Client : Doha Metro Phase-1 General Contractor:

Engineer : Qatar Rail


INSPECTION REQUEST MMHKT Consortium

Engineer's Assistant : PMCS


(IRE) Subcontractor: ZITRON

Main Location MSHEIREB STATION UCST000 Site office: MSHEIREB STATION

Internal IRE Ref. No. ZIT-MSI-CON-11-IRE-UCST000-000237 Rev. No. 1 Inspection Date:


Issue Date:
ACONEX IRE Ref. No. Rev. No. Inspection Time:
Document Aconex Reference no. Rev Status
Reference Drawing(s):
M010-MSI-CON-SPK-61419 1 NOT SUBMITTED
Method Statement (MS) M010-MSI-CON-11-MES-51424 3 SONO
Inspection Test Plan (ITP) M010-MSI-CON-11-ITP-51424 3 SONO
Material Submittal M010-MSI-CON-11-MAR-57037 2 SONO
Others
Contact Person: Fernando Mobile No.: 70645852
Details of Inspection
□ Non Specific □ Energy □ Rolling Stock □ SCADA322
□ Depot (Building) □ PSD □ AFC □ ICC / ECC
System Technical
□ Depot Maintenance Equipment □ TVS □ Signaling & Train Control
Discipline
□ Stabling Yard (Building) □ Track work □ Telecommunications
□ Stabling Yard Equipment □ MMS □ Value Added Digitisation
MCC ROOM 1220 MEZZANINE- FAN ROOM 1224 & 2216 CONCOURSE LEVEL SOUTH EAST, MUSHEIREB
Detailed Location :
STATION
EARTHING CABLE: 1 .(EB To EB_DP_04A_E1)_1x95mm²_2 RUNS, 2.(EB To EB_DP_04B_E1)__1x95mm²_2
Details of Item to be inspected :
RUNS, 3. (EB To EB_TVF_15_E1)_1x95mm²_1 RUNS, 4. (EB To EB_TVF_13_E1_1x95mm²_1 RUN

Activities : CABLE LAYING INSPECTION OF FOR EARTHING CABLES

Inspection Requested By (Subcontractor)


Name Date / Time Designation Signature Remarks
Fernando QA/QC Inspector
Inspection Requested Approved By (MSI)
Section Name Date/Time Designation Signature
QC Department

Survey Department
Interface (E&M/other)
* if applicable
Interface (Other)
* if applicable
MSI Comments Comment Reviewed and Closed
□ Accepted (Details) Name/Signature/Date
□ Accepted w/ comments
□ Rejected

□ Inspection time has


passed, the works can (to be sign by authorized construction in-charge) (MSI QA/QC Dept.)

proceed:
Name: Signature: Date :
Witness Section to be Filled by the Engineer
Name Signature and Date:
Designation
Status □ Accepted □ Accepted with comments □ Failed/Rejected
Right First Time Comments:


Due Date : ______________________
Attachment(s) :ZIT-MSI-MAT-11-IRE-UCST000-000213, MHI-MDR-INT-022/MHI-MDR-INT-034

* Due date of observation raised by PMCS for:


Rectification = 7 days after original inspection
Documentation = 14 days after original inspection

Page 1 of 1