Maccaferri BIMs

2 Strettamente confidenziale
3

Strettamente confidenziale
Global Presence, Local Knowledge

On-the-ground
presence in over
100 countries

3,000
employees

33
factories

70
subsidiaries

4
Aquaculture
Coastal Protection, Marine Structure & Pipeline Protection Nets/Cages

Rockfall Environment, Dewatering and Landfills Roads & Pavements


Protection
& Snow
Barriers

Tunnelling
Drainage of Structures

Retaining Walls
and Soil
Reinforcement Roads & Pavements
Hydraulic Works

Erosion Control

5 Strettamente confidenziale Basal Reinforcement


6 Strettamente confidenziale
We make innovation happen

7
8 Strettamente confidenziale
I’m Daniele Tubertini,
I come from Italy and
I work in MACCAFERRI HQ as
Civil Engineering Software Specialist
within the Corporate Technical Division
E-mail: d.tubertini@maccaferri.com

SETTLEMENTS AND DEFORMATIONS


I’ll bring you in a world tour through
MACCAFERRI BIMs

9
Let’s start!
Table of contents

1 WHY DO WE NEED BIM?

2 PRODUCT DIGITALISATION

3 MACCAFERRI BIM PROJECTS


1 WHY DO WE NEED BIM?
WHY DO WE NEED BIM?

11
Why do we need BIM?

BIM key benefits:


• Improvement of design and construction processes

• Optimisation of construction materials

• Prevention of interferences and errors on site

12
Why do we need BIM?

Terramesh System Wall


13
Why do we need BIM?

Construction Improvements
14
Why do we need BIM?

Direct Bridge Abutment with


Reinforced Soil
15
Why do we need BIM?

Construction Improvements
16
Why do we need BIM?

Construction Improvements
17
Why do we need BIM?

With BIM you can have:

• Real time collaboration

• Bill of Quantities always updated

• Life-cycle project management

18
Why do we need BIM?

Terramesh System Wall – Bill of Quantities in One Click


19
Why do we need BIM?

Terramesh System Wall – Bill of Quantities in One Click


20
Why do we need BIM?

UnitType StoneFillVolume Reinforcem.Type

Easy to extract BOQ


21
Why do we need BIM?

BIM & life cycle project management:


4D (time, stages & activities) & 5D (budgeted cost)
Why do we need BIM?

BIM & life cycle project management:


4D (time, stages & activities) & 5D (budgeted cost)
Why do we need BIM?

BIM & life cycle project management:


4D (time, stages & activities) & 5D (budgeted cost)
Why do we need BIM?

BIM & life cycle project management:


4D (time, stages & activities) & 5D (budgeted cost)
Why do we need BIM?

BIM & life cycle project management:


4D (time, stages & activities) & 5D (budgeted cost)
Why do we need BIM?

BIM & life cycle project management:


4D (time, stages & activities) & 5D (budgeted cost)
Why do we need BIM?

BIM & life cycle project management:


4D (time, stages & activities) & 5D (budgeted cost)
Why do we need BIM?

BIM & life cycle project management:


4D (time, stages & activities) & 5D (budgeted cost)
Why do we need BIM?

BIM & life cycle project management:


4D (time, stages & activities) & 5D (budgeted cost)
Why do we need BIM?

BIM & life cycle project management:


4D (time, stages & activities) & 5D (budgeted cost)
Why do we need BIM?

BIM & life cycle project management:


4D (time, stages & activities) & 5D (budgeted cost)
Why do we need BIM?

BIM & life cycle project management:


4D (time, stages & activities) & 5D (budgeted cost)
Why do we need BIM?

With BIM projects you have:

• Technical drawings derived from a unique model

• Specific products information accessible in one click

• Easy-to-build 3D views of the project

34
Why do we need BIM?

Terramesh System Wall - 3D views


35
Why do we need BIM?

Terramesh System Wall - Cross section


36
Why do we need BIM?

Terramesh System Wall - Front view


37
Why do we need BIM?

Terramesh Wall - Plan view for each layer


38
Why do we need BIM?

Terramesh Wall - Tech drawings


39
Why do we need BIM?

Terramesh Wall - Tech drawings


TERRAMESH
40
WALL TECH DRAWINGS
Why do we need BIM?

41
Why do we need BIM?

DIRECTIVE 2014/24/EU

DIRECTIVE 2014/24/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL


of 26 February 2014 on public procurement and repealing Directive 2004/18/EC

4. For public works contracts and design contests, Member States


may require the use of specific electronic tools, such as of building
information elecronic modelling tools or similar.

Which is the implementation of DIRECTIVE 2014/24/EU in the EU countries?

42
https://www.cloudalize.com/blog/bim-landscape-europe
Why do we need BIM?

British regulations for BIM: bs 1192, pas 1192, bs 8536

43
Why do we need BIM?

Italy – National Rules for Public Works


D.L. 18.04.2016, n. 50 & d.M. Mit n. 560 1.12.2017

Total amount of work BIM mandatory since

≥ € 100 MILLION 1/1/2019


≥ € 50 MILLION 1/1/2020
≥ € 15 MILLION 1/1/2021
≥ € 1 MILLION 1/1/2023
≤ € 1 MILLION 1/1/2025

BIM IS NOT AN OPTION: IT’S


BECOMING MANDATORY !!!
44
1 WHY DO WE NEED BIM?

2 PRODUCT DIGITALISATION

45
Product digitalisation

Maccaferri answered to the client’s needs GABION


WALL
with the creation and upload of BIM objects

GREEN
GABIONS
TERRAMESH

RENO
TERRAMESH
MATTRESS
SYSTEM

MINERAL
TERRAMESH
GEOTEXTILE

GEOGRIDS
Showroom
46
Product digitalisation

https://www.maccaferri.com/bim/ Maccaferri website


47
Product digitalisation

48
https://www.bimstore.co/manufacturers/maccaferri-ltd
Product digitalisation

Bimstore - Product download


49
Product digitalisation

INSTALLATION TDS
MANUAL
TENDER
BBA
SPEC
BIM
OBJECT

BROCHURE CE

TECH
CASE
GUIDE
HISTORY
DDS

50
Product digitalisation

Website links to the product


documentation inside BIM object

Product information
51
Product digitalisation

Inside each BIM object family,


there are all products grades / types

Product information
52
Product digitalisation

A change in the parameters implies an


update in the whole model and BIM object

53
Product digitalisation

54
Product digitalisation

55
Product digitalisation

56
Product digitalisation

57
Product digitalisation

58
Product digitalisation - Hydraulic Works
Product digitalisation - Hydraulic Works
Product digitalisation

MACRES SYSTEM
with 4 new BIM objects:
NEW ARRIVAL!!!
• MACRES PANEL
• PARAWEB GEOSTRAP
• COPING BEAM
• CORNER ELEMENT

Available on bimstore

MacRes System
61
Product digitalisation

EPDM Pad
Coping Beam Corner
Element Virtual
connections

Polymeric straps
(ParaWeb)
Geotextile Paraloop

MacRes System
62
Product digitalisation

Check it out on bimstore: https://www.bimstore.co/manufacturers/maccaferri-ltd

MacRes System
MACRES
63 SYSTEM
Product digitalisation

MacRes System
64
Product digitalisation

N. Panels = 832
N. Coping Beams = 110
Concrete C30/37= 251,47 mc
Structural soil= 18874,37 mc
Non-Woven Geotextile = 932,9 sqm
N. Paraloop = 3384
N. EPDM Pad = 1444
N. Virtual connections= 3528

ParaWeb Lengths:
2D30 = 3500,15 = 36 Rolls
MD27 = 15578,40 = 156 Rolls
MD36 = 11289,47 = 113 Rolls
2D30 = 25270,55 = 253 Rolls Macres System (Poland) –
Accurate BOQ in One Click
65
Product digitalisation

New BIM objects can be available on request

Rockfall Barrier
66
Product digitalisation

New BIM objects can be available on request

Rockfall Barrier
67
Product digitalisation

Rockfall Barrier
68
Product digitalisation / CIVIL 3D

CIVIL 3D subassemblies available on request

Maccaferri CIVIL 3D subassemblies


1 WHY DO WE NEED BIM?

2 PRODUCT DIGITALISATION

3 MACCAFERRI BIM PROJECTS

70
Maccaferri BIM Project

Oosterweel link project in Antwerp


71
Maccaferri BIM Project

Oosterweel link project in Antwerp


MINERAL
72
TERRAMESH WITH CULVERTS IN ESTONIA
Maccaferri BIM Project

73
Maccaferri BIM Project

Kosovo motorway project


74
Maccaferri BIM Project

BOQ
In One Click
TOTAL
MATERIAL UNIT
S=11'948 m2
TMS 3X2X0.5 +5% pc 428.00
TMS 3X2X1 +5% pc 5,760.00
MACTEX H35.1 +5% m2 19,025.00
PARALINK 500 +6% m2 18,490.00
PARALINK 300 +6% m2 14,190.00
PARAGRID 150 +7% m2 69,345.00

https://www.bechtel.com/projects/kosovo-motorway/

Kosovo motorway project


75
Maccaferri BIM Project

Kosovo motorway project


76
Maccaferri BIM Project

Mineral Terramesh with


Culverts in Estonia
77
Maccaferri BIM Project

Mineral Terramesh with


Culverts in Estonia
78
Maccaferri BIM Project

M49 Avonmouth project (Somerset, England)


79
Maccaferri BIM Project

NEW M49 JUNCTION 1

- The Junction will open up the


Europe’s Largest Brownfied site
(suitable for industrial and retail
development)

- Designed by Maccaferri UK
throughout the whole 2018 (Jan–
Nov 2018) helping and supporting
ARUP

- Galliford Try as main contractor –


works started in January 2019

M49 Avonmouth project (Somerset, England)

80 https://www.maccaferri.com/uk/mega-structure-economic-growth/
Maccaferri BIM Project

• Curves and different levels


• Green Terramesh
approaching concrete box
• Green Terramesh
approaching
MACWALL

Challenging geometries solved with BIM


81
Conclusions

BIM can give a competitive advantage in projects requiring


high engineering support and our capability has been highly
appreciated by the clients

Design with BIM processes lead to time and cost saving

BIM is becoming the standard for delivering infrastructure


projects and Maccaferri is ready to be your partner to deal with
BIM projects

82
Conclusions

MACCAFERRI IS ABLE TO FOLLOW


DESIGNER’S NEEDS IN TERMS OF SUPPORT
WITH BIM!

83
THANK YOU

For any info on Maccaferri BIM please contact the Maccaferri office which is closer to
you or visit Maccaferri website on maccaferri.com