Professional Documents
Culture Documents
Unity University Department of Management Post Graduate Program Operations Research Project Work I
Unity University Department of Management Post Graduate Program Operations Research Project Work I
Unity University Department of Management Post Graduate Program Operations Research Project Work I
DEPARTMENT OF MANAGEMENT
OPERATIONS RESEARCH
PROJECT WORK I
Tossa Engineering Hospital equipment manufacturing
Tossa Engineering hospital equipment manufacturing is a company that produces examination
coach and patient bed.
The company is found in Ferensay Legasion Gurara industry village and it is one of the biggest
and smart manufacturers. Most hospitals in the country use the product of the company even
hospitals found in regional cities.
Some of the constraints of the company are raw materials which are used for
inputs, labor availability, and capital especially for imported raw materials.
DECISSION VARIABLES
In the company decision variables are labor hour, machine hour or machine
capacity to produce products per hour and marketing hours to sell and buy
products. And the resources which are depleted due to extra cases
THE LIMITATIONS
Maximize Z= 12X1+16X2
Subject to:
10X1+20X2≤120
8X1+8X2≤80
Solution:
Max. Z= 12 X1 +16X2+OS1+OS2
2
Zj=∑ ( CBi ) +(aij)
i= j
ITERATION 1
CBi Cj
12 16 0 0 Solution
Basic
Variable X1 X2 S1 S2
16 X2 1 1/20 0 6 6/(1/2)=12
1/2
1 -2/5 1 32
0 S2 32/4=8
Zj 0 0 0 0 0
Ci-Zj 12 16 0 0
8 x 10 80
8− =8− =8−4=4
20 20
8 x 20 160
8− =8− =8−8=0
20 20
8x1 8 2
0− =0− =0− =−2/5
20 20 5
8 x0 0
1− =1− =1
20 20
8 x 120 960
80− =80− =80−48=32
20 20
ITERATION 2
Cj
CBi 12 16 0 0 Solution
Basic
Variable X1 X2 S1 S2
16 X2 0 1 1/10 -1/8 2
12 X1 1 0 -1/10 1/4 8
Zj 12 16 2/5 1 0
Ci-Zj 12 16 0 0
1
x4
1 2
−( )=0
2 4
1 /2 x 0
1−( )=1
4
1 2
x−
1 2 5
−( )=1/10
20 4
1
0− ( )
2
x1
4
=−1/8
1/ 2 x 32
6−( )=2
4
Therefore; the Optimal Solution of Z is 128 when the company produces X=12, X2= 16 or in
order to maximize the benefit of Tossa Engineering Hospital Equipment Manufacturing that
produces examination coach that the profit realized is 12 and patient bed the profit that is
realized is 16 the Optimal Solution of Z is 128. Because in maximization of Simplex method or
Simplex matrix Cj-Zj≤0 is optimality condition