TECHNO-COMMERCIAL PROPOSAL OF

PREFABRICATED EFFLUENT TREATMENT PLANT BASED ON

Water treatment Plant unit for Bore well water


Having capacity 12.0 m3/hr. each
For
JCX Project of James Group

Submitted by
ACUMEN ENGINEERING LIMITED
Ref: QSPL/JCX/BNG/SC/VI/18-19/N.STD. 033
20th March, 2019

Project: Shptak Emprace


Kind Attn. : Mr.
Subject : Our Techno commercial Offer for Water Treatment Plant along having capacity-
3
12.0 m /hr.as per your requirement.
Dear Sir
At the onset we would hereby like to express our deep gratitude for allowing us to quote for the
aforesaid enquiry. With reference to the discussion, please find below the complete techno
commercial offer which is in line with your requirement

We believe, our offer will come in line with your requirement & look forward to receive your
valued order.
Thanking you & assuring you our best services at all the times.

For, Acumen Engineering Ltd.

Sumon Khan
Mail: sumon@acumenengineeringltd.com
Mobile: +8801700744656
The following annexure form the part of our offer.

ANNEXURE – 1 : TECHNICAL DETAILS


A. DESIGN BASIS AND ASSUMPTIONS
B. TREATMENT SCHEME.
C. DESIGN OUTPUT PARAMETER
D. PROCESS DESCRIPTION

ANNEXURE – 2 : SCOPE OF SUPPLY AND TECHNICAL DATA


A. SCOPE OF SUPPLY
a. Mechanical Equipments.
b. Technical specification of mechanical items.
c. Interconnecting Piping Equipments.
d. Electrical List.
e. Instrumentation List.
B. GENERAL TECHNICAL SPECIFICATION
a. Mechanical items.
b. Instrumentation Items.

ANNEXURE – 3 : LOAD DATA & SCOPE MATRIX


A. LIST OF CIVIL UNITS (IN CLIENT’S SCOPE).
B. ELECTRICAL LOAD LIST (Tentative)
C. LIST OF SUB-VENDORS.
D. List of Deviation as per tender Doc.
E. TERMINATION POINT & BATTERY LIMITS
F. SCHEDULE OF EXCLUSIONS.
G. DRW. & DOC. SUBMISSION AND INSPECTION CATEGORIES.

ANNEXURE – 4 : COMMERCIAL SCHEDULE


A. COMMERCIAL TERMS AND CONDITIONS
B. PRICE AND TERMS OF PAYMENT
ANNEXURE – I: TECHNICAL DETAILS

A.DESIGN BASIS AND ASSUMPTIONS

Source of water: - As per water analysis report provided


Design Consideration:- Source of water: - Bore well water.
Sl. No. Parameter Unit Design Value
1. Temperature °C 35.0
2. pH --- 6.7
3. Total Dissolved Solid ppm as CaCO3 Not Mentioned
4. Total Hardness ppm as CaCO3 <60
5. Iron ppm as Fe <0.6

Note:-
Please note that any change in raw water characteristics will affect treated water quality /
quantity. The data marked by * are not furnished by you hence assumed by us. Please also note
that the feed water to the Water Treatment Plant shall be filtered water and shall be within the
specified norms with respect to these parameters.
Capacity Calculation:
Name Quantity Unit
Total Unit 60 Nos
Consider People Per Unit 6 Person/Unit
Consider Water Using Per Person 160 Ltr/Day
Total Water Using 60*6*160= 57600 L/Day

3
Scheme- I: -DMF-SF- 1 Stream X 15.0 m
B. /hr.
TREATMENT SCHEME

Scheme-I: - IRF- ACF- 12.0 m3/hr


Raw water source (By Client) ---- Iron Removal Filter (1X 12.0 m3/hr.)----- Activated Carbon Filter
(1X 12.0 m3/hr.)------- Overhead Treated Water Tank (By Client).

C. DESIGN OUTPUT PARAMETER


Design Output- Flow rate:-
Scheme- I: IRF, ACF- 12.0 m3/hr
No. of Iron Removal Filter - 1W
Iron Removal Filter inlet Flow each m3/hr. 12.0
Iron Removal Filter operation Hr. Hr. 20.0
No. of Activated Carbon Filter - 1W
Activated Carbon Filter inlet Flow each m3/hr. 12.0
Activated Carbon Filter operation hr. Hr. 20.0
Mode of operation Manual.

Design output: - Treated Water Quality


Fe at outlet of Filtration unit NTU <0.3
Total hardness at the outlet of Softener ppm as CaCO3 Remains Unchanged
Other Chemical parameter ---- Remains Unchanged

Note: - The above values are achieved provided the raw water quality mentioned in our technical
scope remains unaltered. In case of any change in raw water quality, there will be corresponding
change in treated water quality.

Please Note:
1. Treatment scheme is designed on the basis of given inlet parameters and hence any
change or variation in the inlet parameters of water shall have implications on the outlet
quality of water where offer stands subjected for revision and may have both technical &
commercial change implications.
2. Also, any change in Pollution Control Board Norms between the ordering phase and
execution phase will lead to technical and commercial change in the given offer.
3. As per the tender specification, we will not confirming to match the IS: 10500 norms as
the scheme is provided is nowhere matching relevant to norms. We will warranty the
parameter which is specified in the above. If anything especially chemical parameter
warranty required from clients end, then the specific parameter is to be mention by client
individually. Accordingly the schemes, Flow as well as the pricing of the entire equipment
will be change.
In case any deviation in the design parameter as mention above or the water quality will
deviate as per the specify norms of inlet unit, in which case this Techno - Commercial offer
would stand to be revised, as deemed corrected by us.

D. PROCESS DESCRIPTION
Iron Removal Filter:-
In ground water or bore well water presence of Iron and manganese has always been a matter of
concern. Presence of these elements in water does not pose a risk to human health but it can
cause unpleasing taste, odour and staining, which is not accepted in most of applications in
domestic use as well as commercial and industrial use; therefore, oxidation filtration often knows
as iron removal process employed to remove naturally occurring iron and manganese from
water. For these iron and manganese removal process an Iron Removal Filter is utilized.

The Process through which iron is removed from water is known as Oxidation Filtration that
involves the oxidation of the soluble forms of iron (Fe) and manganese (Mn) to their soluble
forms and then removal by filtration. Manganese usually known as oxidant. The oxidant
chemically oxidizes the iron and manganese (forming a particle), and kills iron bacteria and any
other disease-causing bacteria that may be present after that the filter removes the iron and
manganese particles.

Activated Carbon Filter:-


The Filter water is pumped through the Activated Carbon Filter for reduction of color, Odour as
well as removal of microbial load. Activated Carbon filter consists combination of Activated
Carbon as a filter media with supporting media. When the pressure drop across the filter occur,
the filter is backwashed to remove dust and dirt. Activated carbon is commonly used for
removing organic constituents and residual disinfectants in water supplies. This not only
improves taste and minimizes health hazards; it protects other water treatment units such as
reverse osmosis membranes and ion exchange resins from possible damage due to oxidation or
organic fouling. Activated carbon is a favored water treatment technique because of its
multifunctional nature and the fact that it adds nothing detrimental to the treated water. 

Most activated carbons are made from raw materials such as nutshells, wood, coal and
petroleum.  The two principal mechanisms by which activated carbon removes contaminants
from water are adsorption and catalytic reduction.  Organics are removed by adsorption and
residual disinfectants are removed by catalytic reduction. This unit works on the phenomenon of
surface filtration. The unit offered consists essentially of a mild steel pressure vessel. It is
externally fitted with necessary pipe work, valves, pressure gauges, and sampling points at the
inlet and outlet.

The filtration bed consists of fine sand as well as Activated Carbon media of specified size over a
layer of gravels. Water flows downwards through the filter bed and the suspended solids are
retained on the Activated Carbon. The filtered water is evenly collected by header lateral type
bottom collecting system.

At a pre-determined pressure drop the backwash of filter is initiated to clean the filter bed. The
backwash water at specific flow rate is pumped through the filter bed in upward direction to
facilitate expansion of the filter bed. The particles are kept in suspension and are washed and
dirty water is sent to drain from the upper side of the vessel.
Once the backwash cycle is completed, filter is taken online for service after a final rinse
with service flow rate.
ANNEXURE – II: SCOPE OF SUPPLY AND WORK

A. SCOPE OF SUPPLY

a. Mechanical Equipments

Mechanical Equipment:-

Sl. No. Description No. of Scope

1. Raw water St. Tank- RCC- By Client. 1W Client


2. Iron Removal Filter- Ø 800 X 1800 HOS- MS- Header & Lateral 1W AEL
assembly- Capacity-12.0 m3/hr. along with Frontal piping,
valves.
3. Activated Carbon Filter- Ø 800 X 1800 HOS- MS- Header & 1W AEL
Lateral assembly- Capacity-10.0 m3/hr. along with Frontal
piping, valves.
4. Interconnecting pipe work from Filter Feed Pump Inlet to ACF 1W AEL
outlet
5. Rotameter- capacity- 12.0 m3/hr. 1W AEL
6. Overhead Treated Water Tank (By Client) 1W Client

b. Technical specification of mechanical items

Iron Removal Filter: - 1 no.


1. No. of Filters : 1 no.
2. Type of Filters : Vertical cylindrical type with dished end.
3. Capacity of each Filter : 12.0 m3/hr.
4. Velocity Consider through bed : <20.0 m3/hr. / m2.
5. Operating pressure : 3.0 kg. /cm2.
6. Design Pressure : 3.5 kg. /cm2.
7. Vessel Design Code : As per IS: 2825.
8. Diameter of vessel : 800 mm.
9. HOS of vessel : 1800 mm.
10. Shell MOC code : IS-2062, Grade-B.
11. Disc MOC code : IS-2062, grade-B.
12. Shell/ Disc Thickness : 4/5 mm.
13. Pipeline Size : 50 NB.
14. Filter Media type : Pebbles, Gravels & Mesh Sand and MnO2.
15. Free board specified : Approx. 45%.(min.)
16. Frequency of Backwash : once in 20 hr.
17. Backwash Duration : 30 min.
18. Rinse Duration : 10 min.
19. Piping material : As per IS-1239- medium duty- ERW.
20. Frontal piping MOC : As per IS-1239- medium duty- ERW.
21. Interconnecting Pipe work : As per IS-1239- medium duty- ERW.
22. Valve : Provided 1 lot.
23. Valve type : Multiport Valve.
24. Internal distribution : False Bottom.
25. MOC of Inlet Distribution : MS-IS: 1239, ERW-Medium Duty.
26. Internal painting : MSEP.
27. External Painting : 2 coats of Red oxide.
28. Mode of operation : Manual.
29. Location of installation : Indoor/Outdoor.

Activated Carbon Filter: - 1 no.


1. No. of Filters : 1 no.
2. Type of Filters : Vertical cylindrical type with dished end.
3. Capacity of each Filter : 12.0 m3/hr.
4. Velocity Consider through bed : <15.0 m3/hr. / m2.
5. Operating pressure : 3.0 kg. /cm2.
6. Design Pressure : 3.5 kg. /cm2.
7. Vessel Design Code : As per IS: 2825.
8. Diameter of vessel : 800 mm.
9. HOS of vessel : 1500 mm.
10. Shell MOC code : IS-2062, Grade-B.
11. Disc MOC code : IS-2062, grade-B.
12. Shell/ Disc Thickness : 4/5 mm.
13. Pipeline Size : 50 NB.
14. Filter Media type : Supporting Media, Gravels & Activated Carbon.
15. Free board specified : Approx. 45%.(min.)
16. Frequency of Backwash : once in 20 hr.
17. Backwash Duration : 30 min.
18. Rinse Duration : 10 min.
19. Piping material : As per IS-1239- medium duty- ERW.
20. Frontal piping MOC : As per IS-1239- medium duty- ERW.
21. Interconnecting Pipe work : As per IS-1239- medium duty- ERW.
22. Valve : Provided 1 lot.
23. Valve type : Multiport Valve.
24. Internal distribution : False Bottom.
25. MOC of Inlet Distribution : MS-IS: 1239, ERW-Medium Duty.
26. Internal painting : MSEP.
27. External Painting : 2 coats of Red oxide.
28. Mode of operation : Manual.
29. Location of installation : Indoor/Outdoor.

c. Interconnecting Piping Equipments

Sl. No. Description MOC Scope


1. Raw Water Tank to IRF Interconnecting uPVC AEL
2. IRF Frontal Piping uPVC AEL
3. IR to ACF Interconnecting uPVC AEL
4. ACF Frontal Piping uPVC AEL
5. ACF outlet to Treated Water Tank uPVC Client
6. IRF, ACF Drain line up to drain sump uPVC AEL
7. All valves & accessories within battery limit As required AEL

d. Electricals

Sl. No. Description No. of Scope


1. LT Electrical motor all the rotary items as specified above 2 lot. AEL
within the battery limit.- 3Ø, Squirrel cage induction motor,
IE2 efficiency, IP55, 415V + 10%, 50 Hz, Class-F, DOL/ Star-
Delta type, Type- TEFC, Ambient temp.-Within battery
limit.- 4 nos.
2. MCC panel for supplied Rotary items- Manually operated 1 no. AEL
panel equipped with required Feeders (3Ø, 415V + 10%, 50
Hz with neutral) – Non draw out type, Non
compartmentalized.
 Control Supply- Not Provided.
 Floor mounting, free standing, MOC-Fabricated
Steel, 3 mm CRCA sheet, Front cabinet door, back
cabinet hinged type.
 Internal wiring control circuit- 1.5 mm2.
 Power Busbar- High conductivity Aluminum,
 Control Busbar- Copper.
 Incomer- Single incomer- Bottom entry, with MCCB,
Voltmeter/ Ammeter & R/Y/B indication lamp. No
protection relay are consider.
 Outgoing- Terminal Block.
 Motor Starter feeder- Fixed type, DOL/ Star-Delta
Type, MPCB/MCCB, Power contractor, Aux.
contractor, Indication lamp (On/Off/Trip), OLR.
Switchgear- L&T/Siemens/ ABB.
 Spare feeder- Not Provided.
3. Electrical cable (Power cable, control cable & instrument 1 lot AEL
cable etc.), trays, Cable tie, earthing strip, glands, lock nuts,
etc. & accessories within Battery limit for the supplied
rotary items.- Within Battery limit
4. Earthing- All electrical Equipments, Rotary items, supplied 1 lot Client
instruments, LPBS, MCC, Control panel etc. including earth
pit, Earthing strips, Required Pit-salts & other related
accessories etc.
5. Lightning Protection 1 lot Client
6. Lighting at the Plant area, MCC room, PLC room & all 1 lot Client
related panel.
e. Instrumentation

Sl. No Instrument Quantity Location


At the outlet of Filter Feed pump—2
At the inlet & outlet of DMF—2
1. Pressure Gauge 6
At the inlet & outlet of ACF—2

By pass type ACF Outlet – 1


2. 1
Rotameter
3. Floaty 1 Raw Water Tank—1
Note: Our commercial bid is considering the above mentioned Equipments. In case of any
additional Equipments or instruments required from clients end as specified above, price
implications shall be extra at actual.
B. General Technical Specification

a. Mechanical Items

DESIGN CODES
Pressure Vessel As per ASME-Sec-VIII, Div.-I/ IS:2825
MOC of shell & Disc IS-2062, Grade B
Corrosion Allowances 1.5 mm. (Nil for R/L vessels, tanks & piping)
Rubber Lining IS 4682 Part – I/Equivalent BS
Piping DIN 8062/ IS-2825, ERW-Medium Duty
Flanges BS-10, Table-D
Design Pressure 3.5 Kg/cm2
Internals As per proprietary
Painting Internal : 2 coats of Epoxy painting,
External: 2 coats of Red Oxide Primer paint.
Inspection As per categorization furnished below.

VALVES (Manual)
50NB and Below Multiport Valve (manual)
50NB and above Wafer type butterfly valve(manual)
MOC Body- Cast Iron, Disc- CF8M, Seat- EPDM
Lining Hard ebonite lined (3mm thk.) wherever applicable
Diaphragm Neoprene rubber
End Connection Flanged
Instrument isolation, sampling Needle valves of size 15NB of AISI with screwed
valves ends
Nut, Bolt & Fasteners As per IS standard.

PLANT PIPING AND FLANGES


Material of Piping IS 1239 medium duty- ERW.
Type IS 2062- Grade-B
Reducers and Tees Made out of pipes or plates
Bends Up to 80NB out of pipes only
Gaskets Ring type of natural soft rubber
Structure and support MS Commercial grade

b. Electrical Items

MOTORS
Type Totally Enclosed fan Cooled(TEFC) squirrel Cage
Protection IP-55
Insulation Class B
Mounting Foot Mounted
Power supply 415 V, 3Phase,50Hz
Duty Continuous
Type of Cooling TEFC
Insulation class “F”
Starting Direct On Line (DOL)
Temperature 500C

MCC-
System supply 415 V AC, 3 Phase, 4W, 50 Hz.
Control supply 230 V AC through a suitable control transformer

c. Instrumentation Items

Instrument Spec.
Pressure Gauge 0-7 kg/cm2, Bourdon type- For low pressure.
On line Rotameter Online type- GRP- For Required Flow
Level Indicator Glass type

Note: Our commercial bid is considering the above mentioned standards. In case of any
deviations on the above mentioned standards and any price implications shall be extra at actual.
ANNEXURE – III: - Load Data & Scope Matrix

A. LIST OF CIVIL UNITS (In Client’s scope)


SL.NO. Equipments DESCRIPTION QTY
3
Min. 12.0 m - 60 min. of retention time-
I. Raw water Tank 1 No.
RCC
II. Foundation of IRF Drawing will be submitted during DDE. 1 No.
III. Foundation of ACF Drawing will be submitted during DDE. 1 No.
IV. Mass Concreting of ACF Drawing will be submitted during DDE. 1 No.
V. Foundation of Pumps Drawing will be submitted during DDE. 1 lot.
3
Min. 10.0 m - 60 min. of retention time-
VI. Filteredwater St. Tank 1 No.
RCC
Note: - the major list of civil construction indicated above. Apart from the same the other civil
construction which is required will be in client scope of supply & work.

B. Tentative Electrical Load Lit


Note: - All above kW are tentative and may change during detail engineering.

C. LIST OF SUB-VENDORS

SL.NO. DESCRIPTION MAKE


1. uPVC Pipes & Fittings Astral/Era/Ashirbad/Eqv.
2. Balll Valves Astral/Era/Ashirbad/Eqv.
3. Pressure Gauge H. Guru /Waree/General/ Boumer/ Eqv.
4. Water Rotameter Aster/ Roth BS/Eqv.
5. Float Level D.K. Inst. / Aster / Eqv.
6. Filter Vessels AEL
7. Chemical Dosing Pump Initiative/Eqv
8. Multiport Valve Hayward/Pentair/ Equiv.
Note: Our commercial bid is considering the above mentioned vendor. In case of any deviations
on the above mentioned vendor, price implications shall be extra at actual.

E. TERMINATION POINTS & BATTERY LIMITS

1. Raw Water : At the inlet of the Feed pump common header -- 1 mtr.
2. Filter water : At the Outlet of the ACF Unit- 1 mtr.
3. Waste : Drain Line of each unit.
4. Dosing : At all the Dosing Tank inlet.
5. Service water : Service water line at all the Dosing Tank.
F. SCHEDULE OF EXCLUSION

 Design of civil tanks - structures and preparation of RCC structural drawings, civil BOQ etc.
 All civil works including design and constructions of foundations, drains, drain sumps,
neutralisation sum supports of all types, platforms, drain channels, plants building and
mass concreting of units (if required).
 All civil works including grading / levelling of site foundations, building drains, platform
(including MS and Civil) Equipments, pipe supports and underground cable trenches,
grouting.
 Client has to provide us free power supply at the MCC Panel inlet feeder. From MCC panel
to individual Filter feed pump &agitator along with all rotary items as per requirement.
 All pipe support will not be in our scope of supply.
 Raw water St. Tank, Brine Measuring Tank, Back wash water St. Tank, Soft water Tank are
not in our scope of supply.
 All consumable (Like Consumable chemicals NaCl, Oil & Greece etc.) will not be in our scope
of supply even in commissioning stage including the first charge also.
 Labour & Equipments required for unloading, safe storage & positioning of equipment at
site. Crane/ Hydra for positioning of Filtration unit & placing the GLS Separator on tank.
Client has to arrange labor, tools & tackles during erection & commissioning of the system
including lifting arrangement if required. Only supervision of erection & commissioning will
be in our scope of work.
 Material Unloading & Storing facility is not in our scope of work. Client has to arrange the
material nearer to the site at the time of erection & commissioning.
 Site security will be not in our scope.
 Approval of drawing, documents from consultants end will be not in our scope of job. Client
has to arrange the same for their own.
 Construction roads inside the plant and approach roads.
 Construction of fencing of the plant.
 Utilities e.g. Water, Electricity, compressed air up to control panel at site etc.
 Earthing for Control Panel & all Electrical Equipment.
 Lighting arrangements, lighting fixtures, lamps, poles, and cables required for lighting or
any lighting distribution boards.
 Supply of all types of laboratory Equipments as well as Laboratory facilities including
necessary instruments, chemicals and staff if required will be not be in our scope.
 Proper Site illumination should be required at the time of erection & commissioning of the
system as well Plant illumination is also excluded from our scope of supply & work.
 Emergency power supply and illumination system.
 All piping, cabling etc. beyond the termination points as mentioned in our offer.
 Lightening protection.
 Operation & Maintenance of the plant.
 Testing and inspection of the equipment at site should be in client scope along with third
party inspection.
 NOC/Approval from Statutory Bodies.
 Any other item not specifically mentioned in our scope.

G. Drw. & Doc. Submission & Inspection categories

Sl. No. Items Categories


1. Pressure Vessels B
2. Atm. Tank. B
3. Other Fabricated Items C
4. Shop Fabricated Piping- MS/CS C
5. Manual Valves C
6. Pressure Gauges D
7. Rotameter D
8. Proprietary Items D
9. Internals of Vessel D

The relative documents will be submitted during detail Engg. For Approval & References.

Sl. No. Drawing & Doc. Categories


1. P&ID A
2. Equipment layout A
3. Design Calculation sheet A
4. Vessel GA R
5. Individual Equipment foundation details R
6. Electro Mechanical Data sheet R
7. Operation & maintenance manual R
8. Valve Schedule R
Note: -
Category: - A- Approval of TDS before indent.
Category: - B- Stage wise and final inspection by QSPL. Only Final inspection by client if required.
Category: - C- Final inspection & clearance by AEL.
Category: - D- No physical inspection. Material despatch as per Manufacturer compliance
certificates.
Category: - R- Drawing & Doc. Submission for references.
ANNEXURE – IV: COMMERCIAL SCHEDULE
A. COMMERCIAL TERMS AND CONDITIONS
DELIVERY
We shall design, manufacture and supply the equipment within 12 to 14 weeks. The
above delivery period shall be reckoned from the date of receipt of advance and commercially
and technically clear purchase order, whichever is later.

WARRANTY FOR EQUIPMENT


All our equipment is thoroughly inspected before dispatch and therefore can be
depended upon for long and trouble free service. Our liability in respect of any defect or failure
in the equipment supplied and commissioned by us or any loss, injury or damage attributable
therefore shall be limited to making good by replacement or repairs, provided the equipment is
operated and maintained in accordance with our instructions and arise totally from proven faulty
design, materials or workmanship. This warranty shall be valid for a period of 12 months from the
date of commissioning of the equipment or 18 months from the date of last invoiced dispatch,
whichever is earlier. Our liability in no case shall exceed the invoiced value of the equipment
supplied by us, and we shall not be liable for any consequential damage or loss such as loss of
profits, loss of business opportunities, damage to goodwill or business reputation or any other
contractual liability or loss suffered by the Purchaser to third parties. All warranties other than
title either express or implied whether arising under law or equity including Warranties of
merchantability and fitness for a particular purpose are excluded from the contract. This is the
essence of the contract.

This warranty is valid subject to the following conditions:


a. Bought out components are guaranteed by us only to the extent of guarantees given to us by
our suppliers. Electrical components such as heaters, motors, contactors, etc., rubber
components and instruments such as pressure gauges, etc. are however not covered under
this warranty.
b. In respect of the equipment where dispatch after readiness is delayed due to specific
instructions or lack of instructions from you, the warranty will be limited to 18 months from
the date of readiness for dispatch of equipment as notified by us.
c. No repairs or replacements, unless authorized by us in writing, will be carried out by any
other party on our equipment during the warranty period.
d. The warranty period does not cover the following:
1. Normal wear and tear
2. Damages/defects arising out of mal-operation of the plant by the purchaser and
accidents.
3. The equipment or part there of being subject to accident, alteration, abuse or misuse.
4. The equipment not being operated and maintained as per Operation and Maintenance
Instructions.
WAREHOUSING CHARGES
Should dispatches be delayed on our purchaser's instructions or any other reason
attributable to Purchaser, warehousing expenses shall be payable by the Purchaser @2% of the
consignment value per month or part thereof.

FORCE MAJEURE
We shall be under no liability for delay in delivery/completion of work if we or our sub-
contractors/suppliers are prevented from discharging our respective obligations under the
contract for causes beyond our reasonable control including but not limited to war(whether
declared or not), invasion, acts of enemies, hostilities, riots, civil commotion, labour disturbance,
strikes, lockout, layoffs, mutiny, insurrection, rebellion, revolution, epidemics, accidents,
sabotage, fire, earthquake, floods, government orders and restrictions, legal enactment, delay or
inability to obtain materials due to change in Import policy or other statutory restrictions, lack of
transport facilities, interruptions/restrictions in power supply, damage to or breakdown of plant,
machinery and equipment etc.

CONSEQUENTIAL DAMAGES
Neither party shall at any time be liable to the other for any loss or profits or any similar
indirect damages, however, described, incurred or suffered by either party in respect of the
project.

VALIDITY
Unless previously revoked, our offer shall be valid for 30 days from the date of this
proposal.

GENERAL
Any condition or other matters pertaining to this offer not expressly stipulated will be a
matter of mutual discussions and agreement at the time of accepting the order.

NOTE:-
QSPL reserves the right to change or modify the equipment specifications.
The scope of supply is restricted to supply of equipment as specified in the proposal. Any
subsequent additions or alterations will be acceptable to us provided it is convenient to do so and
the prices and delivery period are suitably revised. Separate Purchase Order will be required for
Supply of the material & Supervision of Erection & commissioning.
B. PRICE AND TERMS OF PAYMENT
PRICE:-
Our most competitive price for the Design, engineering & Supply of the WTP
PlantScheme- OC-DMF- ACF-10.0 m3/hr. X 1 streamas described in the offer with shall be as
follows:

SL. PLANT Qty Units Unit Price Total Price


NO.
in USD in USD

Design, Supply, Testing &


Commissioning of WTP Plant:
1 Plant
Capacity – 10 m3/hr
1.

Total Price in USD

In Words:

PRICE BASIS:
 The above prices are CFR Benapole.

Please Note: If there are any statutory variations/implications in taxes and duties before the
expiry of delivery date, the same will be to your account.

TERMS OF PAYMENT
 100% of the total value of the order to be paid against irrevocable letter of credit payable
at site from a reputed bank.

Supervision of Erection & commissioning Charges:-


Our Supervision of Erection & commissioning Charges for the total water treatment
system as per annexure is Included.
(Service tax will be applicable extra at actual on the basic amount of supervision of
erection & commissioning charges.) Tools and tackles and Labour for erection and commissioning
are to be arranged by you. Our engineer will only supervise the erection and commissioning of
the Equipments to its proper care and control.

Yours sincerely,
For, Acumen Engineering Ltd.

Sumon Khan