same Courier does not have any delivery at Barbil, Keonjhar. The same is at
Bhubaneswar HUB and about to return to Gurgaon. Kindly arrange to collect the modules at Bhubaneswar Trackon courier office and send the same to Barbil as early as
possible.
1
Regards.
B R Dalabehera
SDE BSNL, Barbil, Keonjhar
9437080999
Dear sir,
We have dispatched the below given modules through trackon courier via docket no is 444765043 as on 2-Apr-2015.
Rgds,
PINKI KALKAL
Logistic-CS
2
ELTEK, Plot no. 362, Pace City -2, Sec-37, Udyog Vihar
Subject: RE: ELTEK POWER PLANT FAULTY MODULE FOR REPLACEMENT - BSNL REGARDING
Detail address
Biswaranjan Dalabehera.
SDE BARBIL.BSNL
TELEPHONE EXCHANGE
BARBIL, KEONJHAR
ODISHA
PIN- 758035
Dear Sir,
3
Pls provide address with pin code.
Rgds,
PINKI KALKAL
Logistic-CS
ELTEK, Plot no. 362, Pace City -2, Sec-37, Udyog Vihar
4
Dear Sir
Refer to our Discuss Pls Arrange back Faulty R.M in Local Station BBSR For Repair .
Also We are arrange For Send 2nos OK R.M As Shared Address & Conform Same by mail .
Aside - Logistic Team Pls send 2 nos OK R.M on below Address & Conform
SDE BARBIL,
Ajit Ku Samal
Sr Engineer ( East )
Mobile: +91-9338571039
E-mail Id – ajit.samal@eltek.in
www.eltek.com
Follow us at Twitter | Facebook | LinkedIn
Please consider the environment before printing this e-mail - you can make a difference!
With our HE-technology we have saved more than 1 175 504 tons CO2 in the last 8 years. There are many ways to contribute to save the environment. You can contribute by not
printing this e-mail!
6
From: Biswaranjan Dalabehera [mailto:dbbiswa@gmail.com]
Sent: Thursday, April 02, 2015 11:18 AM
To: anil.mishra@eltek.in
Cc: saurabh.tewari@eltek.in; ajit.samal@eltek.in; brsahoo.bsnl@gmail.com; cm_alda@bsnl.co.in; cm_alda@yahoo.co.in; scn1411@gmail.com; sde_joda@yahoo.com; alok
patel; RAMESH CHANDRA DASH
Subject: ELTEK POWER PLANT FAULTY MODULE FOR REPLACEMENT - BSNL REGARDING
Dear Anil,
It is to intimate you that, One SMPS Power Plant 100A (3+1) was installed at Kiriburu Hill Top, BSNL site on 23rd Feb, 2015. After one month of
operation it is found that, two of the modules are gone faulty. A complain was registered in BSNL QA site for immediate replacement of faulty module as the
same covers warranty and the case no is FC-1650-POW-14-15. The same was informed to your Gurgaon Office and to Mr Ajit from Bhubaneswar. As per the
undertaking of warranty certificate please provide the service at our doorstep.
Kindly take necessary action with immediate effect for early replacement of the faulty modules for smooth operation of the site. Awaiting your early reply
in this regard.
SDE BARBIL,
7
BARBIL TELEPHONE EXCHANGE
With Regards..
Biswaranjan Dalabehera
9437080999