12 m3hr. WTP OFFER For Bore Well Water - BOQ
12 m3hr. WTP OFFER For Bore Well Water - BOQ
Submitted by
ACUMEN ENGINEERING LIMITED
Ref: QSPL/JCX/BNG/SC/VI/18-19/N.STD. 033
20th March, 2019
We believe, our offer will come in line with your requirement & look forward to receive your
valued order.
Thanking you & assuring you our best services at all the times.
Sumon Khan
Mail: sumon@acumenengineeringltd.com
Mobile: +8801700744656
The following annexure form the part of our offer.
Note:-
Please note that any change in raw water characteristics will affect treated water quality /
quantity. The data marked by * are not furnished by you hence assumed by us. Please also note
that the feed water to the Water Treatment Plant shall be filtered water and shall be within the
specified norms with respect to these parameters.
Capacity Calculation:
Name Quantity Unit
Total Unit 60 Nos
Consider People Per Unit 6 Person/Unit
Consider Water Using Per Person 160 Ltr/Day
Total Water Using 60*6*160= 57600 L/Day
3
Scheme- I: -DMF-SF- 1 Stream X 15.0 m
B. /hr.
TREATMENT SCHEME
Note: - The above values are achieved provided the raw water quality mentioned in our technical
scope remains unaltered. In case of any change in raw water quality, there will be corresponding
change in treated water quality.
Please Note:
1. Treatment scheme is designed on the basis of given inlet parameters and hence any
change or variation in the inlet parameters of water shall have implications on the outlet
quality of water where offer stands subjected for revision and may have both technical &
commercial change implications.
2. Also, any change in Pollution Control Board Norms between the ordering phase and
execution phase will lead to technical and commercial change in the given offer.
3. As per the tender specification, we will not confirming to match the IS: 10500 norms as
the scheme is provided is nowhere matching relevant to norms. We will warranty the
parameter which is specified in the above. If anything especially chemical parameter
warranty required from clients end, then the specific parameter is to be mention by client
individually. Accordingly the schemes, Flow as well as the pricing of the entire equipment
will be change.
In case any deviation in the design parameter as mention above or the water quality will
deviate as per the specify norms of inlet unit, in which case this Techno - Commercial offer
would stand to be revised, as deemed corrected by us.
D. PROCESS DESCRIPTION
Iron Removal Filter:-
In ground water or bore well water presence of Iron and manganese has always been a matter of
concern. Presence of these elements in water does not pose a risk to human health but it can
cause unpleasing taste, odour and staining, which is not accepted in most of applications in
domestic use as well as commercial and industrial use; therefore, oxidation filtration often knows
as iron removal process employed to remove naturally occurring iron and manganese from
water. For these iron and manganese removal process an Iron Removal Filter is utilized.
The Process through which iron is removed from water is known as Oxidation Filtration that
involves the oxidation of the soluble forms of iron (Fe) and manganese (Mn) to their soluble
forms and then removal by filtration. Manganese usually known as oxidant. The oxidant
chemically oxidizes the iron and manganese (forming a particle), and kills iron bacteria and any
other disease-causing bacteria that may be present after that the filter removes the iron and
manganese particles.
Most activated carbons are made from raw materials such as nutshells, wood, coal and
petroleum. The two principal mechanisms by which activated carbon removes contaminants
from water are adsorption and catalytic reduction. Organics are removed by adsorption and
residual disinfectants are removed by catalytic reduction. This unit works on the phenomenon of
surface filtration. The unit offered consists essentially of a mild steel pressure vessel. It is
externally fitted with necessary pipe work, valves, pressure gauges, and sampling points at the
inlet and outlet.
The filtration bed consists of fine sand as well as Activated Carbon media of specified size over a
layer of gravels. Water flows downwards through the filter bed and the suspended solids are
retained on the Activated Carbon. The filtered water is evenly collected by header lateral type
bottom collecting system.
At a pre-determined pressure drop the backwash of filter is initiated to clean the filter bed. The
backwash water at specific flow rate is pumped through the filter bed in upward direction to
facilitate expansion of the filter bed. The particles are kept in suspension and are washed and
dirty water is sent to drain from the upper side of the vessel.
Once the backwash cycle is completed, filter is taken online for service after a final rinse
with service flow rate.
ANNEXURE – II: SCOPE OF SUPPLY AND WORK
A. SCOPE OF SUPPLY
a. Mechanical Equipments
Mechanical Equipment:-
d. Electricals
a. Mechanical Items
DESIGN CODES
Pressure Vessel As per ASME-Sec-VIII, Div.-I/ IS:2825
MOC of shell & Disc IS-2062, Grade B
Corrosion Allowances 1.5 mm. (Nil for R/L vessels, tanks & piping)
Rubber Lining IS 4682 Part – I/Equivalent BS
Piping DIN 8062/ IS-2825, ERW-Medium Duty
Flanges BS-10, Table-D
Design Pressure 3.5 Kg/cm2
Internals As per proprietary
Painting Internal : 2 coats of Epoxy painting,
External: 2 coats of Red Oxide Primer paint.
Inspection As per categorization furnished below.
VALVES (Manual)
50NB and Below Multiport Valve (manual)
50NB and above Wafer type butterfly valve(manual)
MOC Body- Cast Iron, Disc- CF8M, Seat- EPDM
Lining Hard ebonite lined (3mm thk.) wherever applicable
Diaphragm Neoprene rubber
End Connection Flanged
Instrument isolation, sampling Needle valves of size 15NB of AISI with screwed
valves ends
Nut, Bolt & Fasteners As per IS standard.
b. Electrical Items
MOTORS
Type Totally Enclosed fan Cooled(TEFC) squirrel Cage
Protection IP-55
Insulation Class B
Mounting Foot Mounted
Power supply 415 V, 3Phase,50Hz
Duty Continuous
Type of Cooling TEFC
Insulation class “F”
Starting Direct On Line (DOL)
Temperature 500C
MCC-
System supply 415 V AC, 3 Phase, 4W, 50 Hz.
Control supply 230 V AC through a suitable control transformer
c. Instrumentation Items
Instrument Spec.
Pressure Gauge 0-7 kg/cm2, Bourdon type- For low pressure.
On line Rotameter Online type- GRP- For Required Flow
Level Indicator Glass type
Note: Our commercial bid is considering the above mentioned standards. In case of any
deviations on the above mentioned standards and any price implications shall be extra at actual.
ANNEXURE – III: - Load Data & Scope Matrix
C. LIST OF SUB-VENDORS
1. Raw Water : At the inlet of the Feed pump common header -- 1 mtr.
2. Filter water : At the Outlet of the ACF Unit- 1 mtr.
3. Waste : Drain Line of each unit.
4. Dosing : At all the Dosing Tank inlet.
5. Service water : Service water line at all the Dosing Tank.
F. SCHEDULE OF EXCLUSION
Design of civil tanks - structures and preparation of RCC structural drawings, civil BOQ etc.
All civil works including design and constructions of foundations, drains, drain sumps,
neutralisation sum supports of all types, platforms, drain channels, plants building and
mass concreting of units (if required).
All civil works including grading / levelling of site foundations, building drains, platform
(including MS and Civil) Equipments, pipe supports and underground cable trenches,
grouting.
Client has to provide us free power supply at the MCC Panel inlet feeder. From MCC panel
to individual Filter feed pump &agitator along with all rotary items as per requirement.
All pipe support will not be in our scope of supply.
Raw water St. Tank, Brine Measuring Tank, Back wash water St. Tank, Soft water Tank are
not in our scope of supply.
All consumable (Like Consumable chemicals NaCl, Oil & Greece etc.) will not be in our scope
of supply even in commissioning stage including the first charge also.
Labour & Equipments required for unloading, safe storage & positioning of equipment at
site. Crane/ Hydra for positioning of Filtration unit & placing the GLS Separator on tank.
Client has to arrange labor, tools & tackles during erection & commissioning of the system
including lifting arrangement if required. Only supervision of erection & commissioning will
be in our scope of work.
Material Unloading & Storing facility is not in our scope of work. Client has to arrange the
material nearer to the site at the time of erection & commissioning.
Site security will be not in our scope.
Approval of drawing, documents from consultants end will be not in our scope of job. Client
has to arrange the same for their own.
Construction roads inside the plant and approach roads.
Construction of fencing of the plant.
Utilities e.g. Water, Electricity, compressed air up to control panel at site etc.
Earthing for Control Panel & all Electrical Equipment.
Lighting arrangements, lighting fixtures, lamps, poles, and cables required for lighting or
any lighting distribution boards.
Supply of all types of laboratory Equipments as well as Laboratory facilities including
necessary instruments, chemicals and staff if required will be not be in our scope.
Proper Site illumination should be required at the time of erection & commissioning of the
system as well Plant illumination is also excluded from our scope of supply & work.
Emergency power supply and illumination system.
All piping, cabling etc. beyond the termination points as mentioned in our offer.
Lightening protection.
Operation & Maintenance of the plant.
Testing and inspection of the equipment at site should be in client scope along with third
party inspection.
NOC/Approval from Statutory Bodies.
Any other item not specifically mentioned in our scope.
The relative documents will be submitted during detail Engg. For Approval & References.
FORCE MAJEURE
We shall be under no liability for delay in delivery/completion of work if we or our sub-
contractors/suppliers are prevented from discharging our respective obligations under the
contract for causes beyond our reasonable control including but not limited to war(whether
declared or not), invasion, acts of enemies, hostilities, riots, civil commotion, labour disturbance,
strikes, lockout, layoffs, mutiny, insurrection, rebellion, revolution, epidemics, accidents,
sabotage, fire, earthquake, floods, government orders and restrictions, legal enactment, delay or
inability to obtain materials due to change in Import policy or other statutory restrictions, lack of
transport facilities, interruptions/restrictions in power supply, damage to or breakdown of plant,
machinery and equipment etc.
CONSEQUENTIAL DAMAGES
Neither party shall at any time be liable to the other for any loss or profits or any similar
indirect damages, however, described, incurred or suffered by either party in respect of the
project.
VALIDITY
Unless previously revoked, our offer shall be valid for 30 days from the date of this
proposal.
GENERAL
Any condition or other matters pertaining to this offer not expressly stipulated will be a
matter of mutual discussions and agreement at the time of accepting the order.
NOTE:-
QSPL reserves the right to change or modify the equipment specifications.
The scope of supply is restricted to supply of equipment as specified in the proposal. Any
subsequent additions or alterations will be acceptable to us provided it is convenient to do so and
the prices and delivery period are suitably revised. Separate Purchase Order will be required for
Supply of the material & Supervision of Erection & commissioning.
B. PRICE AND TERMS OF PAYMENT
PRICE:-
Our most competitive price for the Design, engineering & Supply of the WTP
PlantScheme- OC-DMF- ACF-10.0 m3/hr. X 1 streamas described in the offer with shall be as
follows:
In Words:
PRICE BASIS:
The above prices are CFR Benapole.
Please Note: If there are any statutory variations/implications in taxes and duties before the
expiry of delivery date, the same will be to your account.
TERMS OF PAYMENT
100% of the total value of the order to be paid against irrevocable letter of credit payable
at site from a reputed bank.
Yours sincerely,
For, Acumen Engineering Ltd.
Sumon Khan
Mail: sumon@acumenengineeringltd.com